Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).
Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ398030). Registered with a completion deadline of 29 Oct 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ398030 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jul 2021 |
| Project duration | 64 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated (2)
2 building permits sanctioned
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Jul 2020 |
| Original completion | 30 Jun 2025 |
| Revised completion | 29 Oct 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹19,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 720 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · 1 BHK | 4 | 48 | 23 |
| 2 · 1 BHK | 4 | 48 | 23 |
| 3 · 1 BHK | 4 | 48 | 23 |
| 4 · 1 BHK | 4 | 48 | 23 |
| 5 · 1 BHK | 4 | 48 | 23 |
| 6 · 1 BHK | 4 | 48 | 23 |
| 7 · 1 BHK | 4 | 48 | 23 |
| 8 · 1 BHK | 4 | 48 | 23 |
| 9 · 1 BHK | 4 | 48 | 23 |
| 10 · 1 BHK | 4 | 48 | 23 |
| 11 · 1 BHK | 4 | 48 | 23 |
| 12 · 1 BHK | 4 | 48 | 23 |
| 13 · 1 BHK | 4 | 48 | 23 |
| 14 · 1 BHK | 4 | 48 | 23 |
| 15 · 1 BHK | 4 | 48 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots AS PER SANCTION LAYOUT PLAN DEMARCATION OF PLOTS WILL BE DONE BEFORE EXECUTION |
| 2 | Boundary Wall NO BOUNDARY WALL AS PER SANCTION LAYOUT PLAN |
| 3 | Road Work YES AS PER ENCLOSED LAYOUT PLAN INTERNAL ROAD WILL BE CONSTRUCTED BY UPAVP AS PER NORMS APPROVED AND TRUNK ROAD WILL CONSTRUCTED BY UPPWD AS PER GO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 4 | Footpaths NO FOOTPATHS REQURIED ON INTERNAL ROAD |
| 5 | Water Supply Including Drinking Water Facilities YES INTERNAL DRINKING WATER WATER LINE WILL BE EXECUTED BY UPAVP AS PER SANCTIONED DESIGN AND EXTERNAL WATER LINE WILL BE EXECUTED BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 6 | Sewer System YES AS PER SANCTIONED DESIGN SEWAGE SYSTEM WILL BE LAID BY UPAVP AND EXTERNAL SEWER LINE WILL BE LAID BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 7 | Drain YES AS PER SANCTIONED DESIGN OPEN BRICK DRAIN WILL BE CONSTRUCTED BY UPAVP AND EXTERNAL DRAIN WILL BE CONSTRUCTED BY UP JAL NIGAM, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 8 | Parks YES AS PER SANCTION LAYOUT PLAN PARKS WILL BE DEVELOPED BY PARISHAD ALSO PLANTATION. |
| 9 | Tree Planting YES AS PER SANCTION LAYOUT PLAN TREE PLANTATION WORK OF SELECTED VARIETIES. |
| 10 | Design For Electric Supply Including Street Lighting YES INTERNAL ELECTRIC SUPPLY WILL BE PROVIDED AS PER PARISHAD NORMS AND EXTERNAL ELECTRIC SUPPLY WILL BE PROVIDED BY UPPCL, LUCKNOW AS PER GO NO.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 11 | Community Buildings COMMUNITY BUILDING LIKE HEALTH CENTER, SCHOOLS, ANGANBARIES ETC. WILL BE DONE BY CONCERNING DEPARTMENT AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 12 | Treatment and Disposal System of Sewage and Sullage water YES FOR SEWAGE DISPOSAL INTERNAL SEWER LINE WILL BE CONSTRUCTED AS PER APPROVED LAYOUT AND EXTERNAL WILL BE DONE BY UP JAL NIGAM, LUCKNOW AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 13 | Solid Waste Management And Disposal System WILL BE DONE BY UP JAL NIGAM, LUCKNOW AS PER G.O.-1878/AATH-1-16-80/MISCELLANEOUS/2010 DATE-17.10.2018 |
| 14 | Water Conservation System YET TO BE PLANNED |
| 15 | Energy Management System Including Use of Renewable Energy YET TO BE PLANNED |
| 16 | Fire Protection And Fire Safety System NO FIRE PROTECTION AND FIRE SYSTEM REQUIRED IN BUILDING WITH HEIGHT LESS THAN 15 MTR |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services YES IN SANCTION LAYOUT PLAN COMMERCIAL POCKET ARE PROVIDED |
| 18 | Emergency Evacuation Services NOT REQUIRED IN BUILDING WITH HEIGHT LESS THAN 15 MTR |
| 19 | Other Miscellaneous Work YES WILL BE DONE AS PER SANCTION LAYOUT PLAN |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 20 Mar 2027. 2 of them carry a revalidation, the latest valid to 20 Mar 2027.
Sanctioned by U.P. Awas Evam Vikas Parishad · 7,769 sqm of land · an approved plan of 15 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018 | 9 Jun 2020 | 31 Dec 2025 | 31 Dec 2028 | 30 Jun 2025 | — | |
| UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/2023 | 22 Mar 2023 | 20 Mar 2027 | 31 Dec 2028 | 30 Jun 2025 | 22 Mar 2023 | |
| UPHDB/APD/UNIT6/PMAY/KANKAHA/LKO/CDLKO01/232/2023 | 22 Mar 2023 | 20 Mar 2027 | 31 Dec 2028 | 30 Jun 2026 | 22 Mar 2023 valid to 20 Mar 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Oct 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2025 | 29 Oct 2026 | — |
| 2 | 30 Jun 2026 | 29 Oct 2026 | Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026 |
Land & documents
38 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 194 | 8980 | Khasra |
| 195 | 35790 | Khasra |
| Khatauni extract · 1421-1426 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 2 Jul 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 2 Jul 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Jul 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 2 Jul 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 2 Jul 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 2 Jul 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Jul 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 2 Jul 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 2 Jul 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Jul 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 2 Jul 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 2 Jul 2020 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 80.6% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 80.88% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 95.57% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 84.03% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | UP AVAS EVAM VIKAS PARISHADBankHDFCBranchGomti NagarA/C no.IFSCHDFC0001112 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Revised completion date on file | 2026-10-30 → 2026-10-29 changed in Estanzo’s record | 7 Sept 2026 |
| Completion extension no. 2 — extended upto | 2026-10-30 → 2026-10-29 changed in Estanzo’s record | 7 Sept 2026 |
| Completion extension no. 1 — extended upto | 2026-06-30 → 2026-10-29 changed in Estanzo’s record | 7 Sept 2026 |
| Revised completion date on file | 2026-06-30 → 2026-10-30 changed in Estanzo’s record | 5 Sept 2026 |
| Completion extension no. 2 | extension 2 to 2026-10-30 newly filed with RERA | 5 Sept 2026 |
| Filed document viewprojects · 40 | ENGINEERS CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 39 | ARCHITECT CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 38 | CA CERTIFICATE newly filed with RERA | 3 Sept 2026 |
| Filed document viewprojects · 37 | Affidavit (Form-B) newly filed with RERA | 3 Sept 2026 |
| Revised completion date on file | changed in Estanzo’s record · 7 Sept 2026 · 2 movements on record |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).
Is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). RERA registered?
Yes. Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is registered with UPRERA under registration number UPRERAPRJ398030, registered on 14 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?
The completion date filed with UPRERA is 29 Oct 2026. No completion certificate is on record yet.
Who is the builder of Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). more time to complete?
UPRERA's record carries 2 completion extensions for Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2)., the latest running to 29 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). located?
Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2). is registered in Lucknow, as filed with UPRERA.
What configurations are available in Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?
The approved unit plan describes 15 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of EWS Houses (G+3 Floor) under PM AVAS YOJNA, at KANKAHA, MOHANLALGANJ, LUCKNOW (PHASE-2).?
About 375 units per acre: 720 planned units across 1.92 acres (7,769 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗