ARIHANT ABODE is a RERA-registered residential project by PROSPER BUILDTECH PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ15792). Registered with a completion deadline of 18 May 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ15792 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 18 Apr 2018 |
| Project duration | 98 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | 602, 6TH FLOOR, SACHDEVA CORPORATE TOWER, COMMUNITY CENTER, KARKARDOOMA, DELHI - 110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
PLG/BP3719/FTSNO7759
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion certificate filed
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
3 completion certificates filed
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 24 Apr 2018 |
| Original completion | 20 Nov 2024 |
| Revised completion | 18 May 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 28 Dec 2023 |
| Registration fee | ₹1,06,500 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK643 66%
- 2 BHK300 31%
- SHOP37 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 300 | 50 |
| 3 BHK | 643 | 60-60 |
| SHOP | 37 | 4-19 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| COMMERCIAL · SHOP | 1 | 37 | 4-19 |
| TOWER A · 2 BHK, 3 BHK | 20 | 80 | 50-60 |
| TOWER B · 3 BHK, 2 BHK | 20 | 80 | 50-60 |
| TOWER C · 3 BHK, 2 BHK | 20 | 80 | 50-60 |
| TOWER D · 3 BHK, 2 BHK | 22 | 87 | 50-60 |
| TOWER E · 2 BHK, 3 BHK | 22 | 88 | 50-60 |
| TOWER F · 2 BHK, 3 BHK | 22 | 88 | 50-60 |
| TOWER G · 3 BHK, 2 BHK | 22 | 88 | 50-60 |
| TOWER H · 2 BHK, 3 BHK | 22 | 88 | 50-60 |
| TOWER I · 3 BHK, 2 BHK | 22 | 88 | 50-60 |
| TOWER J · 2 BHK, 3 BHK | 22 | 88 | 50-60 |
| TOWER K · 2 BHK, 3 BHK | 22 | 88 | 50-60 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per lease plan |
| 2 | Boundary Wall Brick work and permanent furnishing on boundary wall |
| 3 | Road Work Cement concrete road with laying of pavers on top |
| 4 | Footpaths R.C.C and as per landscape architect plan |
| 5 | Water Supply Including Drinking Water Facilities underground tank of adequate capacity, overhead tanks in each tower, drinking water supply by GNIDA and as per M.E.P consultant |
| 6 | Sewer System Design sewer system with hume pipes and as per M.E.P consultant |
| 7 | Drain Drain system as per M.E.P consultant drawing |
| 8 | Parks As per landscape consultant |
| 9 | Tree Planting Sufficient plantation as per landscape consultant |
| 10 | Design For Electric Supply Including Street Lighting As per consultant drawing uploaded & services approved by M.E.P consultant |
| 11 | Community Buildings Club house as per plan |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP provided as per EC norms and M.E.P consultant |
| 13 | Solid Waste Management And Disposal System As per consultant drawing sewerage system planned garbage recycle machine as per M.E.P consultant |
| 14 | Water Conservation System Rain water harvesting pits as per drawing issued by the consultant |
| 15 | Energy Management System Including Use of Renewable Energy Led light in common area |
| 16 | Fire Protection And Fire Safety System Manual fire alarm system as per N.B.C and as per provisional sanction |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Amphitheatre ,club, swimming pool etc. |
| 18 | Emergency Evacuation Services Staircase in each tower as per sanction plan |
| 19 | Other Miscellaneous Work Commercial space within complex |
Registered agents
11 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 3 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 4 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 5 | PROPFOLIO PRIVATE LIMITED | UPRERAAGT10358 |
| 6 | PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED) | UPRERAAGT10032 |
| 7 | RAMVEER SINGH CHAUHAN | UPRERAAGT13620 |
| 8 | RELIOBRIX CONSULTING PRIVATE LIMITED | UPRERAAGT10049 |
| 9 | Sanjeev Mathur | UPRERAAGT14071 |
| 10 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 11 | TRUHOMES REALTY | UPRERAAGT10997 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 17 Nov 2022. 1 of them carries a revalidation, valid to 17 Nov 2027.
Sanctioned by Greater Noida Authority · 20,240 sqm of land · an approved plan of 12 blocks and 980 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/BP3719/FTSNO7759 | 17 Nov 2017 | 17 Nov 2022 | 16 Nov 2025 | 20 Nov 2024 | — | |
| PLG/BP3719/FTSNO7759 | 17 Nov 2017 | 17 Nov 2022 | 17 Nov 2032 | 19 May 2025 | 17 Nov 2017 valid to 17 Nov 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 18 May 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 20 Nov 2024 | 19 May 2025 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 19 May 2025 | 18 May 2026 | — |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-04B, SECTOR 10, GREATER NOIDA WEST | 20240 SMT | — |
| GH-4B, Sector-10, Greater Noida West | 20240 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 28 Oct 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 23111 | 28 Oct 2015 | self | — |
| Registry document · 23111 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 26 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 26 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Sept 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Sept 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Sept 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 24 Apr 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 24 Apr 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 26 Apr 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 28 Apr 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 28 Apr 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Apr 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | DOMESTIC WATER TANK OF ADEQUATE CAPACITY AT UNDER GROUNF AND OVERHEADS TANKS WILL BE PROVIDED |
| Fire safety (as filed with RERA) | AS PER NBC |
| Health service | AS PER PLAN |
| Renewable energy | LED LIGHTS |
| Other facilities | CLUB HOUSE |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 86.22% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 88.19% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 92.07% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 95.73% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PROSPER BUILDTECH PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5392 |
| PAN | AAHCP7244D |
| CIN / TAN | U70102DL2013PTC259143 |
| Name of chairman | KAUSHAL JAIN |
| Registered address | 602, 6TH FLOOR, SACHDEVA CORPORATE TOWER, COMMUNITY CENTER, KARKARDOOMA, DELHI - 110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | PROSPER BUILDTECH PVT LTD MASTER RERA ESBankHDFC BANK LTD.BranchROYAL NEST NOIDA EXTENSION, U.P.Branch addressHDFC BANK LTD, SHOP NO 7 TO 9, GROUND FLOOR, ROYAL NEST APARTMENTS, TECHZONE 4, GREATER NOIDA, GAUTAM BUDHHA NAGAR, UTTAR PRADESH - 201307, BRANCH CODE 11304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0011304Branch emailSurya.tyagi at the rate of hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | PROSPER BUILDTECH PVT LTD RERA PROJECT SBankHDFC BANK LTD.BranchROYAL NEST NOIDA EXTENSION, U.P.Branch addressHDFC BANK LTD, SHOP NO. 7 TO 9, GROUND FLOOR, ROYAL NEST APARTMENTS, TECHZONE 4, GREATER NOIDA, GAUTAM BUDDHA NAGAR, UTTAR PRADESH - 201307, BRANCH CODE 11304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0011304Branch emailSurya.tyagi at the rate of hdfcbank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | PROSPER BUILDTECH PVT LTD ESCROW A/CBankHDFC BANK LTD.BranchROYAL NEST NOIDA EXTENSION, U.P.Branch addressHDFC BANK LTD, SHOP NO. 7 TO 9, GROUND FLOOR, ROYAL NEST APARTMENTS, TECHZONE 4, GREATER NOIDA, GAUTAM BUDDHA NAGAR, UTTAR PRADESH - 201307, BRANCH CODE 11304Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0011304Branch emailSurya.tyagi at the rate of hdfcbank.com |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.Common questions about ARIHANT ABODE
Is ARIHANT ABODE RERA registered?
Yes. ARIHANT ABODE is registered with UPRERA under registration number UPRERAPRJ15792, registered on 24 Apr 2018. Estanzo reproduces that filing; it does not verify the work behind it.
Has ARIHANT ABODE been completed?
UPRERA still lists ARIHANT ABODE as Registered, so it is not shown as completed here. A completion certificate dated 28 Dec 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of ARIHANT ABODE?
PROSPER BUILDTECH PRIVATE LIMITED is the promoter entity that filed ARIHANT ABODE with UPRERA (promoter RERA ID UPRERAPRM5392). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted ARIHANT ABODE more time to complete?
UPRERA's record carries 2 completion extensions for ARIHANT ABODE, the latest running to 18 May 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does ARIHANT ABODE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ARIHANT ABODE located?
ARIHANT ABODE is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in ARIHANT ABODE?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in ARIHANT ABODE?
The approved unit plan filed with UPRERA runs from 4 to 60 m² of carpet area (about 43 to 645 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in ARIHANT ABODE?
The approved unit plan describes 12 blocks and 980 units of which 943 are homes and 37 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is ARIHANT ABODE?
About 196 units per acre: 980 planned units across 5.00 acres (20,240 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗