Hridayam at Emaar Gomti Greens is a RERA-registered residential project by EMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited)) in Lucknow (RERA ID UPRERAPRJ517031). Registered with a completion deadline of 22 Dec 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ517031 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2021 |
| Project duration | 36 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | 306-308, Square One, C-2, District Centre, Saket, South Delhi, New Delhi, Delhi, India, 110017 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
38558
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 23 Feb 2021 |
| Original completion | 22 Dec 2023 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 18 Sept 2023 |
| Registration fee | ₹1,68,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots RCC Concrete Pillars of 100x100x600 mm on all the corners of the plots with marking of plot number for reference. |
| 2 | Boundary Wall Readymade compound wall with height of 7ft. Post size (9x6x6), Panel size (7x1x2) and foundation size (300mm. Dia x 600 mm depth) |
| 3 | Road Work 12 meter/9 meter wide access road of flexible pavement including GSB, WMM and bituminous course |
| 4 | Footpaths 100x200x60mm Brick type concrete paver blocks laid over 50 mm sand and 100mm GSB |
| 5 | Water Supply Including Drinking Water Facilities Underground HDPE water supply pipes laid on both side of the roads connected from 930 KLD and 250 KLD overhead tank and connected to each plot through 15mm dia PPR pipes. (Extension of Phase-1) |
| 6 | Sewer System Entire project is connected through underground PVC-U pipes for sewerage lines on either side of the road with SN 4 pipes and manhole are provided in front of plots for connection. |
| 7 | Drain RCC Drain pipes of class NP2 will be provided for the storm water discharge connectivity. |
| 8 | Parks As a part of Phase-1 development the proposed green area of approximately 90,000 sqm including kids play area, jogging track, nakshatra garden, rotary etc., will be considered for the same. |
| 9 | Tree Planting As a part of Phase-1 development, various types of trees such as Delonix regia, Foxtail palm etc. will be planted along road sides and green pockets. |
| 10 | Design For Electric Supply Including Street Lighting Electricity supply through 33/11 KV sub station. LED street lights are provided. (Extension of Phase-1) |
| 11 | Community Buildings As a part of Phase-1 development, the same club of approximately 3000 sqm of area including swimming pool, Gym, Banquet, Play area etc. will meet the requirement. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Through 1 no of conventional STP of having total capacity of 1150 KLD |
| 13 | Solid Waste Management And Disposal System Will be provided as per best possible way |
| 14 | Water Conservation System Artificial lakes in Phase-1 develoment will help in water conservation |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System As a part of Phase-1 development the same facilities as provided in Phase-1 will meet the requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As a part of Phase-1 development the same facilities as provided in Phase-1 will meet the requirement. |
| 18 | Emergency Evacuation Services will be provided as per best possible way |
| 19 | Other Miscellaneous Work NA |
Registered agents
3 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | PIXEL GLOBAL INFRA PRIVATE LIMITED | UPRERAAGT13936 |
| 2 | RANVEER PROPERTIES | UPRERAAGT10234 |
| 3 | Varun Properties Inc. | UPRERAAGT11985 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Dec 2023.
Sanctioned by Lucknow Development Authority · 32,582 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 38558 | 21 Oct 2020 | 22 Dec 2023 | 22 Dec 2027 | 22 Dec 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
30 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 263 | 2413 | Khasra |
| 264 | 5673.50 | Khasra |
| 265 | 702 | Khasra |
| 276 | 1000 | Khasra |
| 277 | 826 | Khasra |
| 278 | 756 | Khasra |
| 279 | 293 | Khasra |
| 280 | 530 | Khasra |
| 281 | 520 | Khasra |
| 282 | 520 | Khasra |
| 283 | 5889.50 | Khasra |
| 284 | 290 | Khasra |
| 288 | 1203 | Khasra |
| 289 | 3957.50 | Khasra |
| 290 | 5877.50 | Khasra |
| 291 | 1395 | Khasra |
| 293 | 735 | Khasra |
| Sale deed · 9981 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4874 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5623 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6207 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6819 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7656 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8252 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10028 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10321 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10398 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12451 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 18488 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · Consortium Agreement The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 11194 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 22 Dec 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Feb 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 12 Feb 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 12 Feb 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Dec 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Dec 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Dec 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Dec 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 14 Jan 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 19 Feb 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Jan 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 15 Jan 2021 ↗ |
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | EMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited)) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM6473 |
| PAN | AABCE4308B |
| CIN / TAN | U45201DL2005PLC133161 |
| Name of chairman | Mr. Majed Khalfan Bin Theniyah |
| Registered address | 306-308, Square One, C-2, District Centre, Saket, South Delhi, New Delhi, Delhi, India, 110017 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ADZE PROPERTIES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Emaar Business Park, MG Road, Sikanderpur, sector-28 Gurugram |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Emaar India Ltd.BankYES BankBranchGomti Nagar LucknowA/C no.IFSCYESB0000611 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Hridayam at Emaar Gomti Greens
Is Hridayam at Emaar Gomti Greens RERA registered?
Yes. Hridayam at Emaar Gomti Greens is registered with UPRERA under registration number UPRERAPRJ517031, registered on 23 Feb 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Hridayam at Emaar Gomti Greens been completed?
UPRERA still lists Hridayam at Emaar Gomti Greens as Registered, so it is not shown as completed here. A completion certificate dated 18 Sept 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Hridayam at Emaar Gomti Greens?
EMAAR INDIA LIMITED (Formerly known as Emaar MGF Land Limited)) is the promoter entity that filed Hridayam at Emaar Gomti Greens with UPRERA (promoter RERA ID UPRERAPRM6473). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Hridayam at Emaar Gomti Greens have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Hridayam at Emaar Gomti Greens located?
Hridayam at Emaar Gomti Greens is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗