TRIDEV INDRAPRASTHA is a RERA-registered residential project by SIDDHEE VINAYAK INFRAVILLAGE PRIVATE LIMITED in Varanasi (RERA ID UPRERAPRJ6731). Registered with a completion deadline of 15 Sept 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6731 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Varanasi Development Authority |
| Proposed start | 31 Mar 2017 |
| Original start | 1 Jan 2016 |
| Project duration | 114 months |
| Address | Varanasi, Varanasi |
| Tehsil | Varanasi |
| Applicant type | Company |
| Applicant address | B 31/30, Opposite Ravidas Gate, Lanka, Varanasi - 221 005 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Building permit sanctioned
45/14
Permit revalidated
45/14
Building permit sanctioned
45/14
Permit revalidated (2)
2 building permits sanctioned
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 16 Mar 2026 |
| Revised completion | 15 Sept 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹90,500 |
| Sanctioning authority | Varanasi Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK156 80%
- 2 BHK26 13%
- 4 BHK13 7%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 13 | 129 |
| 3 BHK | 156 | 91-99 |
| 2 BHK | 26 | 61-67 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · OTHER, 4 BHK, 3 BHK, 2 BHK | 17 | 195 | 61-129 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot line demarcarted |
| 2 | Boundary Wall 2.1m. Heigh boundary wall composed of 230mm thick brickwork and RCC columns @ 4.0m. C/c along with plinth beam. The wall to be finished with plaster & paint. |
| 3 | Road Work 6m. wide concrete road |
| 4 | Footpaths 1.5m. Wide footpath with interlocking pavers along driveway & in green areas as/landscape design. |
| 5 | Water Supply Including Drinking Water Facilities Source of water would be city mains/ tanker water and bore well water after seeking necessary approvals for same. Water will be first stored in UG tanks from where is pumped to Overhead tanks and fed to individual units thru gravity system. |
| 6 | Sewer System Sewage to be collected thru drains & will disposed in municipal sevar line. |
| 7 | Drain Proper drainage system planned for both sewage & storm. Storm water is connected to rain water harvesting pits. All drainage below gravity lvl. Would be connected & drained into a sump & then pumped into the storm drain. |
| 8 | Parks Adequate open breathing space in the form of parks & green areas to be provided as/local byelaws. Parks are equipped with all facilities like jogging track, seating space, kids play area, etc. |
| 9 | Tree Planting Adequate no. Of plantation in the form of trees, shrubs, plants will be provided in green open spaces . |
| 10 | Design For Electric Supply Including Street Lighting We have design the system as per local electricity board and consider centralized Transformer , panel Feeder pillar and DG back for common service like external lighting , pump room etc. |
| 11 | Community Buildings It comprises of facilities of Hall, Yoga & Mediation room, Indoor games and Gym. It also has guest rooms for visitors. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centalized sewerage system shall be provided . All sewerage water should be collected through drain & will connect with the municiple sewerage system. |
| 13 | Solid Waste Management And Disposal System As per requirement. |
| 14 | Water Conservation System Proper sanitary fixtures with ISI mark and rated for water saving to be used. Rain water harvesting pits to be used for ground water recharge. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in external area & all the equipment shall have energy efficient motor. |
| 16 | Fire Protection And Fire Safety System Underground RCC water storage tanks has been created within the Complex (common for all building). A pump house adjacent to the fire storage tank where various fire water pumps and associated equipment would be located & overhead tank shall be provided at terrace. All arrangements as per NBC shall be provided. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services "Following social infrastructure and public amenities will be provided: ? Power Back-up in common areas. ? round-the-clock security features, including CCTV surveillance systems, firefighting equipment and intercom facility ? Health Club " |
| 18 | Emergency Evacuation Services Fire evacuation plans to be installed in common areas |
| 19 | Other Miscellaneous Work Not applicable. |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 12 Dec 2029. 3 of them carry a revalidation.
Sanctioned by Varanasi Development Authority · 17,008 sqm of land · an approved plan of 1 block and 195 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 45/14 | 17 Mar 2018 | 16 Mar 2023 | 16 Mar 2026 | 16 Mar 2026 | — | |
| 165/22 | 13 Dec 2024 | 12 Dec 2029 | 12 Dec 2029 | 15 Sept 2026 | 13 Dec 2024 | |
| 165/22 Group Housing/Compounding/Dev. Authority/Vinyas/2024-25 | 13 Dec 2024 | 1 Dec 2028 | 1 Dec 2031 | 15 Sept 2026 | 13 Dec 2024 | |
| 45/14 | 16 Sept 2018 | 15 Sept 2023 | 15 Sept 2026 | 15 Sept 2026 | 16 Sept 2018 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 15 Sept 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 16 Mar 2026 | 15 Sept 2026 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
25 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Part of 393/1 | 28976.68 Sq. Feet | — |
| Part of 397/1 | 59061.64 Sq. Feet | — |
| Part of 403/2 | 2399.48 Sq. feet | — |
| Part of 404 | 27631.68 Sq. Feet | — |
| Part of 405/1 | 61816.20 Sq. Feet | — |
| 393/1 | 2693 | Khasra |
| 397/7 | 5489 | Khasra |
| 403/2 | 223 | Khasra |
| 404 | 2568 | Khasra |
| 405/1 | 5745 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 17 Jan 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 190 | 17 Jan 2014 | other | — |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 190 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 30 Jan 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 31 Jan 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 31 Jan 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 31 Jan 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Jan 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jan 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jan 2019 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | As per Plan |
| Fire safety (as filed with RERA) | As per Plan |
| Health service | As per Plan |
| Renewable energy | As per Plan |
| Other facilities | As per Plan |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 51.67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 54.24% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 56.97% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 60.46% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SIDDHEE VINAYAK INFRAVILLAGE PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM13044 |
| PAN | AASCS1713M |
| CIN / TAN | ALDS05111B |
| Name of chairman | Prashant Kejriwal |
| Registered address | B 31/30, Opposite Ravidas Gate, Lanka, Varanasi - 221 005 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Varanasi
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S SID VIN INFRAVIL P L TRIDEV IND MS CL ACBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SID VIN INFRAVIL P L TRIDEV IND RERA ACBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasiA/C no.IFSCHDFC0001465 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S. SIDDHEEVINAYAK INFRAVILLAGE PVT LTDBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about TRIDEV INDRAPRASTHA
Is TRIDEV INDRAPRASTHA RERA registered?
Yes. TRIDEV INDRAPRASTHA is registered with UPRERA under registration number UPRERAPRJ6731, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for TRIDEV INDRAPRASTHA?
The completion date filed with UPRERA is 15 Sept 2026. No completion certificate is on record yet.
Who is the builder of TRIDEV INDRAPRASTHA?
SIDDHEE VINAYAK INFRAVILLAGE PRIVATE LIMITED is the promoter entity that filed TRIDEV INDRAPRASTHA with UPRERA (promoter RERA ID UPRERAPRM13044). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted TRIDEV INDRAPRASTHA more time to complete?
UPRERA's record carries 1 completion extension for TRIDEV INDRAPRASTHA, the latest running to 15 Sept 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does TRIDEV INDRAPRASTHA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is TRIDEV INDRAPRASTHA located?
TRIDEV INDRAPRASTHA is registered in Varanasi, as filed with UPRERA.
What configurations are available in TRIDEV INDRAPRASTHA?
The unit plan filed with UPRERA lists OTHER, 4 BHK, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in TRIDEV INDRAPRASTHA?
The approved unit plan filed with UPRERA runs from 61 to 129 m² of carpet area (about 653 to 1,390 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in TRIDEV INDRAPRASTHA?
The approved unit plan describes 1 block and 195 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is TRIDEV INDRAPRASTHA?
About 46 units per acre: 195 planned units across 4.20 acres (17,008 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗