UCHDPL- EDEN

UPRERARegistered

UCHDPL- EDEN is a RERA-registered residential project by Uppal Chadha Hi-Tech Developers Pvt. Ltd. in GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ678818). Registered with a completion deadline of 30 Jun 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
18.07%Q3'25
22%Q4'25
26.39%Q1'26
32.02%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ678818
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Sept 2024
Project duration58 months
AddressPLOT NO.-757, DASNA, KAZIPURA MORE,NH-9 ,GHAZIABAD, GH-08 SECTOR-05 ,WAVE CITY, GHAZIABAD, GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (5)

  2. 6 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Sept 2024
Original completion30 Jun 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,11,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors564 · 5 · 33 (units from plan)
Homes · commercial units513 · 51 (shops and offices filed in the same plan)
  • 3 BHK512 91%
  • SHOP51 9%
  • OTHER1 <1%
ConfigurationUnitsCarpet area
3 BHK51295-104
OTHER1992
SHOP5115-15
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
CONVENIENT SHOP · OTHER, SHOP45215-15
TOWER-4 · 3 BHK3212895-97
TOWER-5 · 3 BHK3212895
TOWER-6 · 3 BHK3212895
TOWER-7 · 3 BHK32128104
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NIRAJ KUMAR NANDA
License CA/2009/46122
C-1, SECTOR-3, NOIDA UTTAR PRADESH PIN-201301
Engineer
DR. RAJEEV DUA
202 AND, HIMLAND HOUSE, COMMERCIAL COMPLEX, KARAMPURA, NEW DELHI-110015
Contractor
INFRA THIRTEEN PVT LTD
SECTOR-17, LIMEWOOD ENCLAVE, WAVE CITY, KACHERA VILLAGE, WAVE CITY, GHAZIABAD
Sr.Development work declared to RERA
1Demarcation of Plots
Plots Demarcated as per Approved Layout.
2Boundary Wall
Boundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m.
3Road Work
Width (m) Width of Carriage way (m) Width of Footpath (m) GSB 9mm) WMM (mm) RCC (mm) 9 m 9 0 150 100 200 Note; Cross Sections are enclosed as Annexure
4Footpaths
Width (m) Width of Footpath (m) GSB (mm) RCC (mm) NA 2100 75 150
5Water Supply Including Drinking Water Facilities
1) The Water supply planned to provide 24 x 7 Water supply. 2) CPVC/UPVC-SC40/80 pipe for water supply network. 3) 1155 KL RCC storage tanks (770 KL UGT and 220 KL OHT). 4) Tube-Wells.
6Sewer System
1) DWC pipe class SN4 has been used. 2) Manholes/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm.
7Drain
1) RCC pipe class NP2 has been used. 2) Manholes/Chambers made with Brick Masonry in Conical shape with dia 900mm to 1500mm.
8Parks
Wire Fencing along boundary, Grassing and tree Plantation.
9Tree Planting
One Tree on one side of 9m road.
10Design For Electric Supply Including Street Lighting
1) 3150 KVA Dry Type Transformer (33kv/415 V) -2nos. 2) 5m cast Iron Pole with GI Ribbed /Grooved extrusion and single arm bracket Street light poles with 75 watt cast iron LED fixture. 3) Feeder Panels-4 way, 6 way, 8way and 12 way.
11Community Buildings
29000 sqft. (aprx.) Club facility in planned for the proposed development.
12Treatment and Disposal System of Sewage and Sullage water
565 KLD STP is planned with the premise.
13Solid Waste Management And Disposal System
1) Collection shall be ensured from each household. 2) Segregation and waste treatment within the premises. 3) Organic waste is composted with the help of Automatic organic waste converter machine.
14Water Conservation System
Rain water harvesting pits planned in green areas of the proposed development.
15Energy Management System Including Use of Renewable Energy
NA.
16Fire Protection And Fire Safety System
Fire staircase and FHC , is planned at each floor as per NBC requirement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA.
18Emergency Evacuation Services
Fire staircase planned as per NBC requirement.
19Other Miscellaneous Work
NA.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

8 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Amardeep platinum estatesUPRERAAGT18979
2Amit BidhuriUPRERAAGT17591
3ANAROCK Property Consultants Private LimitedUPRERAAGT10265
4BHARTI MITTALUPRERAAGT16599
5CAPITALBOON CONSULTINGUPRERAAGT18663
6Rathi Global Realty Services Private LimitedUPRERAAGT21920
7Realty SolutionsUPRERAAGT25051
8SUNIL KMARUPRERAAGT21636
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

6 permits

An approval and the date it runs to - not proof the work matching it was done.

6 sanctioning permits are on record with UPRERA, the latest valid to 30 Jun 2030. 5 of them carry a revalidation, the latest valid to 30 Jun 2030.

Sanctioned by Ghaziabad Development Authority · 21,136 sqm of land · an approved plan of 5 blocks and 564 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
GDA/BP/23-24/14111 Jul 202430 Jun 202929 Jun 203230 Jun 2029—
GDA/BP/23-24/14111 Jul 202430 Jun 202929 Jun 203230 Jun 20291 Jul 2024
valid to 30 Jun 2029
GDA/BP/23-24/14111 Jul 202430 Jun 202929 Jun 203230 Jun 20291 Jul 2024
valid to 30 Jun 2029
GDA/BP/23-24/14111 Jul 202430 Jun 203029 Jun 203230 Jun 20291 Jul 2024
valid to 30 Jun 2030
GDA/BP/23-24/14111 Jul 202430 Jun 202929 Jun 203230 Jun 20291 Jul 2024
GDA/BP/23-24/14111 Jul 202430 Jun 202929 Jun 203230 Jun 20291 Jul 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 2024-2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2024-2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2024-2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2024-2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2024-2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 6152
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · P201231
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · 071999
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · R083759
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · P201231
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · P201231
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · A133716
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · A131742
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6152
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 563110
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · P201231
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · A131730
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 2023-2024
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2023-2024
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 2023-2024
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Sept 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New26 Jul 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New26 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Jul 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Jul 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Jul 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Jul 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Sept 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New4 Sept 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Sept 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Jul 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New8 Aug 2024 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q1.

QuarterConstructionCertificates
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q218.07%CA ↗ · Arch ↗ · Eng ↗
2025-Q322%CA ↗ · Arch ↗ · Eng ↗
2025-Q426.39%CA ↗ · Arch ↗ · Eng ↗
2026-Q132.02%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUppal Chadha Hi-Tech Developers Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM5538
PANAAACU7200M
CIN / TANU45201DL2004PTC128784
Registered addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UCHDPL COLLECTION ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI ,GHAZIABADBranch addressSHOP NO.-14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PARDESH -201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UCHDPL SEPARATE ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI, GHAZIABADBranch addressSHOP NO. -14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD , UTTAR PARDESH -201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UCHDPL RERA TRANSACTION ACCOUNT FOR EDENBankPUNJAB AND SIND BANKBranchKAUSHAMBI, GHAZIABADBranch addressSHOP NO. -14A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH-201010Branch districtGhaziabad, Uttar PradeshA/C no.IFSCPSIB0021226Branch emailk1226atpsb.co.in
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about UCHDPL- EDEN

Is UCHDPL- EDEN RERA registered?

Yes. UCHDPL- EDEN is registered with UPRERA under registration number UPRERAPRJ678818, registered on 21 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for UCHDPL- EDEN?

The completion date filed with UPRERA is 30 Jun 2029. No completion certificate is on record yet.

Who is the builder of UCHDPL- EDEN?

Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed UCHDPL- EDEN with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does UCHDPL- EDEN have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UCHDPL- EDEN located?

UCHDPL- EDEN is registered in GH-08, SECTOR-05, WAVE CITY, GHAZIABAD, Ghaziabad, as filed with UPRERA.

What configurations are available in UCHDPL- EDEN?

The unit plan filed with UPRERA lists 3 BHK, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in UCHDPL- EDEN?

The approved unit plan filed with UPRERA runs from 15 to 992 m² of carpet area (about 158 to 10,683 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in UCHDPL- EDEN?

The approved unit plan describes 5 blocks and 564 units of which 513 are homes and 51 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is UCHDPL- EDEN?

About 108 units per acre: 564 planned units across 5.22 acres (21,136 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗