UCHDPL- EDEN is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ678818). Registered with a completion deadline of 30 Jun 2029.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ678818 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Sept 2024 |
| Project duration | 58 months |
| Address | PLOT NO.-757, DASNA, KAZIPURA MORE,NH-9 ,GHAZIABAD, GH-08 SECTOR-05 ,WAVE CITY, GHAZIABAD, GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (5)
6 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Sept 2024 |
| Original completion | 30 Jun 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,11,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK512 91%
- SHOP51 9%
- OTHER1 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 512 | 95-104 |
| OTHER | 1 | 992 |
| SHOP | 51 | 15-15 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| CONVENIENT SHOP · OTHER, SHOP | 4 | 52 | 15-15 |
| TOWER-4 · 3 BHK | 32 | 128 | 95-97 |
| TOWER-5 · 3 BHK | 32 | 128 | 95 |
| TOWER-6 · 3 BHK | 32 | 128 | 95 |
| TOWER-7 · 3 BHK | 32 | 128 | 104 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plots Demarcated as per Approved Layout. |
| 2 | Boundary Wall Boundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m. |
| 3 | Road Work Width (m) Width of Carriage way (m) Width of Footpath (m) GSB 9mm) WMM (mm) RCC (mm)
9 m 9 0 150 100 200
Note; Cross Sections are enclosed as Annexure |
| 4 | Footpaths Width (m) Width of Footpath (m) GSB (mm) RCC (mm)
NA 2100 75 150 |
| 5 | Water Supply Including Drinking Water Facilities 1) The Water supply planned to provide 24 x 7 Water supply.
2) CPVC/UPVC-SC40/80 pipe for water supply network.
3) 1155 KL RCC storage tanks (770 KL UGT and 220 KL OHT).
4) Tube-Wells. |
| 6 | Sewer System 1) DWC pipe class SN4 has been used.
2) Manholes/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm. |
| 7 | Drain 1) RCC pipe class NP2 has been used.
2) Manholes/Chambers made with Brick Masonry in Conical shape with dia 900mm to 1500mm. |
| 8 | Parks Wire Fencing along boundary, Grassing and tree Plantation. |
| 9 | Tree Planting One Tree on one side of 9m road. |
| 10 | Design For Electric Supply Including Street Lighting 1) 3150 KVA Dry Type Transformer (33kv/415 V) -2nos.
2) 5m cast Iron Pole with GI Ribbed /Grooved extrusion and single arm bracket Street light poles with 75 watt cast iron LED fixture.
3) Feeder Panels-4 way, 6 way, 8way and 12 way. |
| 11 | Community Buildings 29000 sqft. (aprx.) Club facility in planned for the proposed development. |
| 12 | Treatment and Disposal System of Sewage and Sullage water 565 KLD STP is planned with the premise. |
| 13 | Solid Waste Management And Disposal System 1) Collection shall be ensured from each household.
2) Segregation and waste treatment within the premises.
3) Organic waste is composted with the help of Automatic organic waste converter machine. |
| 14 | Water Conservation System Rain water harvesting pits planned in green areas of the proposed development. |
| 15 | Energy Management System Including Use of Renewable Energy NA. |
| 16 | Fire Protection And Fire Safety System Fire staircase and FHC , is planned at each floor as per NBC requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA. |
| 18 | Emergency Evacuation Services Fire staircase planned as per NBC requirement. |
| 19 | Other Miscellaneous Work NA. |
Registered agents
8 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Amardeep platinum estates | UPRERAAGT18979 |
| 2 | Amit Bidhuri | UPRERAAGT17591 |
| 3 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 4 | BHARTI MITTAL | UPRERAAGT16599 |
| 5 | CAPITALBOON CONSULTING | UPRERAAGT18663 |
| 6 | Rathi Global Realty Services Private Limited | UPRERAAGT21920 |
| 7 | Realty Solutions | UPRERAAGT25051 |
| 8 | SUNIL KMAR | UPRERAAGT21636 |
Permits & extensions
6 permits
An approval and the date it runs to - not proof the work matching it was done.
6 sanctioning permits are on record with UPRERA, the latest valid to 30 Jun 2030. 5 of them carry a revalidation, the latest valid to 30 Jun 2030.
Sanctioned by Ghaziabad Development Authority · 21,136 sqm of land · an approved plan of 5 blocks and 564 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2029 | 29 Jun 2032 | 30 Jun 2029 | — | |
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2029 | 29 Jun 2032 | 30 Jun 2029 | 1 Jul 2024 valid to 30 Jun 2029 | |
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2029 | 29 Jun 2032 | 30 Jun 2029 | 1 Jul 2024 valid to 30 Jun 2029 | |
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2030 | 29 Jun 2032 | 30 Jun 2029 | 1 Jul 2024 valid to 30 Jun 2030 | |
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2029 | 29 Jun 2032 | 30 Jun 2029 | 1 Jul 2024 | |
| GDA/BP/23-24/1411 | 1 Jul 2024 | 30 Jun 2029 | 29 Jun 2032 | 30 Jun 2029 | 1 Jul 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary| Khatauni extract · 2024-2025 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2024-2025 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2024-2025 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2024-2025 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2024-2025 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 6152 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Lease deed · P201231 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · 071999 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Lease deed · R083759 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · P201231 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · P201231 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · A133716 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · A131742 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6152 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 563110 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Lease deed · P201231 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Registry document · A131730 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 2023-2024 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2023-2024 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 2023-2024 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Sept 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 26 Jul 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Jul 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 26 Jul 2024 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 26 Jul 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 Jul 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Jul 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Jul 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Jul 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 9 Sept 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 4 Sept 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 4 Sept 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 26 Jul 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 Jul 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 8 Aug 2024 ↗ |
Quarterly progress reports
8 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
8 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 18.07% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 22% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 26.39% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 32.02% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Uppal Chadha Hi-Tech Developers Pvt. Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5538 |
| PAN | AAACU7200M |
| CIN / TAN | U45201DL2004PTC128784 |
| Registered address | M-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UCHDPL COLLECTION ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI ,GHAZIABADBranch addressSHOP NO.-14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PARDESH -201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UCHDPL SEPARATE ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI, GHAZIABADBranch addressSHOP NO. -14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD , UTTAR PARDESH -201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UCHDPL RERA TRANSACTION ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI, GHAZIABADBranch addressSHOP NO. -14A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about UCHDPL- EDEN
Is UCHDPL- EDEN RERA registered?
Yes. UCHDPL- EDEN is registered with UPRERA under registration number UPRERAPRJ678818, registered on 21 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for UCHDPL- EDEN?
The completion date filed with UPRERA is 30 Jun 2029. No completion certificate is on record yet.
Who is the builder of UCHDPL- EDEN?
Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL- EDEN with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does UCHDPL- EDEN have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is UCHDPL- EDEN located?
UCHDPL- EDEN is registered in GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad, as filed with UPRERA.
What configurations are available in UCHDPL- EDEN?
The unit plan filed with UPRERA lists 3 BHK, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in UCHDPL- EDEN?
The approved unit plan filed with UPRERA runs from 15 to 992 m² of carpet area (about 158 to 10,683 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in UCHDPL- EDEN?
The approved unit plan describes 5 blocks and 564 units of which 513 are homes and 51 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is UCHDPL- EDEN?
About 108 units per acre: 564 planned units across 5.22 acres (21,136 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗