ACE 153

UPRERARegistered

ACE 153 is a RERA-registered commercial project by JAM VISION TECH PRIVATE LIMITED in Uttar Pradesh (RERA ID UPRERAPRJ423807). Registered with a completion deadline of 30 Apr 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
—Q2'25
36.91%Q3'25
57%Q4'25
70%Q1'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ423807
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start20 May 2023
Project duration48 months
Addressundefined
Tehsilundefined
Applicant typeCompany
Applicant addressACE STUDIO, 7TH FLOOR, PLOT NO. 01/B , SECTOR-126 , NOIDA ,GAURAM BUDH NAGAR, UTTAR PRADESH -201303
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2023/01/12/8266

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Jun 2023
Original completion30 Apr 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,10,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors737 · 5 · 25 (units from plan)
ConfigurationUnitsCarpet area
OTHER73710-268
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block A · OTHER63610-68
Block B · OTHER63523-68
Block C · OTHER66810-69
Tower 1 · OTHER2535126-210
Tower 2 · OTHER2424713-102
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ravi Kumar Garg ACPL Design Ltd
License CA/2013/58473
E-24 South Ex -1, E Block, New Delhi, 110049
Engineer
Pankish Goel
B-74, Sector 57, NOIDA 201301
Contractor
Mobarak Ali
Village Airanjongla, Part-1, P.O. A.M Road P.Ss Dhubri, Dist Dhubri, Assam -783323
Sr.Development work declared to RERA
1Demarcation of Plots
The plot having 20,000 Sm of area will be demarcated as per the sanction and survey drawing. The demarcation will be done properly and carefully.
2Boundary Wall
A boundary wall of (approx 570 m running length) RCC/brick with plaster and railing will be prepared. This boundary will be strong and sturdy and will help in demarcation of the plot.
3Road Work
7.5 M wide Access road to all towers will be provided and the road will be designed to take up live load as per approvals and NBC
4Footpaths
Designed footpath for walking and going from one point to another. Use of cobbles, stones, concrete and other materials will be done so that its inviting for people to walk upon.
5Water Supply Including Drinking Water Facilities
NOIDA authority shall supply water for the entire complex and it shall be treated and supplied . 2 Raw water tank 31 KL and 41 KL, 2 domestic tank 29 KL and 45 KL will be constructed.
6Sewer System
Centralised STP to treat the sewage will be designed and provided. The STP capacity proposed is 260 KLD as per the EC approval.
7Drain
Rain water drains will be provided as per design . The drains will be designed such hat they will carry all the rain water through a proper network and will take to the ring line running along the boundary wall and ultimately discharging in the RWH pits. The slopes and levels will be maintained and designed to avoid water logging and flooding.
8Parks
Beautiful park will be designed for all the users to enjoy and relax. Many seating plaza, outdoor sitting spaces, water bodies will be made for mental relaxation of the working population.
9Tree Planting
As per approved building plan, APT NO OF TREES WILL BE PROVIDED. The trees will be a mix of ornamental and foliage trees, mix of flowering and evergreen trees and also the area will be covered by hedges, flower beds and grass covers to give cooling effect to the whole campus.
10Design For Electric Supply Including Street Lighting
Power supply from NOIDA electricity board will be taken and distributed with proper metering system. Dual metering will be done for the mains and the DG supply. The street lighting as per approved building plan and best suited to the pathways and driveways will be done so that the areas remain well lit during the evening operating hours.
11Community Buildings
Social gathering spaces are being provided in the plaza. Beautiful pathways, benches, seating spaces and shaded areas will be provided for all the relax and enjoy.
12Treatment and Disposal System of Sewage and Sullage water
Centralised STP to treat the sewage. STP of the capacity Approx 260 KLD will be installed to treat the Sewage.
13Solid Waste Management And Disposal System
Collection, segregation, storage and disposal as per norms and the NBC will be done. Proper housekeeping staff will be deployed for the same and coloured bins will be placed across the complex to collect the waste in segregated form .
14Water Conservation System
RAIN water harvesting system is being provided to conserve the water and dual flush system will also be provided. 5 Numbers of RWH pits are being provided in the complex.
15Energy Management System Including Use of Renewable Energy
Usage of LED lights will be done so that electricity should be conserved.
16Fire Protection And Fire Safety System
As per approved building plan, fire protection system consisting of sprinklers, smoke detectors and fire alarm. 2 numbers of fire tank of 315 KL each
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering spaces in plaza will be provided so that users can come out and sit for relaxation and social gathering purposes. PHE services can be operated in the spaces allocated for the same for the well being of the office people.
18Emergency Evacuation Services
Firer staircase will be provided a per the building approvals and as perNBC. (1.5 M wide fire staircase)
19Other Miscellaneous Work
As per approved building plan. We are going to make 2-3 water bodies in the complex so that the area remain cool and comfortable.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

15 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2Amit kumar kaushikUPRERAAGT18627
3BLUECRUMBS INFRA PRIVATE LIMITEDUPRERAAGT16897
4BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
5CAPITALBOON CONSULTINGUPRERAAGT18663
6Fareed AhmadUPRERAAGT20469
7HAPPY HOMES REALTORS AND BUILDERSUPRERAAGT15217
8Haveon Deal Services Pvt LtdUPRERAAGT11643
9IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
10INVEST MANGOUPRERAAGT12212
11INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
12KANHAIYA ANANDUPRERAAGT10098
13Kshitij AkshayUPRERAAGT17784
14Niraj Kumar SrivastavaUPRERAAGT10591
15PRIYANKA MARWHAUPRERAAGT18841
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Apr 2028.

Sanctioned by Noida Authority · 20,000 sqm of land · an approved plan of 5 blocks and 737 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2023/01/12/826623 Apr 202322 Apr 202813 Apr 202930 Apr 2027
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
A-107, Sector 153 NOIDA20000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 4251
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · NOIDA/Inst./2019/1851
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · 4251
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 4251
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New15 May 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 May 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New16 May 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 May 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New15 May 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New15 May 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New15 May 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New15 May 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 May 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 May 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 May 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 May 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New25 May 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2025-Q4.

QuarterConstructionCertificates
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q236.91%CA ↗ · Arch ↗ · Eng ↗
2025-Q357%CA ↗ · Arch ↗ · Eng ↗
2025-Q470%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameJAM VISION TECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM234812
PANAABCJ8964A
CIN / TANU72900DL2007PTC157477
Name of chairmanAJAY KUMAR
Registered addressACE STUDIO, 7TH FLOOR, PLOT NO. 01/B , SECTOR-126 , NOIDA ,GAURAM BUDH NAGAR, UTTAR PRADESH -201303
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Jam Vision Tech Pvt Ltd RERA collection A/C ACE153BankIndusInd Bank LtdBranchSector-18 NoidaBranch addressN 10-11 ,Sector-18 , Noida (U.P.)-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailreachusindusind.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Jam Vision Tech Pvt Ltd ACE RERA Separate A/C ACE153BankICICI Bank LtdBranchSector-132 NoidaBranch addressExpress Trade Towers , Plot No. B-36 ;Sector-132 Noida (U.P)-201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Jam Vision Tech Pvt Ltd RERA Transaction A/C ACE 153BankICICI Bank LtdBranchSector-132 NoidaBranch addressExpress Trade Tower 2, Plot No B-36, Sector-132, Noida (U.P.)-201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579Branch emails.gaur[at]icicibank.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about ACE 153

Is ACE 153 RERA registered?

Yes. ACE 153 is registered with UPRERA under registration number UPRERAPRJ423807, registered on 10 Jun 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for ACE 153?

The completion date filed with UPRERA is 30 Apr 2027. No completion certificate is on record yet.

Who is the builder of ACE 153?

JAM VISION TECH PRIVATE LIMITED is the promoter entity that filed ACE 153 with UPRERA (promoter RERA ID UPRERAPRM234812). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does ACE 153 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

What configurations are available in ACE 153?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in ACE 153?

The approved unit plan filed with UPRERA runs from 10 to 268 m² of carpet area (about 103 to 2,886 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in ACE 153?

The approved unit plan describes 5 blocks and 737 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is ACE 153?

About 149 units per acre: 737 planned units across 4.94 acres (20,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗