Orion Homes

UPRERARegistered

Orion Homes is a RERA-registered residential project by DIVYANSH & UPPAL LLP in Sector-6, Aditya World City, Ghaziabad (RERA ID UPRERAPRJ265536). Registered with a completion deadline of 31 May 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
81%Q3'25
25%Q4'25
30%Q1'26
36%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ265536
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Jun 2024
Project duration60 months
AddressPlot No. GH-3, Sector No- 6, Aditya World City, Ghaziabad, UP-201002., Sector-6, Aditya World City, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeLimited Liability Partnership (LLP)
Applicant addressA 76 KANTI NAGAR, East Delhi, DELHI, Delhi, India, 110051
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    Group Housing/06082/GDA/BP-22-23/1035/15122023

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered22 Apr 2024
Original completion31 May 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹59,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors348 · 2 · 20 (units from plan)
Homes · commercial units346 · 2 (shops and offices filed in the same plan)
  • 3 BHK177 51%
  • 4 BHK97 28%
  • 2 BHK36 10%
  • 1 BHK36 10%
  • SHOP2 1%
ConfigurationUnitsCarpet area
4 BHK97120-151
3 BHK17786-151
SHOP27-14
2 BHK3637
1 BHK3631
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower-A · 4 BHK, 3 BHK2027486-151
Tower-B · SHOP, 2 BHK, 1 BHK13747-37
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL MITTAL
License CA/98/23185
B-34, SECTOR-67, NOIDA
Engineer
V.D SHARMA
B-24, SECTOR-67, NOIDA-201301
Contractor
Divyansh and Uppal LLP
NH-24, CITY COMMERCIAL, AWC, CC/GF-12, GHAZIABAD
Sr.Development work declared to RERA
1Demarcation of Plots
THE DEMARCATION OF PROJECT WILL BE DONE BY RCC/BRICKWORK BOUNDARY WALL(2.5 MTR TO 3 MTR IN HEIGHT APPROX.) WITH PLEASING DESIGN.
2Boundary Wall
RCC/BRICK WORK BOUNDARY WALL (2.5 MTR TO 3 MTR IN HEIGHT APPROX.)WILL BE CONSTRUCTED.
3Road Work
7.5 MTR WIDE INTERNAL ROADS WILL BE CONSTRUCTED . IT WILL BE CONSTRUCTED WITH DESIGNER PAVERS AND TRIMIX(RCC FINISH).
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
WATER SUPPLY WILL BE DONE WITH CPVC/PVC PIPES. AS PER DRAWING OF OUR CONSULTANT. 24 HRS WATER SUPPLY. MOTORS TANKS WILL BE CONSTRUCTED FOR UNENTRUPTED SUPPLY OF WATER. DRINGING WATER WILL BE AVAILABLE ON GROUND FLOOR LEVEL.
6Sewer System
SEWER SYSTEM IN BUILDING WILL BE WITH PVC PIPE AND UNDERGROUND SEWER SYSTEM WILL BE WITH RCC PIPE , AS PER DRAWING OF OUR CONSULTANT AND SAME WILL BE CONNECTED TO TOWNSHIP LEVEL STP.
7Drain
WASTE DRAIN AND RAINWATER SYSTEM WILL BE CONSTRUCTED USING PVC PIPE TO OUTER DRAIN, AS DRAWING OF OUR CONSULTANT.
8Parks
PARK LANDSCAPING WILL BE DEVELOPED AS PER LANDSCAPE PLAN.
9Tree Planting
TREE PLANTATION WILL BE DONE AS PER LANDSCAPE PLAN.
10Design For Electric Supply Including Street Lighting
THE ELECTRIC SUPPLY ALONG WITH POWER BACKUP WILL BE PROVIDED WITHE 50 PERCENT DIVERSITY FACTOR AS PER MEP/CONSULTANT/ARCHITECT.
11Community Buildings
YES, LUXURIOUS CLUB WILL BE CONSTRUCTED.
12Treatment and Disposal System of Sewage and Sullage water
S.T.P AND THROUGH AUTHORITY SEWERAGE SYSTEM. WE WILL USE THE TREATED COMPOST IN PLANTATION ACTIVITIES.
13Solid Waste Management And Disposal System
YES, ORGANIC WASTE CONVERTOR, COLLECTION BINS AND SEGREGATION TABLE WILL BE CONSTRUCTED AS PER DRAWING.
14Water Conservation System
YES, RAIN WATER HARVESTING PITS WILL BE CONSTRUCTED AS PER DRAWINGS.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
YES, AS PER MEP/CONSULTANT/ARCHITECT WE WILL CONSTRUCT A FULL AUTOMATED FIRE FIGHTING SYSTEM.
17Social Infrastructure And Other Public Amenities Including Public Health Services
YES, PROPER WATER SUPPLY AND SANITARY FACILITIES ON GROUND FLOOR. TOILES WILL BE PROVIED ON GROUND FLOORS.
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1PROPSHOPUPRERAAGT10129
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 29 Jan 2029. 1 of them carries a revalidation, valid to 30 Jul 2031.

Sanctioned by Ghaziabad Development Authority · 10,789 sqm of land · an approved plan of 2 blocks and 348 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
GROUP HOUSING/06082/GDA/BP/22-23/1035/1512202330 Jan 202429 Jan 202929 Jan 203231 May 2029—
Group Housing/06082/GDA/BP-22-23/1035/1512202330 Jan 202429 Jan 202929 Jul 203431 May 202930 Jan 2024
valid to 30 Jul 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
22653670Khasra
22664050Khasra
22705060Khasra
22752150Khasra
22764300Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 18599/51-100/34/03.01.2022
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 2008
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1424-1429
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 6712//5960/05/09/2006
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New26 Feb 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Feb 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Feb 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Feb 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Feb 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Feb 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Feb 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Feb 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New27 Feb 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New9 Mar 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New9 Mar 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New9 Mar 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New27 Feb 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New26 Feb 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q281%CA ↗ · Arch ↗ · Eng ↗
2025-Q325%CA ↗ · Arch ↗ · Eng ↗
2025-Q430%CA ↗ · Arch ↗ · Eng ↗
2026-Q136%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameDIVYANSH & UPPAL LLP
RolePromoter · current
RERA IDUPRERAPRM277101
PANAATFD0799C
CIN / TANDELD26957A
Registered addressA 76 KANTI NAGAR, East Delhi, DELHI, Delhi, India, 110051
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
DULLP A/C ORION HOMES COLLECTION A/CBankHDFC BANK LTDBranchINDRAPURAM 2Branch addressSTILLT FLOOR, SHOP-3 & 4, BLOCK-B, PINNACLE TOWER, PLOT NO-GH-7, MAIN ROAD, AHINSA KHAND-II, GHAZIABAD, UP-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0005280Branch emailKULDEEP.JAIN@HDFCBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
DULLP A/C ORION HOMES SEPARATE A/CBankHDFC BANK LTDBranchINDRAPURAM 2Branch addressSTILT FLOOR, SHOP-3 AND 4, BLOCK-B, PINNACLE TOWER, PLOT NO-GH-7, MAIN ROAD, AHINSA KHAND-II, GHAZIABAD, UP-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0005280
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
DULLP A/C TRANS A/C ORION HOMESBankHDFC BANK LTDBranchINDRAPURAM 2Branch addressSTILT FLOOR, SHOP-3 AND 4, BLOCK-B, PINNACLE TOWER, PLOT NO-GH-7, MAIN ROAD, AHINSA KHAND-II, GHAZIABAD, UP-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0005280
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Sanctioning permit
no. 2
Group Housing/06082/GDA/BP-22-23/1035/15122023
newly filed with RERA
16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Orion Homes

Is Orion Homes RERA registered?

Yes. Orion Homes is registered with UPRERA under registration number UPRERAPRJ265536, registered on 22 Apr 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Orion Homes?

The completion date filed with UPRERA is 31 May 2029. No completion certificate is on record yet.

Who is the builder of Orion Homes?

DIVYANSH & UPPAL LLP is the promoter entity that filed Orion Homes with UPRERA (promoter RERA ID UPRERAPRM277101). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Orion Homes have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Orion Homes located?

Orion Homes is registered in Sector-6, Aditya World City, Ghaziabad, as filed with UPRERA.

What configurations are available in Orion Homes?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK, SHOP, 2 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Orion Homes?

The approved unit plan filed with UPRERA runs from 7 to 151 m² of carpet area (about 75 to 1,625 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Orion Homes?

The approved unit plan describes 2 blocks and 348 units of which 346 are homes and 2 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Orion Homes?

About 131 units per acre: 348 planned units across 2.67 acres (10,789 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗