Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut

UPRERARegistered

Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Meerut (RERA ID UPRERAPRJ292228). Registered with a completion deadline of 1 Sept 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ292228
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Sept 2022
Project duration37 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1225

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2022
Original completion1 Sept 2025
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Nov 2025
Registration fee₹37,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors624 · 13 · 7 (units from plan)
ConfigurationUnitsCarpet area
1 BHK62423
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK74823
2 · 1 BHK74823
3 · 1 BHK74823
4 · 1 BHK74823
5 · 1 BHK74823
6 · 1 BHK74823
7 · 1 BHK74823
8 · 1 BHK74823
9 · 1 BHK74823
10 · 1 BHK74823
11 · 1 BHK74823
12 · 1 BHK74823
13 · 1 BHK74823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Dev
License CA/97/22345
Architect Planning Unit-5, Nilgiri Complex, Indira Nagar, Lucknow
Engineer
M.B. Kaushik
Office of the Executive Engineer, C.D. Meerut-01, Office Complex, Sector-9, Shastri Nagar, Meerut
Contractor
UP AVAS EVAM VIKAS PARISHAD
104, Mahatma Gandhi Marg, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved Layout Plan
2Boundary Wall
Not Provided
3Road Work
Granular Sub base with Graded Stone ballast 12.50cm thick Wet Mix Macadam 10.00cm thick GSB 4.00cm thick BM and 2.5cm thick Bituminous Concrete
4Footpaths
Not Provided
5Water Supply Including Drinking Water Facilities
Water supply distribution system through Sectorial OHT PVC Pipes 110mm outer dia, 6kg per sqcm as per design
6Sewer System
250mm dia NP-2 RCC Hume Pipe laid with manhole and sewer connecting chamber which shall be connected with trunk sewer line already laid along 45m road as shown in Layout Plan
7Drain
Drain section 20cm x 18cm provided by brick work in proportional 1 times cement and 6 times coarse sand mortar with struck and flush pointing
8Parks
Not Provided
9Tree Planting
Not Provided
10Design For Electric Supply Including Street Lighting
11 KV HT line Steel Tubular Pole SP 55, 11m long, LT Lines PCC pole 8.5m long, Street Light on 7.5m/9m height Octagonal Pole Street Light connected with 33/11 KV Sub Station already running at Sector-3, Jagriti Vihar (Ext.), Meerut
11Community Buildings
Not Provided
12Treatment and Disposal System of Sewage and Sullage water
Sewer line shall be connected in Sewerage treatment plan already running along 45m wide road as shown in Layout Plan
13Solid Waste Management And Disposal System
Not Provided
14Water Conservation System
Not Provided
15Energy Management System Including Use of Renewable Energy
Not Provided
16Fire Protection And Fire Safety System
Fire Extinguisher ISI marked 4Kg and 6Kg capacity, CO2 Type fire extinguisher ISI marked 2Kg and 4Kg capacity with fire hose cabinet box of 18 gauge shall
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Provided
18Emergency Evacuation Services
Not Provided
19Other Miscellaneous Work
Not Provided
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 3 Jun 2025.

Sanctioned by U.P. Awas Evam Vikas Parishad · 6,325 sqm of land · an approved plan of 13 blocks and 624 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
12254 Jun 20203 Jun 20253 Jun 20251 Sept 2025
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
143, 144, 146/1, 146/212390Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 1398
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Jul 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 May 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 May 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New9 May 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New9 May 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Jul 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Jul 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Jul 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New9 May 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 May 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Jul 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 May 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New9 May 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New20 Jul 2022 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2025-Q2.

QuarterConstructionCertificates
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2—Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP Jagriti Vihar(Extension), Scheme No. 11, Sector-08A, Meerut PMAY Collection AccountBankHDFC bankBranchMeerut BranchBranch address381, Western kachehari Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0000285
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP Jagriti Vihar (Extension), Scheme No. 11, Sector-08A, Meerut PMAY Separate AccountBankHDFC bankBranchMeerut BranchBranch address381, Western Kachehari Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0000285
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP jagriti Vihar (Extension) Scheme No. 11, Sector-08A, Meerut PMAY Transaction AccountBankHDFC BankBranchMeerut BranchBranch address381, Western Kachehari Road, MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0000285
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut

Is Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut RERA registered?

Yes. Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut is registered with UPRERA under registration number UPRERAPRJ292228, registered on 27 Jul 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut been completed?

UPRERA still lists Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut as Registered, so it is not shown as completed here. A completion certificate dated 29 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut located?

Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut is registered in Meerut, as filed with UPRERA.

What configurations are available in Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut?

The approved unit plan describes 13 blocks and 624 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of EWS Houses under PMAY Project at Sector-8A in Scheme No. 11, Jagriti Vihar (Ext.), Meerut?

About 399 units per acre: 624 planned units across 1.56 acres (6,325 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗