Samridhi Daksh Avenue is a RERA-registered residential project by SAMRIDHI BUILDMART PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ155408). Registered with a completion deadline of 30 Nov 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ155408 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Jun 2019 |
| Project duration | 102 months |
| Address | Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Company |
| Applicant address | Regd office-438,Jagriti Enclave, Delhi-110092 Site/Project Office-SC-02/E, Sector-150, Noida, Gautam Budh Nagar, Uttar Pradesh |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 29 May 2019 |
| Original completion | 31 May 2027 |
| Revised completion | 30 Nov 2027 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,68,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK308 65%
- 4 BHK140 30%
- SHOP18 4%
- 5 BHK7 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 308 | 98-113 |
| 4 BHK | 140 | 152 |
| 5 BHK | 7 | 257 |
| SHOP | 18 | 3-18 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 113-257 |
| B · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 113-257 |
| C · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 113-257 |
| COMMERCIAL · SHOP | 2 | 18 | 3-18 |
| D · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 98-257 |
| E · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 98-257 |
| F · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 98-257 |
| G · 3 BHK, 4 BHK, 5 BHK | 22 | 65 | 98-257 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot boundries as per given by Noida Authority already demarcated. |
| 2 | Boundary Wall Brickwork boundary wall of 8 ft height all around the periphery |
| 3 | Road Work Roads will be provided. |
| 4 | Footpaths Interlock pavers to be used. |
| 5 | Water Supply Including Drinking Water Facilities The plot is alloted by Noid Development Authority. water will be supplied by the authority. Hence NOC for supply of water is not required.
Water will be received in under ground tank, then processed in water treatment plant and treated water stored in tanks. |
| 6 | Sewer System Under ground system. Feeder pipeline of UPVC and final discharge through RCC pipes. |
| 7 | Drain Storm water will go to harvesting recharge pits. Excess water if any, will be discharge to authority drain. |
| 8 | Parks Parks/ green area will be provided in the township. Green area will have facilities of Jogging track, badminton, garden etc. It shall be provided as per approved plan. |
| 9 | Tree Planting 280 Nos of tree planting will be done |
| 10 | Design For Electric Supply Including Street Lighting HT line shall be taken from NPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based. |
| 11 | Community Buildings Club house of 882.80 sq mtr with community hall, banquet facility, coffee house, Gym, swimming pool will be provided. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Raw sewerage will be processed through STP of six hundred capacity. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasible. Excess treated water shall be discharge in the authority drain. |
| 13 | Solid Waste Management And Disposal System Kitchen waste collection will be collected thorough processed in a plant to make manure . Other waste shall be manually handle for dispossal. |
| 14 | Water Conservation System Harvesting recharge pits shall be used. Treated water shall be used for flushing, irrigation and cleaning purpose as much as feasiable |
| 15 | Energy Management System Including Use of Renewable Energy Top five floors will be provided for Solor heating water for kitchen. |
| 16 | Fire Protection And Fire Safety System Fire hydrant shall be provided. Fire alarm system, sprinkler, smoke detector and fire extinguisher shall be provied as required. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Retail shops are be provided as part of commercial area to be sold separately by developers. Swimming pool shall be provided as part of the club. |
| 18 | Emergency Evacuation Services Fire tender route and refuse areas shall be provided. Emergency stairs shall be provided as approved by fire department. |
| 19 | Other Miscellaneous Work NA |
Registered agents
7 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | AB INVEST HOMZ PVT. Ltd | UPRERAAGT14018 |
| 2 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 3 | OXBUILT INFRATECH PRIVATE LIMITED | UPRERAAGT10517 |
| 4 | PROPCASA CONSULTANCY PVT. LTD. | UPRERAAGT10038 |
| 5 | PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED) | UPRERAAGT10032 |
| 6 | PROPZONE INFRATECH | UPRERAAGT10285 |
| 7 | star estate | UPRERAAGT10202 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 15 Jan 2024. 2 of them carry a revalidation, the latest valid to 14 Jan 2029.
Sanctioned by Noida Authority · 32,519 sqm of land · an approved plan of 8 blocks and 473 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| NOIDA/2019/IV- 1481/1088 | 16 Jan 2019 | 15 Jan 2024 | 15 Jan 2029 | 31 May 2027 | — | |
| NOIDA/2019/IV- 1481/1088 | 16 Jan 2019 | 15 Jan 2024 | 22 Sept 2036 | 30 Nov 2027 | 16 Jan 2019 valid to 14 Jan 2029 | |
| NOIDA/2019/IV- 1481/1088 | 16 Jan 2019 | 15 Jan 2024 | 22 Sept 2036 | 30 Nov 2027 | 16 Jan 2019 valid to 14 Jan 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Nov 2027.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 May 2027 | 30 Nov 2027 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| SC-02/E, Sector-150 Noida | 32519.22 Sqm | Plot |
| Lease deed · 2405 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 34 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Mar 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Mar 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 May 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 May 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Mar 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Mar 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Mar 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Mar 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 24 May 2019 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 30.66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 33.1% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 37.42% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 45.91% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SAMRIDHI BUILDMART PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM82780 |
| PAN | AADCT7057Q |
| CIN / TAN | DELT10193B |
| Name of chairman | MR. DINESH KUMAR GUPTA |
| Registered address | Regd office-438,Jagriti Enclave, Delhi-110092 Site/Project Office-SC-02/E, Sector-150, Noida, Gautam Budh Nagar, Uttar Pradesh |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Samridhi Buildmart Private LimitedBankICICI BANKBranchAnand ViharA/C no.IFSCICIC0000330 |
What has changed on this record
12 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Permit paperwork 3 · Project Specifications | Project Specifications newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 3 · Floor Plan Of All Types | Floor Plan Of All Types newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 3 · Approved Map | Approved Map newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 3 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 3 · Approved Layout | Approved Layout newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 2 · Project Specifications | Project Specifications newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 2 · Floor Plan Of All Types | Floor Plan Of All Types newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 2 · Approved Map | Approved Map newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 2 · Sanctioned Letter | Sanctioned Letter newly filed with RERA | 1 Oct 2026 |
| Permit paperwork 2 · Approved Layout | Approved Layout newly filed with RERA | 1 Oct 2026 |
| Sanctioning permit no. 3 | NOIDA/2019/IV- 1481/1088 newly filed with RERA | 1 Oct 2026 |
| Sanctioning permit no. 2 | NOIDA/2019/IV- 1481/1088 newly filed with RERA | 1 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Samridhi Daksh Avenue
Is Samridhi Daksh Avenue RERA registered?
Yes. Samridhi Daksh Avenue is registered with UPRERA under registration number UPRERAPRJ155408, registered on 29 May 2019. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Samridhi Daksh Avenue?
The completion date filed with UPRERA is 30 Nov 2027. No completion certificate is on record yet.
Who is the builder of Samridhi Daksh Avenue?
SAMRIDHI BUILDMART PRIVATE LIMITED is the promoter entity that filed Samridhi Daksh Avenue with UPRERA (promoter RERA ID UPRERAPRM82780). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Samridhi Daksh Avenue more time to complete?
UPRERA's record carries 1 completion extension for Samridhi Daksh Avenue, the latest running to 30 Nov 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Samridhi Daksh Avenue have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Samridhi Daksh Avenue located?
Samridhi Daksh Avenue is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Samridhi Daksh Avenue?
The unit plan filed with UPRERA lists 3 BHK, 4 BHK, 5 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Samridhi Daksh Avenue?
The approved unit plan filed with UPRERA runs from 3 to 257 m² of carpet area (about 30 to 2,769 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Samridhi Daksh Avenue?
The approved unit plan describes 8 blocks and 473 units of which 455 are homes and 18 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Samridhi Daksh Avenue?
About 59 units per acre: 473 planned units across 8.04 acres (32,519 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗