Ace Starlit is a RERA-registered residential project by Star Landcraft Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ677294). Registered with a completion deadline of 30 Apr 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ677294
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 May 2021
Project duration48 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressPLOT NO. 01/B SECTOR -126 NOIDA U.P-201303
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NOIDA/CAP/2016/IV-1495/941

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered25 May 2021
Original completion30 Apr 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,42,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors526 · 6 · 27 (units from plan)
Homes · commercial units492 · 34 (shops and offices filed in the same plan)
  • 2 BHK300 57%
  • 3 BHK192 37%
  • SHOP34 6%
ConfigurationUnitsCarpet area
2 BHK30075-76
3 BHK192110-110
SHOP3417-112
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · 2 BHK, OTHER2715075-76
A2 · 2 BHK, OTHER2715075-76
B1 · 3 BHK1764110-110
B2 · 3 BHK1764110-110
B3 · 3 BHK1764110-110
COMMERCIAL · SHOP33417-112
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Labib Alam
License CA/2001/27447
Arcop Associates Pvt Ltd, A-a15 Pamposh Enclave, GK-1, New Delhi -110048
Engineer
Dr. Maqsud E Nazar
NNC Design, International, G-70, 2nd Floor, Jaswant Plaza, Shaheen Bagh, New Delhi
Contractor
Mobarak Ali
Village Airanjonagla, Part-1, PO AMRoad, PS Dhubri, Dist. Dhubri, Assam -783323
Sr.Development work declared to RERA
1Demarcation of Plots
The plot will be demarcated as per the sanction and survey drawing. A detailed survey of all the coordinates will be done and the exact dimensions will be marked at the site. The demarcation will be as per the lease deed and the kabza letter of the project.
2Boundary Wall
A boundary wall of RCC/Brick with plaster and railing will be made. The boundary wall will be made as per the permissible sides of the plot since the plot is a part of the sports city hence all the 4 sides can’t have a boundary wall as per the NOIDA authority norms. But the boundaries of the plot will be property secured with hedges and safety will be provided for the residents.
3Road Work
Access road to all towers will be provided as per design. They will be designed to take up the live load and as per NBC. The roads will be a mix of concrete or cobbles and stone cobbles so that the desired design is achieved. The roads will take care of all vehicular traffic and will provide access to each and every tower.
4Footpaths
Designed footpath in the central green as walkways and jogging track. These footpath will be made from cobbles, stone cobbles, and green pavers.
5Water Supply Including Drinking Water Facilities
NOIDA authority shall supply water for the entire society, which shall be supplied to all units. The water will be first pumped to the underground storage tanks, it will be then pumped to the overhead storage tanks of all towers for regular supply of water.
6Sewer System
All the sever will be transferred thru the network of pipes through the shafts and will flow to the STP of the project. Centralised STP to treat the sewage will be designed and provided. This STP will be made in MBBR technology and will treat all the sewage generated of the project.
7Drain
Rain water drains as per design and requirements. The drains will collect the surface runoff as well as the water from the terraces and the collected rainwater will run thru a proper network of channels. These channels will lead to the rainwater harvesting pits provided. The overflow of the rainwater pits will also be connected to each other as well.
8Parks
Beautiful parks as per design will be made for residents to enjoy and relax. Various features as flower beds, gardens, trees, light bollards, sit out areas will be provided in the parks. Various playing facility for toddlers and kids and relaxing areas for elders will be provided.
9Tree Planting
The no of trees as per approved building plan and design. The trees will be a mix of shady, ornamental, flowing, evergreen and seasonal trees. They will provide necessary greenery, shade, and will act as oxygen lungs for the society.
10Design For Electric Supply Including Street Lighting
Power supply from NOIDA electricity Board and street light as per design standards. Required number of GD sets will be provided in the project to cater to residents and for common areas as well. The electric supply will be based on the prevalent standards, norms and for the comfort of the residents.
11Community Buildings
Club will be made as per approved building plan with all modern facilities. Community hall, gym, indoor play areas and relaxing sitting areas will be provided. The club building exteriors and interiors will be made state of the art and modern. The club will cater to all age groups of residents and will be a gathering place for the residents.
12Treatment and Disposal System of Sewage and Sullage water
STP will be provided as per design to treat the sewage. The STP will be based on MBBR technology and will be able to treat all the sewage generated. The treated will be used for flushing of the toilets and for the landscaping irrigation works. Additional treated water, if there, will be used for the irrigation of the green belt.
13Solid Waste Management And Disposal System
Collection, storage and disposal as per NBC and UPPCB. The Solid waste will be collected from door to door and will be segregated at the source itself. It will be mandatory for the residents to fully segregate their solid waste before handing it over to the collection team. Separate blue and green dustbins will be provided at the common areas for disposal of SW. The recyclable waste will be given to authorised recyclers and proper documentation will be done for the same.
14Water Conservation System
Rain water harvesting system will be provided as per design and dual flushing system will also be provided. Water conservation practices will be followed throughout the project with residents being advised to practice minimum water wastage and adopt all water conservation practices.
15Energy Management System Including Use of Renewable Energy
Usage of LED lights will be done for common areas of the project. The use of the common lighting will be optimised by using grid system for closing the alternative lights after 12 pm at night. Also other systems of energy optimisation will be used such as all common area lighting including the street lights, facade lights, corridor lights and all lights in landscape areas will be LED lights.
16Fire Protection And Fire Safety System
Best design fire protection system as per the approvals and norms . Use of fire sprinkler system, smoke detectors and fire alarm system. Fire staircases, fire escape routes, fire drills for the residents, fire related awareness programmes.. Fire safety being the utmost important matter during construction and after the handover of the project, designated tasks of fire management will be given to the fire officer in charge.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social gathering places in the club and park are being designed. Amphitheater, park areas, tot lots and other gathering places in the landscaped areas. Stilt areas of the towers will have catering places and recreation places for the residents to enjoy. Club or community building will have maximum social and recreational places.
18Emergency Evacuation Services
As per approved building plan and fire approvals, fire staircases as per the norms and approvals. Proper fire exit markings will be provided at all and strategic locations to guide the exit during emergency. Emergency exits will be regular checked for any obstruction and clearances will always be made clear. The fire tanks, fire hose, fire reels will be regularly checked and maintained periodically.
19Other Miscellaneous Work
Beautification of the whole complex and the work to make the project into a state of the art residential project. All the works will be done As per approved building plans and norms. The facade of the building will be made in a very unique design and the project will stand out as a landmark project. Proper waterproofing of all the wet areas will be done to ensure there is no seepage and water ingress into other areas.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

50 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Alok SinghUPRERAAGT19426
2Amit kumar kaushikUPRERAAGT18627
3BLUECRUMBS INFRA PRIVATE LIMITEDUPRERAAGT16897
4Brajesh KumarUPRERAAGT15799
5CAPITALBOON CONSULTINGUPRERAAGT18663
6CLUB ONE REALTORS LLPUPRERAAGT20209
7Devendra KumarUPRERAAGT19428
8Fareed AhmadUPRERAAGT20469
9FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
10HAPPY HOMES REALTORS AND BUILDERSUPRERAAGT15217
11Haveon Deal Services Pvt LtdUPRERAAGT11643
12IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
13Innovance Realty Private LimitedUPRERAAGT13354
14INVEST MANGOUPRERAAGT12212
15KANHAIYA ANANDUPRERAAGT10098
16Kshitij AkshayUPRERAAGT17784
17MAYANKUPRERAAGT15731
18MOHIT GOYALUPRERAAGT15259
19Momentum Realty ServicesUPRERAAGT18261
20Naturetech Realty Private LimitedUPRERAAGT10282
21NEW DOOR REALITY PRIVATE LIMITEDUPRERAAGT15265
22Niraj Kumar SrivastavaUPRERAAGT10591
23Nitesh kohliUPRERAAGT20848
24NITESH PRATAP SINGH SHISHODIAUPRERAAGT16082
25Pahul jeet singh bhuiUPRERAAGT20881
26PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
27PRIYANKA MARWHAUPRERAAGT18841
28PROPERTYFOLKS ADVISORY PRIVATE LIMITEDUPRERAAGT20615
29PROPSHOPUPRERAAGT10129
30PropXpert Realtors Pvt. Ltd. (C/O Murli Manohar Vohra)UPRERAAGT15957
31RAHULUPRERAAGT20296
32RAJIV KUMAR PANDEYUPRERAAGT20575
33RAVS INFRATECH PRIVATE LIMITEDUPRERAAGT20392
34REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD)UPRERAAGT18286
35REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
36REDMAPLE BUILDIKO PRIVATE LIMITEDUPRERAAGT14395
37SACHIN KUMAR DUBEYUPRERAAGT20681
38SMC Real Estate Advisors Private LimitedUPRERAAGT10113
39SOMIT SHARMAUPRERAAGT16099
40Sonali MahantUPRERAAGT15610
41star estateUPRERAAGT10202
42STEPYARD INFRATECH PRIVATE LIMITEDUPRERAAGT16057
43SUDHANSHU AGARWALUPRERAAGT19783
44Supertrust Homes Pvt LtdUPRERAAGT16429
45Sushil vyasUPRERAAGT13744
46Umesh kumar AhujaUPRERAAGT19597
47VALUEMAX ADVISORS CONSULTING PRIVATE LIMITEDUPRERAAGT11361
48Vikas TanwarUPRERAAGT20560
49VIKRAM KUMAR CHACHRAUPRERAAGT20853
50Walmond Realty Dart Pvt LtdUPRERAAGT10777
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 Nov 2021.

Sanctioned by Noida Authority · 27,496 sqm of land · an approved plan of 6 blocks and 526 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NOIDA/CAP/2016/IV-1495/9418 Nov 20167 Nov 202130 Jun 202530 Apr 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot SC-01/09, sector 152 NOIDA27496Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Book-1, Volume 5008, Page 253-314, Document 7049
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · NOIDA/Commercial/2015/1128
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · NOIDA/Commercial/2016/432
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Apr 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New3 May 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New3 May 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Apr 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New23 Apr 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New23 Apr 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New23 Apr 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New23 Apr 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Apr 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New24 May 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 May 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 May 2021 ↗

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2025-Q1.

QuarterConstructionCertificates
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameStar Landcraft Private Limited
RolePromoter · current
RERA IDUPRERAPRM140560
PANAATCS5903J
CIN / TANMRTS10132D
Name of chairmanAJAY KUMAR
Registered addressPLOT NO. 01/B SECTOR -126 NOIDA U.P-201303
RERA contact
Registered since2021
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SLPL-ACE STARLIT RERA RETENTION ACCOUNTBankICICI BANK LTDBranchNOIDA 132 BRANCHBranch addressETT-2 PLOT NO. B-36 SECTOR-132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC001579
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SLPL-ACE Strarlit RERA Collection AccountBankICICI Bank Ltd.BranchNoida Sector 132 BranchBranch addressETT-2, Plot NO B-36, Sector 132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SLPTL-ACE STARLIT RERA EXPENSES A/CBankICICI BANK LTDBranchNOIDA SECTOR132Branch addressETT PLOT NO. B-36 SECTOR-132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 25
ENGINEERS CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 24
ARCHITECT CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 23
CA CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 22
Affidavit (Form-B)
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 21
Development Work Plan
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 20
Electricity Supply Plan
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 19
Water Supply Plan
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 18
Waste Disposal Plan
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 17
Proforma of Conveyance Deed
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 16
Proforma of Allotment Letter
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 15
Proforma of Application Form
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 14
Other Plan(If Any)
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 13
Commencement Certificate
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 12
Details of Encumbrances
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 11
ENGINEERS CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 10
ARCHITECT CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 9
CA CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 8
CA CERTIFICATE
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 7
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
11 Sept 2026
Filed document
viewprojects · 6
Proforma of Allotment Letter
newly filed with RERA
11 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Ace Starlit

Is Ace Starlit RERA registered?

Yes. Ace Starlit is registered with UPRERA under registration number UPRERAPRJ677294, registered on 25 May 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Ace Starlit?

The completion date filed with UPRERA is 30 Apr 2025. No completion certificate is on record yet.

Who is the builder of Ace Starlit?

Star Landcraft Private Limited is the promoter entity that filed Ace Starlit with UPRERA (promoter RERA ID UPRERAPRM140560). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Ace Starlit have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Ace Starlit located?

Ace Starlit is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Ace Starlit?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Ace Starlit?

The approved unit plan filed with UPRERA runs from 17 to 112 m² of carpet area (about 186 to 1,202 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Ace Starlit?

The approved unit plan describes 6 blocks and 526 units of which 492 are homes and 34 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Ace Starlit?

About 77 units per acre: 526 planned units across 6.79 acres (27,496 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.