Abhyudaya Celestial is a RERA-registered residential project by Abhyudaya Housing & Constructions Pvt. Ltd in Baghamau Lucknow, Lucknow (RERA ID UPRERAPRJ414462). Registered with a completion deadline of 29 Apr 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ414462 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 30 Apr 2025 |
| Project duration | 60 months |
| Address | Group Housing No. 18 Part of Khasra No. 130 and 164, Shalimar Oneworld, Vill-Baghamau, Distt-Lucknow., Baghamau Lucknow, Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | 1st Floor, 1/6, Gokhale Marg, Gokhley Marg, Lucknow, Uttar Pradesh, India, 226001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
LDA/BP/24-25/0597/27032025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Jun 2025 |
| Original completion | 29 Apr 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹28,500 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK113 93%
- 2 BHK4 3%
- SHOP3 2%
- OTHER1 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 113 | 103-133 |
| OTHER | 1 | 344 |
| SHOP | 3 | 23-36 |
| 2 BHK | 4 | 100 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| AA · 3 BHK, OTHER, SHOP, 2 BHK | 30 | 121 | 23-133 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved sanction plan this is a single rectangular plot. The plot features having one entry gate and one exit gate, both accessible from the 30-meter wide frontage on the southwest side. The site is surrounded by adjacent plots on the northwest and southwest sides, while a green park area borders the southeast boundary. |
| 2 | Boundary Wall The perimeter of the site will feature a boundary wall designed in accordance with approved specifications. The wall will be constructed to a height of 1.8 to 2.1 meters and a thickness of 200 millimeters and reinforced concrete (RCC) columns and beams, as detailed in the approved design. Additionally, entrance and exit gates will be fabricated from MS steel, adhering to the approved design, and integrated into the boundary wall to ensure a cohesive and secure site enclosure. |
| 3 | Road Work The internal roads within the site will be constructed using Trimix/Asphalt, as specified in the design provided by the Architect, ensuring a durable and well-designed transportation network. |
| 4 | Footpaths All internal roads will feature narrow footpaths with tile pavers or equivalent finishes, as specified in the landscape design, providing a pedestrian-friendly and aesthetically pleasing environment |
| 5 | Water Supply Including Drinking Water Facilities All apartments will be provided with a dual water supply system, comprising domestic water for household activities and STP (Sewage Treatment Plant) treated water for flushing purposes. Additionally, groundwater can be utilized, and residents have the option to install individual RO (Reverse Osmosis) systems as needed. The STP treated water will also be utilized for irrigation purposes, promoting water conservation and efficient use of resources. To facilitate this system, underground and terrace-level water tanks will be constructed. Separate tanks will be designated for fire-fighting purposes, ensuring the safety and well-being of residents. |
| 6 | Sewer System A centralized sewerage system will be provided, directing all sewage water to the Sewage Treatment Plant (STP) for thorough treatment. Following treatment, the recycled water will be utilized for various non-potable purposes, including gardening, flushing tanks, and vehicle washing. To ensure sustainable water management, excess treated water from the STP will be safely discharged into the municipal sewerage system, minimizing environmental impact and promoting eco-friendly practices. |
| 7 | Drain A comprehensive storm water management system will be implemented, ensuring efficient collection and disposal of rainwater. Storm water from roads and landscape areas will be directed into storm water drain channels, which will then flow into a rainwater harvesting pit. This pit will facilitate groundwater recharge, contributing to sustainable water conservation. Excess storm water will be safely discharged into the municipal drain line, preventing flooding and ensuring a well-managed storm water system. |
| 8 | Parks A spacious green area beside the building offers lush parks, childrens play areas, and recreational facilities, creating a peaceful retreat for residents to unwind and connect |
| 9 | Tree Planting The project will feature a mix of ornamental, shady, and native tree species, as per the landscape design, to maintain a lush green environment and stunning natural vistas. |
| 10 | Design For Electric Supply Including Street Lighting The electrical system meets local regulations, featuring a centralized setup with transformer, LT panel, feeder pillar, and DG backup for critical services like external lighting and pump operations |
| 11 | Community Buildings "A fully air-conditioned Club House/Community Center is strategically located on the ground floor, serving as a vibrant hub for socialization and recreation. Key features include: Swimming pool with scenic central atrium, Cozy sitting areas for each building, State-of-the-art gym, Indoor playing areas for various sports and activities, The Club House offers a diverse range of facilities, catering to the leisure, fitness, and entertainment needs of residents, fostering a sense of community and well-being. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized sewerage system connects all flats to STP. Treated water is reused for gardening, flushing, and vehicle washing. Overflow is discharged into Municipal sewerage system, ensuring eco-friendly practices. |
| 13 | Solid Waste Management And Disposal System The project incorporates a waste management system that promotes eco-friendly practices and community responsibility. This includes apartment-level waste segregation, designated dustbins for recyclable and non-recyclable waste in common areas, and partnership with government-approved vendors for disposal. |
| 14 | Water Conservation System A rainwater harvesting system with multiple recharge pits will conserve water, reduce stormwater runoff, and replenish groundwater, promoting sustainability within the building complex |
| 15 | Energy Management System Including Use of Renewable Energy The building complex prioritizes energy efficiency, featuring LED and solar lighting, energy-efficient motors in STP and pump rooms, and 25% of the terrace dedicated to Solar Voltaic Panels for renewable energy in common areas. Additionally, timer control panels ensure optimized energy management, reducing our carbon footprint and promoting sustainability. |
| 16 | Fire Protection And Fire Safety System The building complex strictly adheres to National Building Code (NBC) regulations and Fire Department approvals, ensuring utmost fire safety. Key features include fire sprinkler systems, Fire Hydraulic Column (FHC) shaft, smoke detectors, and high-pressure pumps, providing comprehensive protection against fire hazards and prioritizing occupant safety. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The project boasts a robust social infrastructure and public amenities, enhancing the quality of life for residents. A fully-equipped Club House/Community Center, swimming pool, gym, and indoor playing areas promote social interaction and recreation. Sustainable features include dedicated waste management and rainwater harvesting systems, while advanced fire safety measures compliant with NBC codes ensure utmost safety. Energy-efficient technologies and easy access to public health services, including nearby municipal sewerage connectivity and treated water reuse, foster a healthy and eco-friendly community. These thoughtfully designed amenities create a holistic living experience, blending comfort, convenience, and environmental responsibility. |
| 18 | Emergency Evacuation Services For enhanced safety, The building features a fire staircase, fire-resistant doors, and controlled basement access with a single entry/exit point. Designated assembly areas are also identified across the campus, providing clear gathering points in emergencies. Adequate signage is strategically placed to guide residents through evacuation routes and provide critical safety instructions, ensuring compliance with fire safety regulations and prioritizing resident well-being. |
| 19 | Other Miscellaneous Work Experience the ultimate in comfort and convenience at our Club House, where residents can unwind, socialize, and stay active. With a wide range of facilities and activities, this vibrant community hub promotes relaxation, recreation, and a sense of belonging. |
Registered agents
9 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | CITY1ONE REALTORS PRIVATE LIMITED | UPRERAAGT24285 |
| 2 | Diksha Dubey | UPRERAAGT21713 |
| 3 | GLICKMAN REALTORS PRIVATE LIMITED | UPRERAAGT25027 |
| 4 | Home Bazaar Services Pvt Ltd | UPRERAAGT22169 |
| 5 | Navneet Kumar Srivastava | UPRERAAGT10019 |
| 6 | O.C. INFRAVENTURES AND CONSTRUCTION PVT LTD | UPRERAAGT15084 |
| 7 | Shailendra Kumar Singh | UPRERAAGT19422 |
| 8 | Shubham Kesharwani | UPRERAAGT20206 |
| 9 | star estate | UPRERAAGT10202 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Apr 2030.
Sanctioned by Lucknow Development Authority · 4,625 sqm of land · an approved plan of 1 block and 121 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| LDA/BP/24-25/0597/27032025 | 30 Apr 2025 | 29 Apr 2030 | 29 Apr 2033 | 29 Apr 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| part of Khasara number 130 & 164 | 4625 | Khasra |
| Sale deed · 2923 The registered deed by which the promoter bought the land. | PDF ↗ |
| Lease deed · 9652 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 5396 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 May 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 30 Apr 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 30 Apr 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 May 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 30 Apr 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 30 Apr 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 May 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Apr 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 30 Apr 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 30 Apr 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 30 Apr 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 30 Apr 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 30 Apr 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 2.39% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 3.77% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 11% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 13% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Abhyudaya Housing & Constructions Pvt. Ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM316045 |
| PAN | AADCA9526B |
| CIN / TAN | U45101UP1995PTC018566 |
| Name of chairman | Pulkit Agarwal |
| Registered address | 1st Floor, 1/6, Gokhale Marg, Gokhley Marg, Lucknow, Uttar Pradesh, India, 226001 |
| RERA contact | |
| Registered since | 2024 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ABHYUDAYA H & C P LTD COLL A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknowA/C no.IFSCSBIN0004166Branch emailsbi.04166@sbi.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | ABHYUDAYA H & C P LTD SEP A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | ABHYUDAYA H & C P LTD TRANS A/C ABHYUDAYA CELESTIALBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6,A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Abhyudaya Celestial
Is Abhyudaya Celestial RERA registered?
Yes. Abhyudaya Celestial is registered with UPRERA under registration number UPRERAPRJ414462, registered on 17 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Abhyudaya Celestial?
The completion date filed with UPRERA is 29 Apr 2030. No completion certificate is on record yet.
Who is the builder of Abhyudaya Celestial?
Abhyudaya Housing & Constructions Pvt. Ltd is the promoter entity that filed Abhyudaya Celestial with UPRERA (promoter RERA ID UPRERAPRM316045). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Abhyudaya Celestial have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Abhyudaya Celestial located?
Abhyudaya Celestial is registered in Baghamau Lucknow, Lucknow, as filed with UPRERA.
What configurations are available in Abhyudaya Celestial?
The unit plan filed with UPRERA lists 3 BHK, OTHER, SHOP and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Abhyudaya Celestial?
The approved unit plan filed with UPRERA runs from 23 to 344 m² of carpet area (about 245 to 3,701 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Abhyudaya Celestial?
The approved unit plan describes 1 block and 121 units of which 118 are homes and 3 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Abhyudaya Celestial?
About 106 units per acre: 121 planned units across 1.14 acres (4,625 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗