Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
51.67%Q3'25
54.24%Q4'25
56.97%Q1'26
60.46%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6731
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start31 Mar 2017
Original start1 Jan 2016
Project duration114 months
AddressVaranasi, Varanasi
TehsilVaranasi
Applicant typeCompany
Applicant addressB 31/30, Opposite Ravidas Gate, Lanka, Varanasi - 221 005
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Building permit sanctioned

    45/14

  4. Permit revalidated

    45/14

  5. Building permit sanctioned

    45/14

  6. Permit revalidated (2)

  7. 2 building permits sanctioned

  8. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  9. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion16 Mar 2026
Revised completion15 Sept 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹90,500
Sanctioning authorityVaranasi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors195 · 1 · 17 (units from plan)
  • 3 BHK156 80%
  • 2 BHK26 13%
  • 4 BHK13 7%
ConfigurationUnitsCarpet area
4 BHK13129
3 BHK15691-99
2 BHK2661-67
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER, 4 BHK, 3 BHK, 2 BHK1719561-129
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Nishit Gupta
License CA/91/13697
619, Tower B, Advant Navis Business Park, Sect-142, Noida
Engineer
Yashpal Singh
R 307, Dua Complex, 24 Veer Savarkar Block, Vikas Marg, Shakarpur, Delhi
Contractor
Surendera Prasad
Chitaipur, Varanasi
Sr.Development work declared to RERA
1Demarcation of Plots
Plot line demarcarted
2Boundary Wall
2.1m. Heigh boundary wall composed of 230mm thick brickwork and RCC columns @ 4.0m. C/c along with plinth beam. The wall to be finished with plaster & paint.
3Road Work
6m. wide concrete road
4Footpaths
1.5m. Wide footpath with interlocking pavers along driveway & in green areas as/landscape design.
5Water Supply Including Drinking Water Facilities
Source of water would be city mains/ tanker water and bore well water after seeking necessary approvals for same. Water will be first stored in UG tanks from where is pumped to Overhead tanks and fed to individual units thru gravity system.
6Sewer System
Sewage to be collected thru drains & will disposed in municipal sevar line.
7Drain
Proper drainage system planned for both sewage & storm. Storm water is connected to rain water harvesting pits. All drainage below gravity lvl. Would be connected & drained into a sump & then pumped into the storm drain.
8Parks
Adequate open breathing space in the form of parks & green areas to be provided as/local byelaws. Parks are equipped with all facilities like jogging track, seating space, kids play area, etc.
9Tree Planting
Adequate no. Of plantation in the form of trees, shrubs, plants will be provided in green open spaces .
10Design For Electric Supply Including Street Lighting
We have design the system as per local electricity board and consider centralized Transformer , panel Feeder pillar and DG back for common service like external lighting , pump room etc.
11Community Buildings
It comprises of facilities of Hall, Yoga & Mediation room, Indoor games and Gym. It also has guest rooms for visitors.
12Treatment and Disposal System of Sewage and Sullage water
Centalized sewerage system shall be provided . All sewerage water should be collected through drain & will connect with the municiple sewerage system.
13Solid Waste Management And Disposal System
As per requirement.
14Water Conservation System
Proper sanitary fixtures with ISI mark and rated for water saving to be used. Rain water harvesting pits to be used for ground water recharge.
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area & all the equipment shall have energy efficient motor.
16Fire Protection And Fire Safety System
Underground RCC water storage tanks has been created within the Complex (common for all building). A pump house adjacent to the fire storage tank where various fire water pumps and associated equipment would be located & overhead tank shall be provided at terrace. All arrangements as per NBC shall be provided.
17Social Infrastructure And Other Public Amenities Including Public Health Services
"Following social infrastructure and public amenities will be provided: ? Power Back-up in common areas. ? round-the-clock security features, including CCTV surveillance systems, firefighting equipment and intercom facility ? Health Club "
18Emergency Evacuation Services
Fire evacuation plans to be installed in common areas
19Other Miscellaneous Work
Not applicable.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

4 permits

An approval and the date it runs to - not proof the work matching it was done.

4 sanctioning permits are on record with UPRERA, the latest valid to 12 Dec 2029. 3 of them carry a revalidation.

Sanctioned by Varanasi Development Authority · 17,008 sqm of land · an approved plan of 1 block and 195 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
45/1417 Mar 201816 Mar 202316 Mar 202616 Mar 2026—
165/2213 Dec 202412 Dec 202912 Dec 202915 Sept 202613 Dec 2024
165/22 Group Housing/Compounding/Dev. Authority/Vinyas/2024-2513 Dec 20241 Dec 20281 Dec 203115 Sept 202613 Dec 2024
45/1416 Sept 201815 Sept 202315 Sept 202615 Sept 202616 Sept 2018
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 15 Sept 2026.

#Granted fromExtended uptoNote
116 Mar 202615 Sept 2026Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

25 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Part of 393/128976.68 Sq. Feet—
Part of 397/159061.64 Sq. Feet—
Part of 403/22399.48 Sq. feet—
Part of 40427631.68 Sq. Feet—
Part of 405/161816.20 Sq. Feet—
393/12693Khasra
397/75489Khasra
403/2223Khasra
4042568Khasra
405/15745Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 17 Jan 2014.

Registry no.DateTypeArea
19017 Jan 2014other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 190
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New30 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jan 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Jan 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jan 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jan 2019 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per Plan
Fire safety (as filed with RERA)As per Plan
Health serviceAs per Plan
Renewable energyAs per Plan
Other facilitiesAs per Plan

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q251.67%CA ↗ · Arch ↗ · Eng ↗
2025-Q354.24%CA ↗ · Arch ↗ · Eng ↗
2025-Q456.97%CA ↗ · Arch ↗ · Eng ↗
2026-Q160.46%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSIDDHEE VINAYAK INFRAVILLAGE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM13044
PANAASCS1713M
CIN / TANALDS05111B
Name of chairmanPrashant Kejriwal
Registered addressB 31/30, Opposite Ravidas Gate, Lanka, Varanasi - 221 005
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S SID VIN INFRAVIL P L TRIDEV IND MS CL ACBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SID VIN INFRAVIL P L TRIDEV IND RERA ACBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasiA/C no.IFSCHDFC0001465
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. SIDDHEEVINAYAK INFRAVILLAGE PVT LTDBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about TRIDEV INDRAPRASTHA

Is TRIDEV INDRAPRASTHA RERA registered?

Yes. TRIDEV INDRAPRASTHA is registered with UPRERA under registration number UPRERAPRJ6731, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for TRIDEV INDRAPRASTHA?

The completion date filed with UPRERA is 15 Sept 2026. No completion certificate is on record yet.

Who is the builder of TRIDEV INDRAPRASTHA?

SIDDHEE VINAYAK INFRAVILLAGE PRIVATE LIMITED is the promoter entity that filed TRIDEV INDRAPRASTHA with UPRERA (promoter RERA ID UPRERAPRM13044). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted TRIDEV INDRAPRASTHA more time to complete?

UPRERA's record carries 1 completion extension for TRIDEV INDRAPRASTHA, the latest running to 15 Sept 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does TRIDEV INDRAPRASTHA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is TRIDEV INDRAPRASTHA located?

TRIDEV INDRAPRASTHA is registered in Varanasi, as filed with UPRERA.

What configurations are available in TRIDEV INDRAPRASTHA?

The unit plan filed with UPRERA lists OTHER, 4 BHK, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in TRIDEV INDRAPRASTHA?

The approved unit plan filed with UPRERA runs from 61 to 129 m² of carpet area (about 653 to 1,390 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in TRIDEV INDRAPRASTHA?

The approved unit plan describes 1 block and 195 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is TRIDEV INDRAPRASTHA?

About 46 units per acre: 195 planned units across 4.20 acres (17,008 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗