Abhyudaya Celestial

UPRERARegistered

Abhyudaya Celestial is a RERA-registered residential project by Abhyudaya Housing & Constructions Pvt. Ltd in Baghamau Lucknow, Lucknow (RERA ID UPRERAPRJ414462). Registered with a completion deadline of 29 Apr 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'25
2.39%Q3'25
3.77%Q4'25
11%Q1'26
13%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ414462
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start30 Apr 2025
Project duration60 months
AddressGroup Housing No. 18 Part of Khasra No. 130 and 164, Shalimar Oneworld, Vill-Baghamau, Distt-Lucknow., Baghamau Lucknow, Lucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address1st Floor, 1/6, Gokhale Marg, Gokhley Marg, Lucknow, Uttar Pradesh, India, 226001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    LDA/BP/24-25/0597/27032025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Jun 2025
Original completion29 Apr 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹28,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors121 · 1 · 30 (units from plan)
Homes · commercial units118 · 3 (shops and offices filed in the same plan)
  • 3 BHK113 93%
  • 2 BHK4 3%
  • SHOP3 2%
  • OTHER1 1%
ConfigurationUnitsCarpet area
3 BHK113103-133
OTHER1344
SHOP323-36
2 BHK4100
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
AA · 3 BHK, OTHER, SHOP, 2 BHK3012123-133
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mrs. Vandana Srisvastava
License CA/95/18946
13/262-A Indira Nagar, Lucknow- 226016
Engineer
Mr. Pankish Goel, C/o TPC Technical Projects consultants pvt. Ltd.
B-74, Sector-57,opposite Park Plaza Noida-201301
Contractor
Harshita Buildcon
A-22, Delta-IGreater Noida Gautam Budh Nagar Uttar Pradesh201308
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved sanction plan this is a single rectangular plot. The plot features having one entry gate and one exit gate, both accessible from the 30-meter wide frontage on the southwest side. The site is surrounded by adjacent plots on the northwest and southwest sides, while a green park area borders the southeast boundary.
2Boundary Wall
The perimeter of the site will feature a boundary wall designed in accordance with approved specifications. The wall will be constructed to a height of 1.8 to 2.1 meters and a thickness of 200 millimeters and reinforced concrete (RCC) columns and beams, as detailed in the approved design. Additionally, entrance and exit gates will be fabricated from MS steel, adhering to the approved design, and integrated into the boundary wall to ensure a cohesive and secure site enclosure.
3Road Work
The internal roads within the site will be constructed using Trimix/Asphalt, as specified in the design provided by the Architect, ensuring a durable and well-designed transportation network.
4Footpaths
All internal roads will feature narrow footpaths with tile pavers or equivalent finishes, as specified in the landscape design, providing a pedestrian-friendly and aesthetically pleasing environment
5Water Supply Including Drinking Water Facilities
All apartments will be provided with a dual water supply system, comprising domestic water for household activities and STP (Sewage Treatment Plant) treated water for flushing purposes. Additionally, groundwater can be utilized, and residents have the option to install individual RO (Reverse Osmosis) systems as needed. The STP treated water will also be utilized for irrigation purposes, promoting water conservation and efficient use of resources. To facilitate this system, underground and terrace-level water tanks will be constructed. Separate tanks will be designated for fire-fighting purposes, ensuring the safety and well-being of residents.
6Sewer System
A centralized sewerage system will be provided, directing all sewage water to the Sewage Treatment Plant (STP) for thorough treatment. Following treatment, the recycled water will be utilized for various non-potable purposes, including gardening, flushing tanks, and vehicle washing. To ensure sustainable water management, excess treated water from the STP will be safely discharged into the municipal sewerage system, minimizing environmental impact and promoting eco-friendly practices.
7Drain
A comprehensive storm water management system will be implemented, ensuring efficient collection and disposal of rainwater. Storm water from roads and landscape areas will be directed into storm water drain channels, which will then flow into a rainwater harvesting pit. This pit will facilitate groundwater recharge, contributing to sustainable water conservation. Excess storm water will be safely discharged into the municipal drain line, preventing flooding and ensuring a well-managed storm water system.
8Parks
A spacious green area beside the building offers lush parks, childrens play areas, and recreational facilities, creating a peaceful retreat for residents to unwind and connect
9Tree Planting
The project will feature a mix of ornamental, shady, and native tree species, as per the landscape design, to maintain a lush green environment and stunning natural vistas.
10Design For Electric Supply Including Street Lighting
The electrical system meets local regulations, featuring a centralized setup with transformer, LT panel, feeder pillar, and DG backup for critical services like external lighting and pump operations
11Community Buildings
"A fully air-conditioned Club House/Community Center is strategically located on the ground floor, serving as a vibrant hub for socialization and recreation. Key features include: Swimming pool with scenic central atrium, Cozy sitting areas for each building, State-of-the-art gym, Indoor playing areas for various sports and activities, The Club House offers a diverse range of facilities, catering to the leisure, fitness, and entertainment needs of residents, fostering a sense of community and well-being.
12Treatment and Disposal System of Sewage and Sullage water
Centralized sewerage system connects all flats to STP. Treated water is reused for gardening, flushing, and vehicle washing. Overflow is discharged into Municipal sewerage system, ensuring eco-friendly practices.
13Solid Waste Management And Disposal System
The project incorporates a waste management system that promotes eco-friendly practices and community responsibility. This includes apartment-level waste segregation, designated dustbins for recyclable and non-recyclable waste in common areas, and partnership with government-approved vendors for disposal.
14Water Conservation System
A rainwater harvesting system with multiple recharge pits will conserve water, reduce stormwater runoff, and replenish groundwater, promoting sustainability within the building complex
15Energy Management System Including Use of Renewable Energy
The building complex prioritizes energy efficiency, featuring LED and solar lighting, energy-efficient motors in STP and pump rooms, and 25% of the terrace dedicated to Solar Voltaic Panels for renewable energy in common areas. Additionally, timer control panels ensure optimized energy management, reducing our carbon footprint and promoting sustainability.
16Fire Protection And Fire Safety System
The building complex strictly adheres to National Building Code (NBC) regulations and Fire Department approvals, ensuring utmost fire safety. Key features include fire sprinkler systems, Fire Hydraulic Column (FHC) shaft, smoke detectors, and high-pressure pumps, providing comprehensive protection against fire hazards and prioritizing occupant safety.
17Social Infrastructure And Other Public Amenities Including Public Health Services
The project boasts a robust social infrastructure and public amenities, enhancing the quality of life for residents. A fully-equipped Club House/Community Center, swimming pool, gym, and indoor playing areas promote social interaction and recreation. Sustainable features include dedicated waste management and rainwater harvesting systems, while advanced fire safety measures compliant with NBC codes ensure utmost safety. Energy-efficient technologies and easy access to public health services, including nearby municipal sewerage connectivity and treated water reuse, foster a healthy and eco-friendly community. These thoughtfully designed amenities create a holistic living experience, blending comfort, convenience, and environmental responsibility.
18Emergency Evacuation Services
For enhanced safety, The building features a fire staircase, fire-resistant doors, and controlled basement access with a single entry/exit point. Designated assembly areas are also identified across the campus, providing clear gathering points in emergencies. Adequate signage is strategically placed to guide residents through evacuation routes and provide critical safety instructions, ensuring compliance with fire safety regulations and prioritizing resident well-being.
19Other Miscellaneous Work
Experience the ultimate in comfort and convenience at our Club House, where residents can unwind, socialize, and stay active. With a wide range of facilities and activities, this vibrant community hub promotes relaxation, recreation, and a sense of belonging.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

9 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1CITY1ONE REALTORS PRIVATE LIMITEDUPRERAAGT24285
2Diksha DubeyUPRERAAGT21713
3GLICKMAN REALTORS PRIVATE LIMITEDUPRERAAGT25027
4Home Bazaar Services Pvt LtdUPRERAAGT22169
5Navneet Kumar SrivastavaUPRERAAGT10019
6O.C. INFRAVENTURES AND CONSTRUCTION PVT LTDUPRERAAGT15084
7Shailendra Kumar SinghUPRERAAGT19422
8Shubham KesharwaniUPRERAAGT20206
9star estateUPRERAAGT10202
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Apr 2030.

Sanctioned by Lucknow Development Authority · 4,625 sqm of land · an approved plan of 1 block and 121 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
LDA/BP/24-25/0597/2703202530 Apr 202529 Apr 203029 Apr 203329 Apr 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
part of Khasara number 130 & 1644625Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 2923
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 9652
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 5396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 May 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Apr 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Apr 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 May 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Apr 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Apr 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 May 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Apr 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Apr 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New30 Apr 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Apr 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Apr 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New30 Apr 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.

QuarterConstructionCertificates
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q22.39%CA ↗ · Arch ↗ · Eng ↗
2025-Q33.77%CA ↗ · Arch ↗ · Eng ↗
2025-Q411%CA ↗ · Arch ↗ · Eng ↗
2026-Q113%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAbhyudaya Housing & Constructions Pvt. Ltd
RolePromoter · current
RERA IDUPRERAPRM316045
PANAADCA9526B
CIN / TANU45101UP1995PTC018566
Name of chairmanPulkit Agarwal
Registered address1st Floor, 1/6, Gokhale Marg, Gokhley Marg, Lucknow, Uttar Pradesh, India, 226001
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ABHYUDAYA H & C P LTD COLL A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknowA/C no.IFSCSBIN0004166Branch emailsbi.04166@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ABHYUDAYA H & C P LTD SEP A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ABHYUDAYA H & C P LTD TRANS A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Abhyudaya Celestial

Is Abhyudaya Celestial RERA registered?

Yes. Abhyudaya Celestial is registered with UPRERA under registration number UPRERAPRJ414462, registered on 17 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Abhyudaya Celestial?

The completion date filed with UPRERA is 29 Apr 2030. No completion certificate is on record yet.

Who is the builder of Abhyudaya Celestial?

Abhyudaya Housing & Constructions Pvt. Ltd is the promoter entity that filed Abhyudaya Celestial with UPRERA (promoter RERA ID UPRERAPRM316045). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Abhyudaya Celestial have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Abhyudaya Celestial located?

Abhyudaya Celestial is registered in Baghamau Lucknow, Lucknow, as filed with UPRERA.

What configurations are available in Abhyudaya Celestial?

The unit plan filed with UPRERA lists 3 BHK, OTHER, SHOP and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Abhyudaya Celestial?

The approved unit plan filed with UPRERA runs from 23 to 344 m² of carpet area (about 245 to 3,701 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Abhyudaya Celestial?

The approved unit plan describes 1 block and 121 units of which 118 are homes and 3 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Abhyudaya Celestial?

About 106 units per acre: 121 planned units across 1.14 acres (4,625 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.