ANSAL PROPERTIES & INFRASTRUCTURE LIMITED

UPRERACompany

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED (RERA ID: UPRERAPRM6378) is a company registered with UP-RERA since 2017. It has 103 projects on record with Estanzo, of which 89 are on RERA's NCLT list, 9 are in abeyance with RERA and 21 are on RERA's Default-on-QPR list.

Summarize this record with:ChatGPTPerplexityClaudeGrok

One legal entity’s record; a brand may register through several. Complaint counts are allegations, with no outcome attached.

Projects by this promoter

103 on record · 1 as co-promoter
Registered3De-registered2Abeyance9NCLT89each project counted once, under the authority’s own step
ANSAL API - CELEBRITY GREENS (F&G) SUSHANT GOLF CI UPRERA
UPRERAPRJ3405 · Lucknow
Promised completion 29 Mar 2021 · Extended
NCLT
ANSAL API - CELEBRITY MEADOWS (F,G,K,L) Sec I Sush UPRERA
UPRERAPRJ3206 · Lucknow
Promised completion 30 Sept 2022 · Extended
NCLT
ANSAL API- CELEBRITY MEADOWS (Towers Q,P,J,H) UPRERA
UPRERAPRJ9798 · Lucknow
Promised completion 14 Oct 2019 · Extended
NCLT
ANSALAPI-CELEBRITY WOODS, TOWER-B12 & B12A, GH-1B, UPRERA
UPRERAPRJ4960 · Lucknow
Promised completion 6 Sept 2022 · Extended
NCLT
ANSALAPI-CONVIENENT SHOPPING SECTOR-J/8 UPRERA
UPRERAPRJ5009 · Lucknow
Promised completion 10 Jul 2023 · Extended
NCLT
ANSAL API-EWS, GH-1, SEC-L/1 UPRERA
UPRERAPRJ3604 · Lucknow
Promised completion 24 Sept 2020 · Extended
NCLT
ANSAL API - EWS/LIG GH-6/K-3 SUSHANT GOLF CITY UPRERA
UPRERAPRJ3669 · Lucknow
Promised completion 19 Sept 2022 · Extended
NCLT
ANSAL API-EWS/LIG-PKT 2-SEC K-SGC LKO UPRERA
UPRERAPRJ10150 · Lucknow
Promised completion 13 Apr 2024 · Extended
NCLT
ANSAL API-EWS/LIG-PKT 5-SEC C -SGC LKO UPRERA
UPRERAPRJ10147 · Lucknow
Promised completion 30 Sept 2023 · Extended
Abeyance
Ansal API- GH-1, sector- I, Pocket A UPRERA
UPRERAPRJ4994 · Lucknow
Promised completion 30 Apr 2025 · Extended
NCLT
Ansal API- GH 1 Sector I, Pocket B UPRERA
UPRERAPRJ5035 · Lucknow
Promised completion 28 Feb 2025 · Extended
Abeyance
ANSALAPI-GH-3, SECTOR-I, SUSHANT GOLF CITY UPRERA
UPRERAPRJ5540 · Lucknow
Promised completion 10 May 2024 · Extended
Abeyance
ANSALAPI-GH-3, SECTOR-M, BLOCK-D, SUSHANT GOLF CIT UPRERA
UPRERAPRJ5524 · Lucknow
Promised completion 30 Sept 2022 · Extended
NCLT
ANSALAPI-GH-5, SECTOR-K, SUSHANT GOLF CITY UPRERA
UPRERAPRJ5507 · Lucknow
Promised completion 29 Nov 2018
NCLT
ANSAL API-GH7(EWS/LIG)-PKT 3-SEC K-SGC LKO UPRERA
UPRERAPRJ10146 · Lucknow
Promised completion 27 Jun 2026 · Extended
NCLT
ANSAL API - GOLF RESIDENCIA SECTOR - H SUSHANT GOLF CITY UPRERA
UPRERAPRJ468073 · Lucknow
Promised completion 29 Sept 2022 · Extended
NCLT
ANSAL API-GREEN FIELD RESIDENTIA TOWER C1 & C2, GH UPRERA
UPRERAPRJ3545 · Lucknow
Promised completion 30 Jun 2023 · Extended
NCLT
ANSAL API-MEDIA ENCLAVE, GH-1, SEC-J/3, SUSHANT GO UPRERA
UPRERAPRJ3060 · Lucknow
Promised completion 30 Jun 2022 · Extended
NCLT
ANSAL API-PARADISE CRYSTAL TOWER-C & D, GH-1, SECT UPRERA
UPRERAPRJ3382 · Lucknow
Promised completion 29 Mar 2021 · Extended
NCLT
ANSAL API - POCKET 1 SECTOR A SUSHANT GOLF CITY UPRERA
UPRERAPRJ9976 · Lucknow
Promised completion 20 Mar 2021 · Extended
NCLT

See the 1 as co-promoter

Showing 20 of 103 projects on record. See all 103 projects

Promoters sharing a director

none matched

Linked by a director’s DIN, never by name alone. Each company is its own record.

No other promoter shares a director with ANSAL PROPERTIES & INFRASTRUCTURE LIMITED on record. RERA lists its directors without a DIN, and names alone are never matched.

Filings for more time

95 filings
Extension filings95
Projects with at least one92 of 100
Longest single extension365 days - SUSHANT SERENE RESIDENCY PH2 T3E,T4E,T5D
Latest extension runs to27 Jun 2026 - ANSAL API-GH7(EWS/LIG)-PKT 3-SEC K-SGC LKO
Permits carrying a revalidation6 across 5 projects

Directors & ownership

6 named by UPRERA
Chairman
SUSHIL ANSAL
Director
Anoop Sethi
Director
Dr. Satish Chandra
Director
Kulamani Biswal
Director
PRANAV ANSAL
Director
Smt. Jagath Chandra

Promoter timeline

30 Nov 2010 - 28 Dec 2025
  1. Extension filed
    new completion date on file 27 Jun 2026as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  2. NCLT order
    official source ↗
  3. NCLT order
    official source ↗
  4. NCLT order
    official source ↗
  5. NCLT order
    official source ↗
  6. NCLT order
    official source ↗
  7. NCLT order
    official source ↗
  8. NCLT order
    official source ↗
  9. NCLT order
    official source ↗
  10. NCLT order
    official source ↗
  11. NCLT order
    official source ↗
  12. NCLT order
    official source ↗
Show 279 earlier filings
  1. NCLT order
    official source ↗
  2. NCLT order
    official source ↗
  3. NCLT order
    official source ↗
  4. NCLT order
    official source ↗
  5. NCLT order
    official source ↗
  6. NCLT order
    official source ↗
  7. NCLT order
    official source ↗
  8. NCLT order
    official source ↗
  9. NCLT order
    official source ↗
  10. NCLT order
    official source ↗
  11. NCLT order
    official source ↗
  12. NCLT order
    official source ↗
  13. NCLT order
    official source ↗
  14. NCLT order
    official source ↗
  15. NCLT order
    official source ↗
  16. NCLT order
    official source ↗
  17. NCLT order
    official source ↗
  18. NCLT order
    official source ↗
  19. NCLT order
    official source ↗
  20. NCLT order
    official source ↗
  21. NCLT order
    official source ↗
  22. NCLT order
    official source ↗
  23. NCLT order
    official source ↗
  24. NCLT order
    official source ↗
  25. NCLT order
    official source ↗
  26. NCLT order
    official source ↗
  27. NCLT order
    official source ↗
  28. NCLT order
    official source ↗
  29. NCLT order
    official source ↗
  30. NCLT order
    official source ↗
  31. NCLT order
    official source ↗
  32. NCLT order
    official source ↗
  33. NCLT order
    official source ↗
  34. NCLT order
    official source ↗
  35. NCLT order
    official source ↗
  36. NCLT order
    official source ↗
  37. NCLT order
    official source ↗
  38. NCLT order
    official source ↗
  39. NCLT order
    official source ↗
  40. NCLT order
    official source ↗
  41. NCLT order
    official source ↗
  42. NCLT order
    official source ↗
  43. NCLT order
    official source ↗
  44. NCLT order
    official source ↗
  45. NCLT order
    official source ↗
  46. NCLT order
    official source ↗
  47. NCLT order
    official source ↗
  48. NCLT order
    official source ↗
  49. NCLT order
    official source ↗
  50. NCLT order
    official source ↗
  51. NCLT order
    official source ↗
  52. NCLT order
    official source ↗
  53. NCLT order
    official source ↗
  54. NCLT order
    official source ↗
  55. NCLT order
    official source ↗
  56. NCLT order
    official source ↗
  57. NCLT order
    official source ↗
  58. NCLT order
    official source ↗
  59. NCLT order
    official source ↗
  60. NCLT order
    official source ↗
  61. NCLT order
    official source ↗
  62. NCLT order
    official source ↗
  63. NCLT order
    official source ↗
  64. NCLT order
    official source ↗
  65. NCLT order
    official source ↗
  66. NCLT order
    official source ↗
  67. NCLT order
    official source ↗
  68. NCLT order
    official source ↗
  69. NCLT order
    official source ↗
  70. NCLT order
    official source ↗
  71. NCLT order
    official source ↗
  72. NCLT order
    official source ↗
  73. NCLT order
    official source ↗
  74. NCLT order
    official source ↗
  75. Extension filed
    new completion date on file 30 Apr 2025as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  76. Extension filed
    new completion date on file 28 Feb 2025as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  77. Extension filed
    new completion date on file 29 Oct 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  78. Extension filed
    new completion date on file 10 May 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  79. Extension filed
    new completion date on file 13 Apr 2024official source ↗
  80. NCLT order
    official source ↗
  81. NCLT order
    official source ↗
  82. NCLT order
    official source ↗
  83. NCLT order
    official source ↗
  84. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  85. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  86. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  87. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  88. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  89. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  90. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  91. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  92. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  93. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  94. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  95. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  96. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  97. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  98. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  99. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  100. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  101. Extension filed
    new completion date on file 20 Mar 2024as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  102. Extension filed
    new completion date on file 12 Nov 2023official source ↗
  103. Extension filed
    new completion date on file 30 Sept 2023as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  104. Extension filed
    new completion date on file 10 Jul 2023official source ↗
  105. Extension filed
    new completion date on file 30 Jun 2023as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  106. Extension filed
    new completion date on file 30 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  107. Extension filed
    new completion date on file 30 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  108. Extension filed
    new completion date on file 30 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  109. Extension filed
    new completion date on file 19 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  110. Extension filed
    new completion date on file 6 Sept 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  111. Extension filed
    new completion date on file 30 Jun 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  112. Project registered
    official source ↗
  113. Extension filed
    new completion date on file 29 Mar 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  114. Extension filed
    new completion date on file 29 Sept 2022official source ↗
  115. Extension filed
    new completion date on file 29 Mar 2022as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  116. Extension filed
    new completion date on file 30 Dec 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  117. Extension filed
    new completion date on file 30 Sept 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  118. Extension filed
    new completion date on file 23 Sept 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  119. Extension filed
    new completion date on file 22 Sept 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  120. Extension filed
    new completion date on file 21 Dec 2021official source ↗
  121. Extension filed
    new completion date on file 30 Sept 2021official source ↗
  122. Extension filed
    new completion date on file 29 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  123. Extension filed
    new completion date on file 29 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  124. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  125. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  126. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  127. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  128. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  129. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  130. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  131. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  132. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  133. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  134. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  135. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  136. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  137. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  138. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  139. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  140. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  141. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  142. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  143. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  144. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  145. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  146. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  147. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  148. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  149. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  150. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  151. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  152. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  153. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  154. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  155. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  156. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  157. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  158. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  159. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  160. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  161. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  162. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  163. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  164. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  165. Extension filed
    new completion date on file 20 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  166. Extension filed
    new completion date on file 19 Mar 2021as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  167. Extension filed
    new completion date on file 29 Dec 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  168. Extension filed
    new completion date on file 22 Dec 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  169. Extension filed
    new completion date on file 30 Sept 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  170. Extension filed
    new completion date on file 24 Sept 2020as recorded by UPRERA: Six months extension in view of force majeure caused by covid-19 pandemicofficial source ↗
  171. Completion certificate filed
    official source ↗
  172. Project registered
    official source ↗
  173. Project registered
    official source ↗
  174. Project registered
    official source ↗
  175. Extension filed
    new completion date on file 14 Oct 2019official source ↗
  176. Permit revalidated
    valid to 15 Apr 2023as recorded by UPRERA: PLG/(BP)1534/2433official source ↗
  177. Permit revalidated
    valid to 15 Apr 2023as recorded by UPRERA: PLG/(BP)1534/2433official source ↗
  178. Project registered
    official source ↗
  179. Extension filed
    new completion date on file 5 Sept 2018official source ↗
  180. Extension filed
    new completion date on file 5 Sept 2018official source ↗
  181. Project registered
    official source ↗
  182. Project registered
    official source ↗
  183. Project registered
    official source ↗
  184. Project registered
    official source ↗
  185. Project registered
    official source ↗
  186. Project registered
    official source ↗
  187. Project registered
    official source ↗
  188. Project registered
    official source ↗
  189. Project registered
    official source ↗
  190. Project registered
    official source ↗
  191. Project registered
    official source ↗
  192. Project registered
    official source ↗
  193. Project registered
    official source ↗
  194. Project registered
    official source ↗
  195. Project registered
    official source ↗
  196. Project registered
    official source ↗
  197. Project registered
    official source ↗
  198. Project registered
    official source ↗
  199. Project registered
    official source ↗
  200. Project registered
    official source ↗
  201. Project registered
    official source ↗
  202. Project registered
    official source ↗
  203. Project registered
    official source ↗
  204. Project registered
    official source ↗
  205. Project registered
    official source ↗
  206. Project registered
    official source ↗
  207. Project registered
    official source ↗
  208. Project registered
    official source ↗
  209. Project registered
    official source ↗
  210. Project registered
    official source ↗
  211. Project registered
    official source ↗
  212. Project registered
    official source ↗
  213. Project registered
    official source ↗
  214. Project registered
    official source ↗
  215. Project registered
    official source ↗
  216. Project registered
    official source ↗
  217. Project registered
    official source ↗
  218. Project registered
    official source ↗
  219. Project registered
    official source ↗
  220. Project registered
    official source ↗
  221. Project registered
    official source ↗
  222. Project registered
    official source ↗
  223. Project registered
    official source ↗
  224. Project registered
    official source ↗
  225. Project registered
    official source ↗
  226. Project registered
    official source ↗
  227. Project registered
    official source ↗
  228. Project registered
    official source ↗
  229. Project registered
    official source ↗
  230. Project registered
    official source ↗
  231. Project registered
    official source ↗
  232. Project registered
    official source ↗
  233. Project registered
    official source ↗
  234. Project registered
    official source ↗
  235. Project registered
    official source ↗
  236. Project registered
    official source ↗
  237. Project registered
    official source ↗
  238. Project registered
    official source ↗
  239. Project registered
    official source ↗
  240. Project registered
    official source ↗
  241. Project registered
    official source ↗
  242. Project registered
    official source ↗
  243. Project registered
    official source ↗
  244. Project registered
    official source ↗
  245. Project registered
    official source ↗
  246. Project registered
    official source ↗
  247. Project registered
    official source ↗
  248. Project registered
    official source ↗
  249. Project registered
    official source ↗
  250. Project registered
    official source ↗
  251. Project registered
    official source ↗
  252. Project registered
    official source ↗
  253. Project registered
    official source ↗
  254. Project registered
    official source ↗
  255. Project registered
    official source ↗
  256. Project registered
    official source ↗
  257. Project registered
    official source ↗
  258. Project registered
    official source ↗
  259. Project registered
    official source ↗
  260. Project registered
    official source ↗
  261. Project registered
    official source ↗
  262. Project registered
    official source ↗
  263. Project registered
    official source ↗
  264. Project registered
    official source ↗
  265. Project registered
    official source ↗
  266. Project registered
    official source ↗
  267. Project registered
    official source ↗
  268. Project registered
    official source ↗
  269. Project registered
    official source ↗
  270. Project registered
    official source ↗
  271. Project registered
    official source ↗
  272. Project registered
    official source ↗
  273. Project registered
    official source ↗
  274. Project registered
    official source ↗
  275. Project registered
    official source ↗
  276. Permit revalidated
    valid to 24 Mar 2021as recorded by UPRERA: 35110official source ↗
  277. Permit revalidated
    valid to 23 Mar 2021as recorded by UPRERA: 35109official source ↗
  278. Permit revalidated
    as recorded by UPRERA: MSR 38685/119477official source ↗
  279. Permit revalidated
    as recorded by UPRERA: MSR 38685/119477official source ↗

Quarterly reports filed, by financial year

FY 2020-21
335 reports across 85 projects
FY 2021-22
143 reports across 38 projects
FY 2022-23
119 reports across 33 projects
FY 2023-24
64 reports across 27 projects
FY 2024-25
3 reports across 2 projects
Counts the reports UPRERA publishes as filed.

Statuses published without a date

UPRERA publishes no date for these, and Estanzo will not supply one, so they sit beside the axis rather than on it.
A filing is not an outcome.

Common questions about ANSAL PROPERTIES & INFRASTRUCTURE LIMITED

How many projects has ANSAL PROPERTIES & INFRASTRUCTURE LIMITED registered with RERA?

Estanzo holds 103 projects on record with UPRERA, filed by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED (promoter RERA ID UPRERAPRM6378). This counts filings by this legal entity only - a builder brand may file through several entities.

Who are the directors of ANSAL PROPERTIES & INFRASTRUCTURE LIMITED?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED disclosed 6 directors or partners to UPRERA, listed on this page as published. Estanzo shows the names and roles from that filing only.

When was ANSAL PROPERTIES & INFRASTRUCTURE LIMITED registered with RERA?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED has been registered with UPRERA since 28 Jul 2017.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗