Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah

UPRERARegistered

Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Etawah (RERA ID UPRERAPRJ362532). Registered with a completion deadline of 31 Mar 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2023
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'21
100%Q3'21
100%Q4'21
100%Q1'22
100%Q2'22
100%Q3'22
100%Q4'22
100%Q1'23

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ362532
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start30 Sept 2020
Project duration31 months
AddressEtawah, Etawah
TehsilEtawah
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    16/VA.NI.-7/PMAY-ETW-01/03

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Jul 2020
Original completion31 Mar 2023
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary20 May 2025
Registration fee₹5,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors48 · 1 · 4 (units from plan)
ConfigurationUnitsCarpet area
OTHER4823
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B4 · OTHER44823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Deo Arya
License CA/97/22345
Archietecture and Planning Unit-7 U.P. Housing and Development Board
Engineer
Dr. Pradeep Kumar
Department of Civil Engineering H,B. Technical University Kanpur-208002
Contractor
Pradeep Kumar Executive Engineer U.P. Housing and Development Board
Construction Unit Etawah
Sr.Development work declared to RERA
1Demarcation of Plots
The Plot is clearly demarcated in Spining Mill Awasiya Yojna Etawah. As per the sanctioned layout the plot is situated facing 18.00 m wide road in layout. Apart from 18.00 m wide road 5.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot.
2Boundary Wall
Boundary wall is not included in the proposed projected. It will be constructed seprate project.
3Road Work
Road work for the whole scheme is completed. In the proposed project of 48 Nos. of houses 5.00 meter wide road 48.00 meter in length 6.00 meter wide road 74.00 meter length which is shown in layout is to be constructed as seperate project.
4Footpaths
Footpaths are not proposed in the sanctioned layout plan of the project.
5Water Supply Including Drinking Water Facilities
Over head tank and Water supply distribution system is already laid for the whole scheme. Only connection with main line is required for this project which will be done at completion stage as seperate project.
6Sewer System
Main Sever Line of whole scheme had been completed. Only connection with main sewer line is required for this project which will be done at completion stage as seperate project.
7Drain
Drainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain approx 74.00 meter length to be constructed as seperate project.
8Parks
Construction of boundary wall/RCC grill of the proposed park in the scheme is already completed. For the particular project as per layout park is loacted at with in the vicinity of hardly 80.00 m from the proposed project.
9Tree Planting
Tree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 48 Nos. of houses plantation on 5.00 m and 6.00 m wide road will be done after drain and road work.
10Design For Electric Supply Including Street Lighting
Electric supply including street lighting is not included in the proposed projected. It will be constructed seprate project.
11Community Buildings
Community building is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
12Treatment and Disposal System of Sewage and Sullage water
Treatment and disposal system of sewage and sullage water is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
13Solid Waste Management And Disposal System
Solid waste management and disposal system is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
14Water Conservation System
In the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project.
15Energy Management System Including Use of Renewable Energy
In the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR.
16Fire Protection And Fire Safety System
In the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Public Amenities such as schools, hospitals etc are available in nearby vicinity
18Emergency Evacuation Services
Sufficient No of staircases is being proposed in the building
19Other Miscellaneous Work
Ample amount of open areas park etc are available in the Spining Mill Awasiya Yojna Etawah
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 23 Jan 2023.

Sanctioned by U.P. Awas Evam Vikas Parishad · 500 sqm of land · an approved plan of 1 block and 48 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
16/VA.NI.-7/PMAY-ETW-01/0324 Jan 201823 Jan 202323 Jan 202631 Mar 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
354, 36611250Khasra
GH-44302Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1424
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · G.M. camp/Kanpur
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Jun 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Jun 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Jun 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Jun 2020 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New16 Jun 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Jun 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jun 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Jun 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Jun 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Jul 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 Jun 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 Jun 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Jun 2020 ↗

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2022-Q4.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2100%CA ↗ · Arch ↗ · Eng ↗
2021-Q3100%CA ↗ · Arch ↗ · Eng ↗
2021-Q4100%CA ↗ · Arch ↗ · Eng ↗
2022-Q1100%CA ↗ · Arch ↗ · Eng ↗
2022-Q2100%CA ↗ · Arch ↗ · Eng ↗
2022-Q3100%CA ↗ · Arch ↗ · Eng ↗
2022-Q4100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2022-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Etawah

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
EX ENG CONST UNIT UP AWAS EVAM VIKAS PARISHAD ETAWAHBankHDFC BANKBranchETAWHA/C no.IFSCHDFC0009596
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah

Is Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah RERA registered?

Yes. Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah is registered with UPRERA under registration number UPRERAPRJ362532, registered on 14 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah been completed?

UPRERA still lists Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah as Registered, so it is not shown as completed here. A completion certificate dated 20 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah located?

Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah is registered in Etawah, as filed with UPRERA.

What configurations are available in Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah?

The approved unit plan describes 1 block and 48 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah?

About 388 units per acre: 48 planned units across 0.12 acres (500 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗