ANSAL TOWN MEERUT PLOT - PHASE -V is a RERA-registered residential project by Ansal Housing Limited in Meerut (RERA ID UPRERAPRJ3362). Registered with a completion deadline of 31 Dec 2019.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3362 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Meerut Development Authority |
| Proposed start | 10 Oct 2014 |
| Original start | 10 Oct 2014 |
| Project duration | 63 months |
| Address | Sardhana, Meerut |
| Tehsil | Sardhana |
| Applicant type | Company |
| Applicant address | 606, 6th Floor Indraprakash, 21 Barakhamba Road, New Delhi 110001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
16/14
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 31 Dec 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 27 Mar 2025 |
| Registration fee | ₹2,59,000 |
| Sanctioning authority | Meerut Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Done |
| 2 | Boundary Wall Done |
| 3 | Road Work Paver Road Done |
| 4 | Footpaths NA |
| 5 | Water Supply Including Drinking Water Facilities MDPE Pipe Line |
| 6 | Sewer System RCC Hume Pipe-Underground Sewer System |
| 7 | Drain Open drainage on 9 mtr Road and pipe drainage on main roads |
| 8 | Parks Grassing with plantation done |
| 9 | Tree Planting Tree plantation done along the all roads |
| 10 | Design For Electric Supply Including Street Lighting LED energy saving street lights |
| 11 | Community Buildings N.A. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Connected to Existing System of Phase-I, II, III |
| 13 | Solid Waste Management And Disposal System To be done by Nagar Nigam |
| 14 | Water Conservation System Rain Water Harvesting pits have been made as per the plan |
| 15 | Energy Management System Including Use of Renewable Energy LED street lights are being used to conserve energy |
| 16 | Fire Protection And Fire Safety System N.A. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services N.A. |
| 19 | Other Miscellaneous Work N.A. |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | DILIP KUMAR SINGH | UPRERAAGT10948 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Dec 2019.
Sanctioned by Meerut Development Authority · 50,706 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 16/14 | 16 Dec 2014 | 15 Dec 2019 | 15 Dec 2022 | 31 Dec 2019 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
Land & documents
41 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTATE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .1650 HECTARE | — |
| 24 | .2100 HECTARE | — |
| 24 | .1800 HECTARE | — |
| 24 | .1800 HECTARE | — |
| 24 | .1800 HECTARE | — |
| 24 | .1565 | — |
| 24 | .1565 HECTARE | — |
| 24 | .1565 HECTARE | — |
| 24 | .1565 HECTARE | — |
| 24 | .1565 HECTARE | — |
| 25/1 | .1950 HECTARE | — |
| 22/1 | 1.6620 HECTARE | — |
| 25/1 | .3150 HECTARE | — |
| 25/1 | .3150 HECTARE | — |
| 25/1 | .3150 HECTARE | — |
| 22/1, 24, 25/1 | 50709.26 | Khasra |
20 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 3 May 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 12754 | 10 Sept 2014 | self | — |
| 12757 | 10 Sept 2014 | self | — |
| 12758 | 10 Sept 2014 | self | — |
| 12167 | 29 Aug 2014 | self | — |
| 12168 | 29 Aug 2014 | self | — |
| 12169 | 29 Aug 2014 | self | — |
| 11351 | 12 Aug 2014 | self | — |
| 11352 | 12 Aug 2014 | self | — |
| 11353 | 12 Aug 2014 | self | — |
| 10069 | 15 Jul 2014 | self | — |
| 10698 | 30 Jul 2014 | self | — |
| 10697 | 30 Jul 2014 | self | — |
| 17042 | 3 Dec 2014 | self | — |
| 17043 | 3 Dec 2014 | self | — |
| 17983 | 22 Dec 2014 | self | — |
| 17982 | 22 Dec 2014 | self | — |
| 321 | 7 Jan 2015 | self | — |
| 6143 | 3 May 2014 | self | — |
| 320 | 7 Jan 2015 | self | — |
| 322 | 7 Jan 2015 | self | — |
| Sale deed · 12754 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12757 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12758 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12167 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12168 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12169 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11351 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11352 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11353 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10069 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10698 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10697 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17042 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17043 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17983 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17982 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 321 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 320 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 322 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 1 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 2 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 3 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 4 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 5 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 6 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6143-Part 7 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Jun 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 13 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 13 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 13 Jun 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 25 Jun 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 29 Jun 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 27 Jun 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 26 Jun 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 28 Jul 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 28 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | DRINKING WATER FACILITY IS PROVIDED |
| Fire safety (as filed with RERA) | FIRE FIGHTING FACILITY IS PROVIDED |
| Health service | SEVER LINE HAVE BEEN LAID |
| Other facilities | POLLUTION NOC OBTAINED |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Ansal Housing Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM450 |
| PAN | AAACA0377R |
| CIN / TAN | DELA12078D |
| Name of chairman | Deepak Ansal |
| Registered address | 606, 6th Floor Indraprakash, 21 Barakhamba Road, New Delhi 110001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ANSAL HOUSING LTD (AHL COLLECTION ESCROW ANSAL TOWN MEERUT PHASE V)BankHDFC BANK LTDBranchKG MARGA/C no.IFSCHDFC0000003 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about ANSAL TOWN MEERUT PLOT - PHASE -V
Is ANSAL TOWN MEERUT PLOT - PHASE -V RERA registered?
Yes. ANSAL TOWN MEERUT PLOT - PHASE -V is registered with UPRERA under registration number UPRERAPRJ3362, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has ANSAL TOWN MEERUT PLOT - PHASE -V been completed?
UPRERA still lists ANSAL TOWN MEERUT PLOT - PHASE -V as Registered, so it is not shown as completed here. A completion certificate dated 27 Mar 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of ANSAL TOWN MEERUT PLOT - PHASE -V?
Ansal Housing Limited is the promoter entity that filed ANSAL TOWN MEERUT PLOT - PHASE -V with UPRERA (promoter RERA ID UPRERAPRM450). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ANSAL TOWN MEERUT PLOT - PHASE -V have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ANSAL TOWN MEERUT PLOT - PHASE -V located?
ANSAL TOWN MEERUT PLOT - PHASE -V is registered in Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗