Skytech Colours Avenue (Towers A-B-D-E & shops) is a RERA-registered residential project by Jatasya promoters Pvt ltd in Gautam Budh Nagar (RERA ID UPRERAPRJ6664). Registered with a completion deadline of 20 Aug 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6664 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 10 Jun 2015 |
| Original start | 10 Jun 2015 |
| Project duration | 159 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | 385 kohat Enclave Pitam pura Delhi |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (3)
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 10 Oct 2020 |
| Revised completion | 20 Aug 2028 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹65,500 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK290 66%
- 2 BHK148 34%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 290 | 63-73 |
| 2 BHK | 148 | 47-53 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A,B · 3 BHK, 2 BHK | 1 | 217 | 47-67 |
| A,B,D,E · OTHER | 1 | 0 | — |
| D,E · 2 BHK, 3 BHK | 1 | 221 | 53-73 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots completed |
| 2 | Boundary Wall completed |
| 3 | Road Work inner roads shall be provided |
| 4 | Footpaths shall be provided |
| 5 | Water Supply Including Drinking Water Facilities shall be provided |
| 6 | Sewer System shall be provided |
| 7 | Drain shall be provided |
| 8 | Parks Green area shall be provided |
| 9 | Tree Planting Green area shall be provided |
| 10 | Design For Electric Supply Including Street Lighting Boundary lights shall be provided |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP sysytem shall be provided |
| 13 | Solid Waste Management And Disposal System shall be provided |
| 14 | Water Conservation System As per the requirement |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System shall be provided |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Gym/Club and commercial area shall be provided |
| 18 | Emergency Evacuation Services Fire Exit |
| 19 | Other Miscellaneous Work As and when required |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 20 May 2018. All 3 carry a revalidation, the latest valid to 22 Aug 2028.
Sanctioned by Greater Noida Authority · 12,092 sqm of land · an approved plan of 3 blocks and 438 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| BP-3147/44/OPA-3113 | 20 May 2013 | 20 May 2018 | 20 May 2023 | 10 Oct 2020 | 20 May 2013 valid to 20 May 2023 | |
| BP-3147/44/OPA-3113 | 20 May 2013 | 20 May 2018 | 22 Aug 2028 | 7 Jul 2023 | 20 May 2013 valid to 22 Aug 2028 | |
| BP-3147/44/OPA-3113 | 20 May 2013 | 20 May 2018 | 22 Aug 2028 | 30 Dec 2025 | 20 May 2013 valid to 22 Aug 2028 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 5 completion extensions for this project, the latest running to 20 Aug 2028.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 10 Oct 2020 | 9 Apr 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 9 Apr 2021 | 8 Jan 2023 | — |
| 3 | 8 Jan 2023 | 7 Jul 2023 | — |
| 4 | 7 Jul 2023 | 30 Dec 2025 | — |
| 5 | 30 Dec 2025 | 20 Aug 2028 | — |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH/01C SEC 10 GR NOIDA WEST | 12092 | Plot |
| Lease deed · 20100 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 20100 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 31 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 31 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 31 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 31 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 69.5% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 70% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 73% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Jatasya promoters Pvt ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM12490 |
| PAN | AACCJ9143N |
| CIN / TAN | U70200DL2012PTC240599 |
| Name of chairman | Mayank Chawla |
| Registered address | 385 kohat Enclave Pitam pura Delhi |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | JPPL Collection Account For Skytech Colours AvenueBankHDFC BANKBranch88, Ansals Arcade, Sector 18, Noida,Uttar Pradesh 201301Branch addressAnsal's Fortune Arcade,K- Block,Sector 18,Uttar Pradesh 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | JPPL SEPARATE BANK ACCOUNT FOR SKYTECH COLOURS AVENUEBankHDFC BANKBranch88, Ansals Arcade, Sector 18, Noida,Uttar Pradesh 201301Branch addressAnsal's Fortune Arcade,K- Block,Sector 18,Uttar Pradesh 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | JPPL Rera Transaction Account For Skytech Colours AvenueBankHDFC BANKBranch88, Ansals Arcade, Sector 18, Noida,Uttar Pradesh 201301Branch addressAnsal's Fortune Arcade,K- Block,Sector 18,Uttar Pradesh 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0000088 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 80 (Under Registration - 3 ) → 80 (Under Registration - 0 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 79 (Under Registration - 2 ) → 80 (Under Registration - 3 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 77 (Under Registration - 0 ) → 79 (Under Registration - 2 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 21 Sept 2026 · 3 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Skytech Colours Avenue (Towers A-B-D-E & shops)
Is Skytech Colours Avenue (Towers A-B-D-E & shops) RERA registered?
Yes. Skytech Colours Avenue (Towers A-B-D-E & shops) is registered with UPRERA under registration number UPRERAPRJ6664, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Skytech Colours Avenue (Towers A-B-D-E & shops)?
The completion date filed with UPRERA is 20 Aug 2028. No completion certificate is on record yet.
Who is the builder of Skytech Colours Avenue (Towers A-B-D-E & shops)?
Jatasya promoters Pvt ltd is the promoter entity that filed Skytech Colours Avenue (Towers A-B-D-E & shops) with UPRERA (promoter RERA ID UPRERAPRM12490). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Skytech Colours Avenue (Towers A-B-D-E & shops) more time to complete?
UPRERA's record carries 5 completion extensions for Skytech Colours Avenue (Towers A-B-D-E & shops), the latest running to 20 Aug 2028. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Skytech Colours Avenue (Towers A-B-D-E & shops) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Skytech Colours Avenue (Towers A-B-D-E & shops) located?
Skytech Colours Avenue (Towers A-B-D-E & shops) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Skytech Colours Avenue (Towers A-B-D-E & shops)?
The unit plan filed with UPRERA lists OTHER, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Skytech Colours Avenue (Towers A-B-D-E & shops)?
The approved unit plan filed with UPRERA runs from 47 to 73 m² of carpet area (about 502 to 785 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Skytech Colours Avenue (Towers A-B-D-E & shops)?
The approved unit plan describes 3 blocks and 438 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Skytech Colours Avenue (Towers A-B-D-E & shops)?
About 147 units per acre: 438 planned units across 2.99 acres (12,092 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗