A72 type finished 32nos house at spinning mill awa is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Etawah (RERA ID UPRERAPRJ9615). Registered with a completion deadline of 30 Sept 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9615 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Oct 2017 |
| Original start | 1 Aug 2017 |
| Project duration | 36 months |
| Address | Etawah, Etawah |
| Tehsil | Etawah |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
/HC/30/04/15/S-01/72
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Aug 2017 |
| Original completion | 1 Apr 2020 |
| Revised completion | 30 Sept 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 11 Aug 2021 |
| Registration fee | ₹17,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots DONE |
| 2 | Boundary Wall NOT APPLICABLE |
| 3 | Road Work BITUMINOUS CARPATING REMAINING |
| 4 | Footpaths REMAINING |
| 5 | Water Supply Including Drinking Water Facilities 400 KL OHT WITH SUPPLY LINE LAID |
| 6 | Sewer System LAID |
| 7 | Drain REMAINING |
| 8 | Parks UNDER CONSTRUCTION |
| 9 | Tree Planting 98 TREES ALREADY EXISTING, 500 PLANTS ARE YET TO BE PLANTED |
| 10 | Design For Electric Supply Including Street Lighting 33/11 KVA ELECTRIC SUBSTATION AND STREET LIGHT DESIGN COMPLETE |
| 11 | Community Buildings COMMUNITY CENTRE PROPOSED |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP PROPOSED |
| 13 | Solid Waste Management And Disposal System TO BE DONE BY NAGAR PALIKA PARISHAD ETAWAH |
| 14 | Water Conservation System WILL BE DONE BY ALLOTTES AS PER REQUIRMENT |
| 15 | Energy Management System Including Use of Renewable Energy WILL BE DONE BY ALLOTTES AS PER REQUIRMENT |
| 16 | Fire Protection And Fire Safety System FIRE HYDRENT PROVIDED |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PRIMARY SCHOOL EXISTING,JUNIOR HIGH SCHOOL,INTER COLLEGE, NURSERY SCHOOL, NURSING HOME, SHOPPING CENTRE, SECTOR SHOPPING AREA |
| 18 | Emergency Evacuation Services 24.00 M, 18.00M AND 9.00M WIDE ROAD PROVIDED |
| 19 | Other Miscellaneous Work 12 NOS PARKS |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Apr 2020.
Sanctioned by U.P. Awas Evam Vikas Parishad · 2,304 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| /HC/30/04/15/S-01/72 | 30 Apr 2015 | 30 Apr 2020 | 30 Apr 2023 | 1 Apr 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Sept 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Apr 2020 | 30 Sept 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 344 | 3680 | — |
| 344 | 3680 | Khasra |
| 351 | 2060 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 Jul 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 1735/8-2-14-3HB(292)/13 | 23 Jul 2014 | other | — |
| Khatauni extract · 1421 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | 400 kl OHT ,tube well |
| Fire safety (as filed with RERA) | FIRE HYDRANT |
| Health service | NURSING HOME PURPOSED |
| Renewable energy | NO |
| Other facilities | 33/11 KVA substation |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Etawah
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | EE CU ETAWAHBankcanara bankBranchCANARA BANK ETAWAHA/C no.IFSCCNRB0002788 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about A72 type finished 32nos house at spinning mill awa
Is A72 type finished 32nos house at spinning mill awa RERA registered?
Yes. A72 type finished 32nos house at spinning mill awa is registered with UPRERA under registration number UPRERAPRJ9615, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has A72 type finished 32nos house at spinning mill awa been completed?
UPRERA still lists A72 type finished 32nos house at spinning mill awa as Registered, so it is not shown as completed here. A completion certificate dated 11 Aug 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of A72 type finished 32nos house at spinning mill awa?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed A72 type finished 32nos house at spinning mill awa with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted A72 type finished 32nos house at spinning mill awa more time to complete?
UPRERA's record carries 1 completion extension for A72 type finished 32nos house at spinning mill awa, the latest running to 30 Sept 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does A72 type finished 32nos house at spinning mill awa have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is A72 type finished 32nos house at spinning mill awa located?
A72 type finished 32nos house at spinning mill awa is registered in Etawah, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗