Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ4514
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Jul 2017
Project duration72 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address01-B, Sector-126, Noida, U.P.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    IV- 1433

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Aug 2017
Original completion31 Dec 2021
Revised completion29 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,33,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors492 · 15 · 26 (units from plan)
  • 3 BHK304 62%
  • 2 BHK132 27%
  • 4 BHK44 9%
  • PENTHOUSE12 2%
ConfigurationUnitsCarpet area
2 BHK13265-67
3 BHK30482-140
PENTHOUSE12195-311
4 BHK44185-250
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 and 3 · 2 BHK, 3 BHK2414065-86
Tower 1 and 3 [Duplex Penthouse 3 BHK+Study+Utili · PENTHOUSE22311
Tower 2 (3 BHK+2Toilet) · 3 BHK249682-82
Tower 2 (Duplex Penthouse 4 BHK+Study +utility) · PENTHOUSE22297
Tower 4, 5 & 6 (3BHK + Utility) · 3 BHK2078125-126
Tower 4, 5 & 6 (3BHK 3Toilet) · 3 BHK12113
Tower 4, 5 & 6 (4BHK + Utility) · 4 BHK12246-250
Tower 4, 5 & 6 (Simplex Penthouse 4 BHK+Utility) · PENTHOUSE12220
Tower 7 ( 4 BHK+Family lounge+Utility) · 4 BHK2040185-185
Tower 7 ( Duplex Penthouse 4 BHK+Family lounge+Uti · PENTHOUSE22271
Tower 8 (3 BHK+Utility) · 3 BHK2040140-140
Tower 8 (Duplex Penthouse 4BHK+Utility) · PENTHOUSE22245
Tower 9,10 &11 · 4 BHK12219
Tower 9,10 &11 (3BHK) · 3 BHK2080102-108
Tower 9,10 &11 (Simplex Penthouse 4BHK) · PENTHOUSE12195
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Raj Kumar
License CA/2011/53853
Vill- chaundhera (Kila) Po- daugwan Teh- dibai Dist- bulandshahr up 202393
Engineer
Kamal Kumar Sabharwal
HS-25, 2nd FLOOR, KAILASH COLONY MARKET, NEW DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
The plot will be demarcated as per the sanction and survey drawing
2Boundary Wall
A boundary wall of RCC/Brick with plaster and railings will be prepared
3Road Work
Access road to all the towers will be provided and the roads will be designed to take up live load as per approvals and NBC
4Footpaths
Designed footpath in the central green as walkway and jogging track
5Water Supply Including Drinking Water Facilities
Noida Authority shall supply water for the entire society and it shall be treated and pumped to all the houses.
6Sewer System
centralised STP to treat the sewage will be designed and provided
7Drain
Rain water drains will be provided as per the design
8Parks
Beautiful parks will be made for all residents to enjoy
9Tree Planting
As per approved building plan, apt no of trees will be provided
10Design For Electric Supply Including Street Lighting
Power supply from Noida Electricity board and Street lighting As per approved building plan
11Community Buildings
club will be made As per approved building plan and it will be a state of the art building with all modern facilities
12Treatment and Disposal System of Sewage and Sullage water
Centralised STP to treat the sewage
13Solid Waste Management And Disposal System
collection, storage, and disposal will be done as per sanctions and NBC
14Water Conservation System
rain water harvesting system is being provided to conserve rain water and dual flush system will also be provided with water saving fittings
15Energy Management System Including Use of Renewable Energy
usage of LED lights will be used all over the project and use of solar lights will also be explored
16Fire Protection And Fire Safety System
As per approved building plan we will design best fire protection system consisting of sprinklers, smoke detecters and fire alarms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering places in the club are being provided such as community hall, and amphitheater in the park
18Emergency Evacuation Services
As per approved building plan and fire approvals, fire staircase are being provided .
19Other Miscellaneous Work
As per approved building plan
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

27 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
4GATEWAY PROPMART PVT LTDUPRERAAGT10384
5Haveon Deal Services Pvt LtdUPRERAAGT11643
6Imperial Real Estate Solutions Private LimitedUPRERAAGT12329
7Investor Mart C/o Amar SangwanUPRERAAGT13201
8JAI AMBEY CONSULTANTSUPRERAAGT11064
9KANHAIYA ANANDUPRERAAGT10098
10Niraj Kumar SrivastavaUPRERAAGT10591
11OHM SURYA PROPMART PVT. LTD.UPRERAAGT11609
12Ovearth Private LimitedUPRERAAGT10091
13PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
14PROPSHOPUPRERAAGT10129
15PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
16REAL BRICKS INFRATECHUPRERAAGT13418
17REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
18Sapphire EstateUPRERAAGT12673
19Sheel MittalUPRERAAGT14350
20SMC Real Estate Advisors Private LimitedUPRERAAGT10113
21SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
22star estateUPRERAAGT10202
23Sushil vyasUPRERAAGT13744
24TANISHQ REALTECH PVT.LTD.UPRERAAGT12366
25TRUHOMES REALTYUPRERAAGT10997
26UMANG ESTATES C/O VIRENDER SINGHUPRERAAGT11784
27VALUEMAX ADVISORS CONSULTING PRIVATE LIMITEDUPRERAAGT11361
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2020.

Sanctioned by Noida Authority · 45,604 sqm of land · an approved plan of 15 blocks and 492 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
IV- 14331 Jul 201530 Jun 202015 Apr 202431 Dec 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Jun 2023.

#Granted fromExtended uptoNote
131 Dec 202130 Jun 2022Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202229 Jun 2023—

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SC-01/B-8 OF SPORTS CITY PLOT NO SC-01/B, SECTOR 145603Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 3723
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 6001
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · 479
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · JILD NO 5965, PAGE 125 TO 168 SNO 3723
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Dec 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old20 Feb 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old20 Feb 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old20 Feb 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old20 Feb 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old20 Feb 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old20 Feb 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old20 Feb 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old3 Mar 2018 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameACE INFRACITY DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM6202
PANAAKCA8693E
CIN / TANMRTA05571G
Name of chairmanAJAY KUMAR
Registered address01-B, Sector-126, Noida, U.P.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ACE INRACITY DEVELOPERS PRIVATE LIMITEDBankICICI BANKBranchICICI BANK A-31, Anand Vihar, Karkardooma, Delhi-110092A/C no.IFSCICIC0000330
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)16 (Under Registration - 2 ) → 17 (Under Registration - 3 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)15 (Under Registration - 2 ) → 16 (Under Registration - 2 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)14 (Under Registration - 1 ) → 15 (Under Registration - 2 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)14 (Under Registration - 2 ) → 14 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 5 Oct 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Ace Parkway

Is Ace Parkway RERA registered?

Yes. Ace Parkway is registered with UPRERA under registration number UPRERAPRJ4514, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Ace Parkway?

The completion date filed with UPRERA is 29 Jun 2023. No completion certificate is on record yet.

Who is the builder of Ace Parkway?

ACE INFRACITY DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Ace Parkway with UPRERA (promoter RERA ID UPRERAPRM6202). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Ace Parkway more time to complete?

UPRERA's record carries 2 completion extensions for Ace Parkway, the latest running to 29 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Ace Parkway have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Ace Parkway located?

Ace Parkway is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Ace Parkway?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, PENTHOUSE and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Ace Parkway?

The approved unit plan filed with UPRERA runs from 65 to 311 m² of carpet area (about 700 to 3,349 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Ace Parkway?

The approved unit plan describes 15 blocks and 492 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Ace Parkway?

About 44 units per acre: 492 planned units across 11.27 acres (45,604 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗