APEX NORTH CITY is a RERA-registered residential project by RENUKA BUILDTECH PVT. LTD. in Meerut (RERA ID UPRERAPRJ291313). Registered with a completion deadline of 31 Mar 2026.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ291313 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Meerut Development Authority |
| Proposed start | 16 Aug 2023 |
| Project duration | 32 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Company |
| Applicant address | A-312, MEERUT MALL, DELHI ROAD, MEERUT |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MDA/LD/22-23/1061
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Nov 2023 |
| Original completion | 31 Mar 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹5,10,000 |
| Sanctioning authority | Meerut Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The Project land will be demarcated by its boundary wall to the exact shape, size and orientation as per sanctioned map by Meerut Development Authority. |
| 2 | Boundary Wall A 2.4m high boundary wall of cement block will be constructed and wall will be painted. |
| 3 | Road Work Required thickness of B.C with seal coat over intermediate base over sub-base will be done in the width as per sanctioned map. |
| 4 | Footpaths An M-15 grade of paver block / interlocking tiles will be laid in the project for walking areas. Tiles will be 3 to 4 inch thick and the color patterns will be lasting and visible at all hours. |
| 5 | Water Supply Including Drinking Water Facilities A overhead water tank of 1.00 lac capacity water tank will be constructed. The water from there will be delivered through underground PVC pipe line |
| 6 | Sewer System A sewage will be collected through RCC Hume Pipe arrangement and inspection chambers leading to the STP tank of the project, from where the sewage will be disposed off. |
| 7 | Drain Surface drain will be laid on lean concrete bed on compacted earth in required size with brick work and 1¦4 plaster over it. |
| 8 | Parks Lush green park will be maintained in the project as per approved plan by Meerut Development Authority. The parks will have footbaths, sitting area and small play area for kids. |
| 9 | Tree Planting The trees will be planted at all suitable locations of the project, The tree selections will be done to ensure no hindrances in services in future. |
| 10 | Design For Electric Supply Including Street Lighting Electric Layout and capacity will be installed to suffice the domestic use of the project. The load sanctions will be taken from the electric department. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP based on blanket reactor system with air pumps for aeration system and hypochlorite solution with chemical catalyst system and after making sluge clean it will be pump to filter and then will be disposed. |
| 13 | Solid Waste Management And Disposal System Area for solid waste shall be provided as per MDA approved drawing and showed in development plan. |
| 14 | Water Conservation System Rain water harvesting system will be constructed as per Meerut Development Authority. |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Fire protection and Fire Safety System shall be installed at all the crossings of Colony. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 21 Aug 2028.
Sanctioned by Meerut Development Authority · 1,00,918 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MDA/LD/22-23/1061 | 16 Aug 2023 | 21 Aug 2028 | 20 Aug 2030 | 31 Mar 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
46 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 371 | 3467 | Khasra |
| 376 | 3693 | Khasra |
| 376 | 527.62 | Khasra |
| 376 | 5866 | Khasra |
| 376 | 2462 | Khasra |
| 376 | 4924 | Khasra |
| 376 | 7387 | Khasra |
| 376 | 3165 | Khasra |
| 384 | 2038 | Khasra |
| 384 | 7134 | Khasra |
| 384 | 1019 | Khasra |
| 401 | 3910 | Khasra |
| 401 | 2500 | Khasra |
| 383 | 1110 | Khasra |
| 371 | 1733 | Khasra |
| 376 | 3693 | Khasra |
| 384 | 2039 | Khasra |
| 393 | 4603.20 | Khasra |
| 394 | 270 | Khasra |
| 394 | 1360 | Khasra |
| 449 | 8850 | Khasra |
| 449 | 13280 | Khasra |
| 449 | 6850 | Khasra |
| 450 | 760 | Khasra |
| 376 | 3693 | Khasra |
| 393-394-395-382 | 6142 | Khasra |
| Sale deed · 8391 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1858 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10257 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10606 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11797 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12972 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8788 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1857 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10255 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4143 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5029 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6998 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8496 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3959 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1763 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 749 of 214 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 749 of 2014 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 749 of 2014 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 9758 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7593 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4640 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 8780 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10394 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5131 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 3910 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2327 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2332 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 5130 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 00 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 379 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Sept 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Sept 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Sept 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Sept 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 1 Sept 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 1 Sept 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 1 Sept 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 1 Sept 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 1 Sept 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 15 Sept 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Sept 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Sept 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 9 Oct 2023 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RENUKA BUILDTECH PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM254409 |
| PAN | AAFCR5900A |
| CIN / TAN | MRTR03670C |
| Name of chairman | Atul Gupta |
| Registered address | A-312, MEERUT MALL, DELHI ROAD, MEERUT |
| RERA contact | |
| Registered since | 2023 |
| Legal name | CITI ASIA HOTELS INDIA PVT. LTD. |
| Role | Co-promoter |
| Applicant type | Company |
| Address | A-312, Meerut Mall, Delhi Road, Meerut |
| RERA contact |
| Legal name | AYUSH GUPTA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | A-310, Meerut Mall , Delhi Road, Meerut |
| RERA contact |
| Legal name | AAVEG GARG |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 228, Shivaji Road, Meerut |
| RERA contact |
| Legal name | ACHAL GARG |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 228, SHIVAJI ROAD, MEERUT |
| RERA contact |
| Legal name | ASHUTOSH GARG |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 228, DEV SHREE OPP. SHANKAR ASHRAM, MEERUT |
| RERA contact |
| Legal name | A.I.ASSOCIATES |
| Role | Co-promoter |
| Applicant type | Partnership Firm |
| Address | A-310, Meerut Mall, Delhi Road, Meerut |
| RERA contact |
| Legal name | CITI ASIA ASSOCIATES |
| Role | Co-promoter |
| Applicant type | Partnership Firm |
| Address | A-310, Meerut Mall, Delhi Road, Meerut |
| RERA contact |
| Legal name | KULDEEP SINGH LAMBA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | Bunglaw No. 9, Sunder Nagar, Pandara Road, Central Delhi |
| RERA contact |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | RENUKA BUILDTECH PRIVATE LIMITED COLLECTION ACCOUNT FOR APEX NORTH CITYBankAXIS BANK LIMITEDBranchFOOTBALL CHOWKBranch addressFOOTBALL CHOWK MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCUTIB0002931 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | RENUKA BUILDTECH PRIVATE LIMITED SEPERATE ACCOUNT FOR APEX NORTH CITYBankAXIS BANK LIMITEDBranchFOOTBALL CHOWKBranch addressFOOTBALL CHOWK MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCUTIB0002931 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | RENUKA BUILDTECH PRIVATE LIMITED TRANSACTION ACCOUNT FOR APEX NORTH CITYBankAXIS BANK LIMITEDBranchFOOTBALL CHOWKBranch addressFOOTBALL CHOWK MEERUTBranch districtUttar PradeshA/C no.IFSCUTIB0002931 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about APEX NORTH CITY
Is APEX NORTH CITY RERA registered?
Yes. APEX NORTH CITY is registered with UPRERA under registration number UPRERAPRJ291313, registered on 28 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for APEX NORTH CITY?
The completion date filed with UPRERA is 31 Mar 2026. No completion certificate is on record yet.
Who is the builder of APEX NORTH CITY?
RENUKA BUILDTECH PVT. LTD. is the promoter entity that filed APEX NORTH CITY with UPRERA (promoter RERA ID UPRERAPRM254409). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does APEX NORTH CITY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is APEX NORTH CITY located?
APEX NORTH CITY is registered in Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗