UNIWEST HUB

UPRERARegistered

UNIWEST HUB is a RERA-registered mixed project by UNIWEST INFRATECH PRIVATE LIMITED in KH 113M MIRJAPUR PARGANA DANKAUR GAUTAM BUDDH NAGAR, Gautam Budh Nagar (RERA ID UPRERAPRJ872184). Registered with a completion deadline of 20 Jun 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
15%Q3'25
20%Q4'25
23%Q1'26
23%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ872184
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start25 Sept 2024
Project duration33 months
AddressKH 113M MIRJAPUR PARGANA DANKAUR GAUTAM BUDDH NAGAR, KH 113M MIRJAPUR PARGANA DANKAUR GAUTAM BUDDH NAGAR, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address6th Floor, Office No-6, Kasana Tower, Alpha Road, Commercial Belt Alpha-1st , Greater Noida, Gauttam Buddha Nagar-201308
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    01/GPGBN/MAP/2024

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Sept 2024
Original completion20 Jun 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹23,250
Sanctioning authorityAny Other Competent Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ALI RAZA
License CA/2018/100994
147, SECOND FLOOR TAIMOOR NAGAR, NFC NEW DELHI-110025
Engineer
SANDEEP KUMAR SINGH
447/57 MILLAT NAGAR KDA NAUBASTA KANPUR
Contractor
STARKEY INFRATECH PRIVATE LIMITED
6TH FLOOR OFFICE NO-12 KASANA TOWER ALPHA-1 COMMERCIAL BELT GREATER NOIDA, GAUTAM BUDDHA NAGAR , UTTAR PRADESH-201308
Sr.Development work declared to RERA
1Demarcation of Plots
Site is located at KH- 113 M,MIRJAPUR PARGANA DANKAUR,GAUTAM BUDDH NAGAR, Demarcation of plot 66.26,30.4,30.4,65.58 metres ,site is located around 290 m from GYC Exit point on yamuna expressway having a distance of around 20Km from jewar international airport and around 12 km from yamuna river,also mostly commercial and resedential projects are being developed near by with argricultural lands are being seen in the area.Topography of the land is mainly flat land
2Boundary Wall
6m high Boundary wall is provided all around the four coners of the site with rcc block work structurally design with plint beam and columns at every 5metres so as to bear the load of the side movement and structurally self sustaining, with a width of 200mm with foudation plitn beams and beam on the top,lights are provided on the boundary wall top.
3Road Work
5m wide road connection to the basement ramps and with the entry exits is provided in front of the building to provide ease of acess,Road works is done with the hardpaving material or concrete with proper sub base road is properly connected to the main entry and exit ramps from the basement as well as it is being designed with tactile breaks and barrier free design of easy acess to the blind and handicapped persons.
4Footpaths
1.5 m wide Footpath is provided for Pedesterian wherever required on the side of road in entry exit locations.as this location will have a high load of foot movement special attention is given to footpaths with lighting and paving materials also,barrier free design is provided for the movement of handicapped with connection of ramps and tactile details are also added to the pedesterian footpaths for movement of blind and handicap,sustainable material is being proposed on the footpath.
5Water Supply Including Drinking Water Facilities
The project being a mixed use development ,the water requirement is for commercial office space and domestic which Total water requiremnet is around 37500 Litres per day which will be stored in undergrond domestic tanks provided on the site and filled with boring and municipal water connection provided on the site, Drinking water supply is provided afte filterization of water through domestic water supply on the site which is centrally with Toilet in office and shops spaces, and In studio with Borewell on site currently and future connectio if provided by any municipal supply.
6Sewer System
80 percent of the total water capacity is converted into sewage which is being considered as 30KLD STP is provided which is connected to the sewer system provided on site so that site can became zero discharge to the municipal line treated water is than re utilized for flushing cleaning and Landscaping.which is connected with the different tanks provided on site. A proper system form the toilets with a re use supply line is connected to each toilets for use of the flusing water again and creating less discharge and waste water
7Drain
Proper drainage system with sewage system line and surface water line with rain water harvesting system is provided on site with manhole chambers and perfoorated collection chamber for rain water harvseting which is connected rainwater harvesting system are provided on the site for the conservation of water on site and recahrge of the ground water the drainage line of the sewage system is connected to STP through which water is then treated and re utilized.
8Parks
Incorporating parks or open space into commercial and mixed use development is Open area is provided as it is a mixed use building no parks are provided on site only open areas are provided for recreation purposes
9Tree Planting
Trees and Plantation on a commercial and mixed use site can significantly enhance the enviornment offering both practical and aesthetics benefits,Integrating greenery into a commercial area improves air quality,reduces urban heat and improves overall air quality of the surroundung and make it pleasent,Native trees that are well adapted are planted on site so they can bear the climatic conditions of the area,As currently there is no existing trees on site we are trying to plant Evergreen trees other flowering plant on the site to make it more enjoyable and pleasant for visitors.
10Design For Electric Supply Including Street Lighting
Led solar based street lighting is used in the proect with sensor to operate in evening time to conserve ennergy ,also renewable enrgy is used in the project as solar cells are installed at the roof of the project which is directly connected to the grid to conserve the energy use in the project,Electric supply design are done considering effectiove energy saving techniques with all day and night backup for the users.
11Community Buildings
No community buildings are provided on the site as it is a mixed use development with commercial offices and suites,so there are no community building on site except from that recreation spaces are provided.
12Treatment and Disposal System of Sewage and Sullage water
30 KLD STP is povided on site for treatment of the sewage water which is around 80 percent of the required per day capacity of 37500 Litres of water for various purposes,the treated water is then reused for flusing,landscaping,cleaning and other purposes so as to create a zero discharge and water conservation strategy,sewage is convrted to bio which is then used in landscaping area for trees etc
13Solid Waste Management And Disposal System
Solid waste generated will be will be segregated at its point of generation in the different color bins on the basis of its biodegradibility at a single disposable point,the collection and disposal of the solid waste from the project is done in such a way that it will be scientifically dispose no causing any eysore or adverse effect to the surroundings.
14Water Conservation System
Rain water harvesting system with proper rainwater hharvestin pit are provided on site, water savings fixture are provided in the building treated water from Stp is to e used for flushing,gardening and landscaping purpose in the building,to conserve water and waste as less water as possible.
15Energy Management System Including Use of Renewable Energy
Less energy consuming fixtures are provided with led bulbs and VRF system for centralized hvac system,also rooftop solar system is to be installed as to generate renewable energy for the site,cool shading devices and double glaze windows solar reflective coating are provided to reduce energy demand in the building,
16Fire Protection And Fire Safety System
Fire protection system are provided as per National building code and provisional fire noc has been taken from the department,underground water tank of 2 lac litre will be provided for supplying water to fire hydrant service line all around the site which is being used by fire tender dure fire emergency situation,fire yard hydrant are provided on site with setbacks for fire tender also each floor has fire extinguishers placed at required distance and fire hose reel and fire staircase with complete ventilation.Balcony are provided in room for refuge area.5M wide entry exits are provided for easy acess of the fire tender into the site.
17Social Infrastructure And Other Public Amenities Including Public Health Services
no social infrastructure
18Emergency Evacuation Services
Holistic Emergency services are provided on the site to cater the need of any Emergency evacuation situation proper managemnet system with evacuation plan will be pinned on each floor showing the exit routes to the users also the fire exit door are properly demarcated with red color and fire staircases are provided with full ventialted from both the sides as per fire norms and also with fire hose reel and fire extinguishers also fire alarm system are provided on the site and detectors are also placed on the site for detecting any hazardous situation.
19Other Miscellaneous Work
Sewage treatment plant of of 30KLD is proposed on the site for the treatment of the grey water which can be reused in toilets and washrooms,sump is being proposed in the basement for the removal of acess rainwater which connected to draing line.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 20 Jun 2027.

Sanctioned by Any Other Competent Authority · 2,006 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
01/GPGBN/MAP/202422 Jun 202420 Jun 202720 Jun 202920 Jun 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

29 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
113M2006Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 20716
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Sept 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Aug 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Sept 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 Sept 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New19 Sept 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New19 Sept 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New10 Aug 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Aug 2024 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q1.

QuarterConstructionCertificates
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q215%CA ↗ · Arch ↗ · Eng ↗
2025-Q320%CA ↗ · Arch ↗ · Eng ↗
2025-Q423%CA ↗ · Arch ↗ · Eng ↗
2026-Q123%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUNIWEST INFRATECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM302713
PANAABCU3904D
CIN / TANMRTU01486C
Name of chairmanSANJEET SINGH
Registered address6th Floor, Office No-6, Kasana Tower, Alpha Road, Commercial Belt Alpha-1st , Greater Noida, Gauttam Buddha Nagar-201308
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UNIWEST INFRATECH PRIVATE LIMITED COLLECTION ACCOUNT FOR UNIWEST HUBBankICICI BANK LIMITEDBranchICICI BANK SECTOR 45 NOIDABranch addressSHOP NO-7C, PLOT NO-GH-04B, PRATEEK STYLOME, SECTOR-45, DIST-GAUTTAM BUDDH NAGARBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007780Branch emailawantika.mahendra@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UNIWEST INFRATECH PRIVATE LIMITED RERA DESIGNATED ACCOUNT FOR UNIWEST HUBBankICICI BANK LIMITEDBranchICICI BANK LIMITED SECTOR-45Branch addressSHOP NO-7C, PLOT NO-GH-04B, PRATEEK STYLOME SECTOR-45, DIST-GAUTTAM BUDDH NAGARBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007780
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UNIWEST INFRATECH PRIVATE LIMITED CURRENT ACCOUNT FOR UNIWEST HUBBankICICI BANK LIMITEDBranchICICI BANK LIMITED SECTOR-45Branch addressSHOP NO-7C, PLOT NO-GH-04B, PRATEEK STYLOME SECTOR-45 DIST-GAUTTAM BUDDH NAGARBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007780
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about UNIWEST HUB

Is UNIWEST HUB RERA registered?

Yes. UNIWEST HUB is registered with UPRERA under registration number UPRERAPRJ872184, registered on 26 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for UNIWEST HUB?

The completion date filed with UPRERA is 20 Jun 2027. No completion certificate is on record yet.

Who is the builder of UNIWEST HUB?

UNIWEST INFRATECH PRIVATE LIMITED is the promoter entity that filed UNIWEST HUB with UPRERA (promoter RERA ID UPRERAPRM302713). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does UNIWEST HUB have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UNIWEST HUB located?

UNIWEST HUB is registered in KH 113M MIRJAPUR PARGANA DANKAUR GAUTAM BUDDH NAGAR, Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗