ARSH ENCLAVE is a RERA-registered residential project by AARYAVISION VENTURES PRIVATE LIMITED in Jabrauli, Lucknow (RERA ID UPRERAPRJ259362). Registered with a completion deadline of 31 Aug 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ259362 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 1 Oct 2024 |
| Project duration | 35 months |
| Address | Jabrauli , Raebareli Road Tehsil-Mohanlalganj, Jabrauli, Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | 201a=A 2ND FLOOR FELIX SQUARE SUSHANT GOLF CITY ANSAL IBB-2, LUCKNOW UP 226030 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
564
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Jan 2025 |
| Original completion | 31 Aug 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,00,000 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The plots available for sale are clearly and accurately demarcted on site ensuring transparency in boundary identification and layout. |
| 2 | Boundary Wall A 2.1 meter high cemented boundary wall is planned for construction to ensure enhanced security, privacy and well defined perimeter for the property. |
| 3 | Road Work The Development plan includes the construction of well-designed 12 meter and 9 meter-wide roads with durable blacktop surfacing. |
| 4 | Footpaths N/A |
| 5 | Water Supply Including Drinking Water Facilities To ensure a reliable and efficient drinking water supply, we will construct a basement water tank located beneath the parks , complemented by an underground pipline network. |
| 6 | Sewer System All sewage water will be directed to the Sewage Treatment Tank (STT) developed on site . Any overflow from the STT will be connected to the Municipal sewerage system, ensuring proper waste managment and environmental complince. |
| 7 | Drain All the Drainage water will also directed to the on site sewage Treatment Tank (STT) , ensuring comprehensive waste and water management within the project . |
| 8 | Parks We will develop a 2840 sq meter park featuring green landscaping and multi- purpose spaces . This Park will includes various plants and is designed to offer a versatile recreational area for residents to enjoy . |
| 9 | Tree Planting We will plant evergreen trees and plants ranging from 1 meter to 4 meter in height along all roads enhancing the aesthetic appeal and providing year round greenery . |
| 10 | Design For Electric Supply Including Street Lighting We will design and implement the lighting system according to the guidelines provided by the local electricity board . For external areas, LED Lights will be used due to their energy efficiency , long lifespan and effective illumination. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water N/A |
| 13 | Solid Waste Management And Disposal System THE SOLID WASTE GENERATED FROM THE SITE WILL BE MAINLY OF DOMESTIC NATAURE. IT WILL BE CLASSIFIED INTO BIO AND NON BIO--DEGRADABLE AND ACCORDINGLY DISPOSED OFF. |
| 14 | Water Conservation System N/A |
| 15 | Energy Management System Including Use of Renewable Energy We will install LED light fittings in external areas to ensure efficient and long lasting illumination. Additionally, we recommend individuals consider using solar panels to promote sustainable energy usage and educe dependence on conventinal electricity sources. |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work N/A |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | MAYANK VERMA | UPRERAAGT25148 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 19 Sept 2027.
Sanctioned by Any Other Competent Authority · 18,959 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 564 | 20 Sept 2024 | 19 Sept 2027 | 18 Sept 2028 | 31 Aug 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
26 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 2499 | 3790 | Khasra |
| 2519 | 1410 | Khasra |
| 2499 | 1270 | Khasra |
| 2500/2501 | 855 | Khasra |
| 2500/2501 | 855 | Khasra |
| 2502/2505/2508/2518KA | 2410 | Khasra |
| 2504/2509 | 1710 | Khasra |
| 2517 | 5370 | Khasra |
| 2522 | 1289 | Khasra |
| Registry document · 2499 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2519 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2499 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2500/2501 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2500/2501 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2502/2505/2508/2518KA The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2504/2509 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2517 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2522 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 2 Nov 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 7 Oct 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 9 Dec 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 2 Nov 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 9 Dec 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 9 Dec 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 9 Dec 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 9 Dec 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 9 Oct 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 23 Dec 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 9 Dec 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 9 Dec 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 2 Nov 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 9 Dec 2024 ↗ |
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 92.92% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 96% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 96.67% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | AARYAVISION VENTURES PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM322652 |
| PAN | AAOCA7891E |
| CIN / TAN | LKNA10716G |
| Name of chairman | ARUN PANDEY |
| Registered address | 201a=A 2ND FLOOR FELIX SQUARE SUSHANT GOLF CITY ANSAL IBB-2, LUCKNOW UP 226030 |
| RERA contact | |
| Registered since | 2024 |
| Legal name | ARUN PANDEY |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 201A, felix Square, 2nd Floor , Aarya Group , Sushant Golf City , Lucknow UP-226030 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | AARYAVISION VENTURES PVT LTD-COLL A/C-ARSH ENCLAVEBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6-A WAY ROAD, GOKHALE MARG, LUCKNOWBranch districtLucknowA/C no.IFSCSBIN0004166Branch emailsbi.04166@SBI.CO.IN |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | AARYAVISION VENTURES PVT LTD-SEP A/C-ARSH ENCLAVEBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6-A WAY ROAD GOKHALE MARG LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | AARYAVISION VENTURES PVT LTD-TRANS A/C-ARSH ENCLAVEBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH LUCKNOWBranch address6-A WAY ROAD GOKHALE MARG LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ARSH ENCLAVE
Is ARSH ENCLAVE RERA registered?
Yes. ARSH ENCLAVE is registered with UPRERA under registration number UPRERAPRJ259362, registered on 25 Jan 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ARSH ENCLAVE?
The completion date filed with UPRERA is 31 Aug 2027. No completion certificate is on record yet.
Who is the builder of ARSH ENCLAVE?
AARYAVISION VENTURES PRIVATE LIMITED is the promoter entity that filed ARSH ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM322652). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ARSH ENCLAVE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ARSH ENCLAVE located?
ARSH ENCLAVE is registered in Jabrauli, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗