YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)

UPRERARegistered

YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) is a RERA-registered residential project by The Innovators Digital Ads Pvt. Ltd in Prayagraj (RERA ID UPRERAPRJ109037). Registered with a completion deadline of 30 Jun 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ109037
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start4 Jul 2019
Project duration48 months
AddressAllahabad **, Prayagraj
TehsilAllahabad **
Applicant typeCompany
Applicant address93, Katghar road, Allahabad U.P.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NO218/PRAAA.(T.S.)/ZONE-2/PMAY2017-2018DATE-29JUNE2019

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. 2 completion certificates filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Oct 2019
Original completion3 Jul 2021
Revised completion30 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary11 May 2026
Registration fee₹40,500
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors288 · 1 · 8 (units from plan)
ConfigurationUnitsCarpet area
1 BHK28823
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
YAMUNA ENCLAVE (PMAY) · 1 BHK828823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Deepak Mehta and Associates
License COA/87/10840
Second Floor ,Plot No.16 Abhishek plaza ,Local shopping centre ,Mayur Vihar phase 2 Delhi 110091 India
Engineer
Tajuddin Ashraf
1st Floor H-53 Opposite Vijya Bank Sector -63 Noida U.P
Contractor
Rudra Shakti Infra Structure Pvt. Ltd.
647 B/I-193, Jankipuram Garden Lucknow, UP-226021.
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcated On Site of Project
2Boundary Wall
Gate Surrounded by Brick Wall as marked on seat No -11
3Road Work
Flexible Road Work is going on . As Marked on seat no -11 (Circulation plan with Road Section) .
4Footpaths
Soling /Paver Block Footpaths Work is going on ...as per site plan As Marked on seat no -11 (Circulation plan with Road Section) . Uploaded on Site
5Water Supply Including Drinking Water Facilities
Water Supply Shown on Services Coordination Plan Legend Serial No-6 Yellow Doted Line and Having UGT Tank Area 66.64 Sq.Mtr Provision of UG Tank and Pump House for Domestic Water 90KLD and Shown on Development Plan Seat No S-12 . .
6Sewer System
Sewer System Shown on Services Coordination Plan Having Capacity 180KLD /Area 70 Sq.Mtr Marked on Development Map Seat No. S-12.
7Drain
Sewer pipe Shown on Services Coordination Plan Legend Serials No-04 Blue Doted Line With Red Square Box Show On Development Plan Seat No. S-12
8Parks
Parks Covered with Grass Indication Area 1169.573 Sq .mtr Details given in Drawing Sheet No.04 Landscape Plan/ Development plan Seat No. S-12.
9Tree Planting
Tree Plantation is alos Shown Around Primes at joining of Boundary Wall Area With Grass Indication. Shown on Development plan Seat No. S-12.
10Design For Electric Supply Including Street Lighting
Electric Supply shown in Services Coordination plan Through 11 KV VCB Panel Room (Area 11.573 Sq.mtr) and 11 KV HT Meter Room (Area 11.73 Sq.Mtr) Marked on Development Drawing (Seat no. S-12) and Govt Electricity Provided by Power Corporation, Solar Panel Provided On the top roof of the building by the Company , Genset installed for 24 hour electric Supply, Maintanice of all these System will be maintain by SWC.
11Community Buildings
Community Buildings are provided in our Layout Plan of Solitaire valley project that is a part of the this project .
12Treatment and Disposal System of Sewage and Sullage water
Treatment and Disposal System of Sewage and Sullage Water are marked on Services Coordination plan Having STP Capacity 180KLD /Area 70 Sq.Mtr Marked on Development map Seat No. S-12
13Solid Waste Management And Disposal System
Garbage Collection Center marked on Services Coordination Plan on seat No- 12
14Water Conservation System
Water Conservation Through Rain Water Harvesting Pit marked on Services Coordination Plan .Legend Serials No-04. Shown on Development Plan Seat No. S-12.
15Energy Management System Including Use of Renewable Energy
Govt Electricity Provided by Power Corporation, Solar Panel Provided On the top roof of the building by the Company , Genset also installed for 24 hour electric Supply, Maintenance of all these System will be maintain by SWC.
16Fire Protection And Fire Safety System
As per Direction of Fire and Safety Security Certificate is given by Chief Fire Officer Dated-18-01-2019 Throw providing Fire Service Inlet , Automatic Electric Fire Alarm System, Terrace tank 25 thousand Capacity, Terrace pump 900 LPM Capacity, FIRE Extinguisher of I.S.I. mark 2190 on Each Floor of the Building Exit Sinage and PA system.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Health Club , Golf Club, Basket ball court and cycling track will be provided .
18Emergency Evacuation Services
Provisions Provided in Layout
19Other Miscellaneous Work
The Expansion of other Residential Unit , School for Children , Children Play Ground , Musical Fountain and Music System provided 3 tier Security Etc.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ALMIGHTY INFRAESTATE PVT LTDUPRERAAGT10163
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2023.

Sanctioned by Allahabad Development Authority · 7,040 sqm of land · an approved plan of 1 block and 288 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NO218/PRAAA.(T.S.)/ZONE-2/PMAY2017-2018DATE-29JUNE201929 Jun 201930 Jun 202330 Jun 20233 Jul 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Jun 2023.

#Granted fromExtended uptoNote
13 Jul 20212 Jan 2022Six months extension in view of force majeure caused by covid-19 pandemic
22 Jan 20221 Jan 2023—
31 Jan 202330 Jun 2023—

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
82 83 85 867040Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 1/336-363/464-2479
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New3 Oct 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Sept 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Sept 2019 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New3 Oct 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 Oct 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 Oct 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New1 Oct 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New1 Oct 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New1 Oct 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Oct 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 Oct 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Oct 2019 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameThe Innovators Digital Ads Pvt. Ltd
RolePromoter · current
RERA IDUPRERAPRM2380
PANAACCT2262N
CIN / TANU70102UP2005PTC029615
Name of chairmanMr. Mayank Jaiswal
Registered address93, Katghar road, Allahabad U.P.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
The Innovators Digital Ads Pvt.Ltd.Yamuna EnclaveBankVijaya bankBranchV.N.MARGA/C no.IFSCVIB0007102
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)

Is YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) RERA registered?

Yes. YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) is registered with UPRERA under registration number UPRERAPRJ109037, registered on 12 Oct 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) been completed?

UPRERA still lists YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) as Registered, so it is not shown as completed here. A completion certificate dated 11 May 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)?

The Innovators Digital Ads Pvt. Ltd is the promoter entity that filed YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) with UPRERA (promoter RERA ID UPRERAPRM2380). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) more time to complete?

UPRERA's record carries 3 completion extensions for YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT), the latest running to 30 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) located?

YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT) is registered in Prayagraj, as filed with UPRERA.

What configurations are available in YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)?

The approved unit plan describes 1 block and 288 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is YAMUNA ENCLAVE (PMAY IN SOLITAIRE VALLEY LAYOUT)?

About 166 units per acre: 288 planned units across 1.74 acres (7,040 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗