Ace Starlit is a RERA-registered residential project by Star Landcraft Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ677294). Registered with a completion deadline of 30 Apr 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ677294 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 May 2021 |
| Project duration | 48 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | PLOT NO. 01/B SECTOR -126 NOIDA U.P-201303 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
NOIDA/CAP/2016/IV-1495/941
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 May 2021 |
| Original completion | 30 Apr 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,42,500 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK300 57%
- 3 BHK192 37%
- SHOP34 6%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 300 | 75-76 |
| 3 BHK | 192 | 110-110 |
| SHOP | 34 | 17-112 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A1 · 2 BHK, OTHER | 27 | 150 | 75-76 |
| A2 · 2 BHK, OTHER | 27 | 150 | 75-76 |
| B1 · 3 BHK | 17 | 64 | 110-110 |
| B2 · 3 BHK | 17 | 64 | 110-110 |
| B3 · 3 BHK | 17 | 64 | 110-110 |
| COMMERCIAL · SHOP | 3 | 34 | 17-112 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plot will be demarcated as per the sanction and survey drawing. A detailed survey of all the coordinates will be done and the exact dimensions will be marked at the site. The demarcation will be as per the lease deed and the kabza letter of the project. |
| 2 | Boundary Wall A boundary wall of RCC/Brick with plaster and railing will be made. The boundary wall will be made as per the permissible sides of the plot since the plot is a part of the sports city hence all the 4 sides can’t have a boundary wall as per the NOIDA authority norms. But the boundaries of the plot will be property secured with hedges and safety will be provided for the residents. |
| 3 | Road Work Access road to all towers will be provided as per design. They will be designed to take up the live load and as per NBC. The roads will be a mix of concrete or cobbles and stone cobbles so that the desired design is achieved. The roads will take care of all vehicular traffic and will provide access to each and every tower. |
| 4 | Footpaths Designed footpath in the central green as walkways and jogging track. These footpath will be made from cobbles, stone cobbles, and green pavers. |
| 5 | Water Supply Including Drinking Water Facilities NOIDA authority shall supply water for the entire society, which shall be supplied to all units. The water will be first pumped to the underground storage tanks, it will be then pumped to the overhead storage tanks of all towers for regular supply of water. |
| 6 | Sewer System All the sever will be transferred thru the network of pipes through the shafts and will flow to the STP of the project. Centralised STP to treat the sewage will be designed and provided. This STP will be made in MBBR technology and will treat all the sewage generated of the project. |
| 7 | Drain Rain water drains as per design and requirements. The drains will collect the surface runoff as well as the water from the terraces and the collected rainwater will run thru a proper network of channels. These channels will lead to the rainwater harvesting pits provided. The overflow of the rainwater pits will also be connected to each other as well. |
| 8 | Parks Beautiful parks as per design will be made for residents to enjoy and relax. Various features as flower beds, gardens, trees, light bollards, sit out areas will be provided in the parks. Various playing facility for toddlers and kids and relaxing areas for elders will be provided. |
| 9 | Tree Planting The no of trees as per approved building plan and design. The trees will be a mix of shady, ornamental, flowing, evergreen and seasonal trees. They will provide necessary greenery, shade, and will act as oxygen lungs for the society. |
| 10 | Design For Electric Supply Including Street Lighting Power supply from NOIDA electricity Board and street light as per design standards. Required number of GD sets will be provided in the project to cater to residents and for common areas as well. The electric supply will be based on the prevalent standards, norms and for the comfort of the residents. |
| 11 | Community Buildings Club will be made as per approved building plan with all modern facilities. Community hall, gym, indoor play areas and relaxing sitting areas will be provided. The club building exteriors and interiors will be made state of the art and modern. The club will cater to all age groups of residents and will be a gathering place for the residents. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP will be provided as per design to treat the sewage. The STP will be based on MBBR technology and will be able to treat all the sewage generated. The treated will be used for flushing of the toilets and for the landscaping irrigation works. Additional treated water, if there, will be used for the irrigation of the green belt. |
| 13 | Solid Waste Management And Disposal System Collection, storage and disposal as per NBC and UPPCB. The Solid waste will be collected from door to door and will be segregated at the source itself. It will be mandatory for the residents to fully segregate their solid waste before handing it over to the collection team. Separate blue and green dustbins will be provided at the common areas for disposal of SW. The recyclable waste will be given to authorised recyclers and proper documentation will be done for the same. |
| 14 | Water Conservation System Rain water harvesting system will be provided as per design and dual flushing system will also be provided. Water conservation practices will be followed throughout the project with residents being advised to practice minimum water wastage and adopt all water conservation practices. |
| 15 | Energy Management System Including Use of Renewable Energy Usage of LED lights will be done for common areas of the project. The use of the common lighting will be optimised by using grid system for closing the alternative lights after 12 pm at night. Also other systems of energy optimisation will be used such as all common area lighting including the street lights, facade lights, corridor lights and all lights in landscape areas will be LED lights. |
| 16 | Fire Protection And Fire Safety System Best design fire protection system as per the approvals and norms . Use of fire sprinkler system, smoke detectors and fire alarm system. Fire staircases, fire escape routes, fire drills for the residents, fire related awareness programmes.. Fire safety being the utmost important matter during construction and after the handover of the project, designated tasks of fire management will be given to the fire officer in charge. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social gathering places in the club and park are being designed. Amphitheater, park areas, tot lots and other gathering places in the landscaped areas. Stilt areas of the towers will have catering places and recreation places for the residents to enjoy. Club or community building will have maximum social and recreational places. |
| 18 | Emergency Evacuation Services As per approved building plan and fire approvals, fire staircases as per the norms and approvals. Proper fire exit markings will be provided at all and strategic locations to guide the exit during emergency.
Emergency exits will be regular checked for any obstruction and clearances will always be made clear. The fire tanks, fire hose, fire reels will be regularly checked and maintained periodically. |
| 19 | Other Miscellaneous Work Beautification of the whole complex and the work to make the project into a state of the art residential project. All the works will be done As per approved building plans and norms. The facade of the building will be made in a very unique design and the project will stand out as a landmark project. Proper waterproofing of all the wet areas will be done to ensure there is no seepage and water ingress into other areas. |
Registered agents
50 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Alok Singh | UPRERAAGT19426 |
| 2 | Amit kumar kaushik | UPRERAAGT18627 |
| 3 | BLUECRUMBS INFRA PRIVATE LIMITED | UPRERAAGT16897 |
| 4 | Brajesh Kumar | UPRERAAGT15799 |
| 5 | CAPITALBOON CONSULTING | UPRERAAGT18663 |
| 6 | CLUB ONE REALTORS LLP | UPRERAAGT20209 |
| 7 | Devendra Kumar | UPRERAAGT19428 |
| 8 | Fareed Ahmad | UPRERAAGT20469 |
| 9 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 10 | HAPPY HOMES REALTORS AND BUILDERS | UPRERAAGT15217 |
| 11 | Haveon Deal Services Pvt Ltd | UPRERAAGT11643 |
| 12 | IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited) | UPRERAAGT10048 |
| 13 | Innovance Realty Private Limited | UPRERAAGT13354 |
| 14 | INVEST MANGO | UPRERAAGT12212 |
| 15 | KANHAIYA ANAND | UPRERAAGT10098 |
| 16 | Kshitij Akshay | UPRERAAGT17784 |
| 17 | MAYANK | UPRERAAGT15731 |
| 18 | MOHIT GOYAL | UPRERAAGT15259 |
| 19 | Momentum Realty Services | UPRERAAGT18261 |
| 20 | Naturetech Realty Private Limited | UPRERAAGT10282 |
| 21 | NEW DOOR REALITY PRIVATE LIMITED | UPRERAAGT15265 |
| 22 | Niraj Kumar Srivastava | UPRERAAGT10591 |
| 23 | Nitesh kohli | UPRERAAGT20848 |
| 24 | NITESH PRATAP SINGH SHISHODIA | UPRERAAGT16082 |
| 25 | Pahul jeet singh bhui | UPRERAAGT20881 |
| 26 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 27 | PRIYANKA MARWHA | UPRERAAGT18841 |
| 28 | PROPERTYFOLKS ADVISORY PRIVATE LIMITED | UPRERAAGT20615 |
| 29 | PROPSHOP | UPRERAAGT10129 |
| 30 | PropXpert Realtors Pvt. Ltd. (C/O Murli Manohar Vohra) | UPRERAAGT15957 |
| 31 | RAHUL | UPRERAAGT20296 |
| 32 | RAJIV KUMAR PANDEY | UPRERAAGT20575 |
| 33 | RAVS INFRATECH PRIVATE LIMITED | UPRERAAGT20392 |
| 34 | REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD) | UPRERAAGT18286 |
| 35 | REALTY WORLD INFRATECH PVT. LTD. | UPRERAAGT10531 |
| 36 | REDMAPLE BUILDIKO PRIVATE LIMITED | UPRERAAGT14395 |
| 37 | SACHIN KUMAR DUBEY | UPRERAAGT20681 |
| 38 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 39 | SOMIT SHARMA | UPRERAAGT16099 |
| 40 | Sonali Mahant | UPRERAAGT15610 |
| 41 | star estate | UPRERAAGT10202 |
| 42 | STEPYARD INFRATECH PRIVATE LIMITED | UPRERAAGT16057 |
| 43 | SUDHANSHU AGARWAL | UPRERAAGT19783 |
| 44 | Supertrust Homes Pvt Ltd | UPRERAAGT16429 |
| 45 | Sushil vyas | UPRERAAGT13744 |
| 46 | Umesh kumar Ahuja | UPRERAAGT19597 |
| 47 | VALUEMAX ADVISORS CONSULTING PRIVATE LIMITED | UPRERAAGT11361 |
| 48 | Vikas Tanwar | UPRERAAGT20560 |
| 49 | VIKRAM KUMAR CHACHRA | UPRERAAGT20853 |
| 50 | Walmond Realty Dart Pvt Ltd | UPRERAAGT10777 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 7 Nov 2021.
Sanctioned by Noida Authority · 27,496 sqm of land · an approved plan of 6 blocks and 526 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| NOIDA/CAP/2016/IV-1495/941 | 8 Nov 2016 | 7 Nov 2021 | 30 Jun 2025 | 30 Apr 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot SC-01/09, sector 152 NOIDA | 27496 | Plot |
| Lease deed · Book-1, Volume 5008, Page 253-314, Document 7049 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Allotment letter from the authority · NOIDA/Commercial/2015/1128 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · NOIDA/Commercial/2016/432 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 23 Apr 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 3 May 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 May 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Apr 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Apr 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Apr 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Apr 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Apr 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Apr 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 24 May 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 11 May 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 11 May 2021 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Star Landcraft Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM140560 |
| PAN | AATCS5903J |
| CIN / TAN | MRTS10132D |
| Name of chairman | AJAY KUMAR |
| Registered address | PLOT NO. 01/B SECTOR -126 NOIDA U.P-201303 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SLPL-ACE STARLIT RERA RETENTION ACCOUNTBankICICI BANK LTDBranchNOIDA 132 BRANCHBranch addressETT-2 PLOT NO. B-36 SECTOR-132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC001579 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SLPL-ACE Strarlit RERA Collection AccountBankICICI Bank Ltd.BranchNoida Sector 132 BranchBranch addressETT-2, Plot NO B-36, Sector 132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SLPTL-ACE STARLIT RERA EXPENSES A/CBankICICI BANK LTDBranchNOIDA SECTOR132Branch addressETT PLOT NO. B-36 SECTOR-132 NOIDA 201304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0001579 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Filed document viewprojects · 25 | ENGINEERS CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 24 | ARCHITECT CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 23 | CA CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 22 | Affidavit (Form-B) newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 21 | Development Work Plan newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 20 | Electricity Supply Plan newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 19 | Water Supply Plan newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 18 | Waste Disposal Plan newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 17 | Proforma of Conveyance Deed newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 16 | Proforma of Allotment Letter newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 15 | Proforma of Application Form newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 14 | Other Plan(If Any) newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 13 | Commencement Certificate newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 12 | Details of Encumbrances newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 11 | ENGINEERS CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 10 | ARCHITECT CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 9 | CA CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 8 | CA CERTIFICATE newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 7 | Proforma of Completion Certificate(Occupancy) newly filed with RERA | 11 Sept 2026 |
| Filed document viewprojects · 6 | Proforma of Allotment Letter newly filed with RERA | 11 Sept 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Ace Starlit
Is Ace Starlit RERA registered?
Yes. Ace Starlit is registered with UPRERA under registration number UPRERAPRJ677294, registered on 25 May 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Ace Starlit?
The completion date filed with UPRERA is 30 Apr 2025. No completion certificate is on record yet.
Who is the builder of Ace Starlit?
Star Landcraft Private Limited is the promoter entity that filed Ace Starlit with UPRERA (promoter RERA ID UPRERAPRM140560). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Ace Starlit have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Ace Starlit located?
Ace Starlit is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Ace Starlit?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Ace Starlit?
The approved unit plan filed with UPRERA runs from 17 to 112 m² of carpet area (about 186 to 1,202 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Ace Starlit?
The approved unit plan describes 6 blocks and 526 units of which 492 are homes and 34 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Ace Starlit?
About 77 units per acre: 526 planned units across 6.79 acres (27,496 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗