Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).

UPRERARegistered

Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ398030). Registered with a completion deadline of 29 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
80.6%Q3'25
80.88%Q4'25
95.57%Q1'26
84.03%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ398030
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jul 2021
Project duration64 months
AddressMohanlalganj, Lucknow
TehsilMohanlalganj
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Permit revalidated (2)

  5. 2 building permits sanctioned

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Jul 2020
Original completion30 Jun 2025
Revised completion29 Oct 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹19,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors720 · 15 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK72023
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 1 BHK44823
2 · 1 BHK44823
3 · 1 BHK44823
4 · 1 BHK44823
5 · 1 BHK44823
6 · 1 BHK44823
7 · 1 BHK44823
8 · 1 BHK44823
9 · 1 BHK44823
10 · 1 BHK44823
11 · 1 BHK44823
12 · 1 BHK44823
13 · 1 BHK44823
14 · 1 BHK44823
15 · 1 BHK44823
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SANJEEV KASHYAP
License 2007-079/AITP
ARCHITECT AND PLANNING UNIT-4, UPAVP, LUCKNOW
Engineer
DR K NARAYAN
PROF. DEPT. OF CIVIL ENGINEERING INSTITUTE OF ENGINEERING AND TECHNOLOGY LUCKNOW 226002
Contractor
UP AVAS EVAM VIKAS PARISHAD
104, MAHATMA GANDHI MARG, LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER SANCTION LAYOUT PLAN DEMARCATION OF PLOTS WILL BE DONE BEFORE EXECUTION
2Boundary Wall
NO BOUNDARY WALL AS PER SANCTION LAYOUT PLAN
3Road Work
YES AS PER ENCLOSED LAYOUT PLAN INTERNAL ROAD WILL BE CONSTRUCTED BY UPAVP AS PER NORMS APPROVED AND TRUNK ROAD WILL CONSTRUCTED BY UPPWD AS PER GO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
4Footpaths
NO FOOTPATHS REQURIED ON INTERNAL ROAD
5Water Supply Including Drinking Water Facilities
YES INTERNAL DRINKING WATER WATER LINE WILL BE EXECUTED BY UPAVP AS PER SANCTIONED DESIGN AND EXTERNAL WATER LINE WILL BE EXECUTED BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
6Sewer System
YES AS PER SANCTIONED DESIGN SEWAGE SYSTEM WILL BE LAID BY UPAVP AND EXTERNAL SEWER LINE WILL BE LAID BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
7Drain
YES AS PER SANCTIONED DESIGN OPEN BRICK DRAIN WILL BE CONSTRUCTED BY UPAVP AND EXTERNAL DRAIN WILL BE CONSTRUCTED BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
8Parks
YES AS PER SANCTION LAYOUT PLAN PARKS WILL BE DEVELOPED BY PARISHAD ALSO PLANTATION.
9Tree Planting
YES AS PER SANCTION LAYOUT PLAN TREE PLANTATION WORK OF SELECTED VARIETIES.
10Design For Electric Supply Including Street Lighting
YES INTERNAL ELECTRIC SUPPLY WILL BE PROVIDED AS PER PARISHAD NORMS AND EXTERNAL ELECTRIC SUPPLY WILL BE PROVIDED BY UPPCL, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
11Community Buildings
COMMUNITY BUILDING LIKE HEALTH CENTER, SCHOOLS, ANGANBARIES ETC. WILL BE DONE BY CONCERNING DEPARTMENT AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
12Treatment and Disposal System of Sewage and Sullage water
YES FOR SEWAGE DISPOSAL INTERNAL SEWER LINE WILL BE CONSTRUCTED AS PER APPROVED LAYOUT AND EXTERNAL WILL BE DONE BY UP JAL NIGAM, LUCKNOW AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
13Solid Waste Management And Disposal System
WILL BE DONE BY UP JAL NIGAM, LUCKNOW AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018
14Water Conservation System
YET TO BE PLANNED
15Energy Management System Including Use of Renewable Energy
YET TO BE PLANNED
16Fire Protection And Fire Safety System
NO FIRE PROTECTION AND FIRE SYSTEM REQUIRED IN BUILDING WITH HEIGHT LESS THAN 15 MTR
17Social Infrastructure And Other Public Amenities Including Public Health Services
YES IN SANCTION LAYOUT PLAN COMMERCIAL POCKET ARE PROVIDED
18Emergency Evacuation Services
NOT REQUIRED IN BUILDING WITH HEIGHT LESS THAN 15 MTR
19Other Miscellaneous Work
YES WILL BE DONE AS PER SANCTION LAYOUT PLAN
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 20 Mar 2027. 2 of them carry a revalidation, the latest valid to 20 Mar 2027.

Sanctioned by U.P. Awas Evam Vikas Parishad · 7,769 sqm of land · an approved plan of 15 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/20189 Jun 202031 Dec 202531 Dec 202830 Jun 2025—
UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/202322 Mar 202320 Mar 202731 Dec 202830 Jun 202522 Mar 2023
UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/202322 Mar 202320 Mar 202731 Dec 202830 Jun 202622 Mar 2023
valid to 20 Mar 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Oct 2026.

#Granted fromExtended uptoNote
130 Jun 202529 Oct 2026—
230 Jun 202629 Oct 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

38 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1948980Khasra
19535790Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Jul 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Jul 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Jul 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Jul 2020 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New2 Jul 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Jul 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jul 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Jul 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Jul 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Jul 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Jul 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New2 Jul 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New2 Jul 2020 ↗

Quarterly progress reports

20 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

20 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2026-Q1.

QuarterConstructionCertificates
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q280.6%CA ↗ · Arch ↗ · Eng ↗
2025-Q380.88%CA ↗ · Arch ↗ · Eng ↗
2025-Q495.57%CA ↗ · Arch ↗ · Eng ↗
2026-Q184.03%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
UP AVAS EVAM VIKAS PARISHADBankHDFCBranchGomti NagarA/C no.IFSCHDFC0001112
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Revised completion date on file2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-06-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-06-30 → 2026-10-30
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 2
extension 2 to 2026-10-30
newly filed with RERA
5 Sept 2026
Filed document
viewprojects · 40
ENGINEERS CERTIFICATE
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 39
ARCHITECT CERTIFICATE
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 38
CA CERTIFICATE
newly filed with RERA
3 Sept 2026
Filed document
viewprojects · 37
Affidavit (Form-B)
newly filed with RERA
3 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).

Is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). RERA registered?

Yes. Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is registered with UPRERA under registration number UPRERAPRJ398030, registered on 14 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?

The completion date filed with UPRERA is 29 Oct 2026. No completion certificate is on record yet.

Who is the builder of Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). more time to complete?

UPRERA's record carries 2 completion extensions for Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2)., the latest running to 29 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). located?

Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is registered in Lucknow, as filed with UPRERA.

What configurations are available in Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?

The approved unit plan describes 15 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?

About 375 units per acre: 720 planned units across 1.92 acres (7,769 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗