Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow
Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ542529). Registered with a completion deadline of 31 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ542529 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Apr 2019 |
| Project duration | 93 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
Permit revalidated
UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018
Building permit sanctioned
UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 20 Feb 2019 |
| Original completion | 31 Mar 2022 |
| Revised completion | 31 Dec 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹23,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 432 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 TO 9 · 1 BHK | 4 | 432 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow |
| 2 | Boundary Wall Not Proposed at present |
| 3 | Road Work Internal Road will constructed by UPAVP and trunk road will constructed by UPPWD as per GO.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 4 | Footpaths Not Proposed at present |
| 5 | Water Supply Including Drinking Water Facilities Internal Drinking water facility will be Provide by UPAVP and External Water facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 6 | Sewer System Internal Sewer facility will be Provide by UPAVP and External Sewer facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 7 | Drain Internal Drain facility will be Provide by UPAVP and External Drain facility will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 8 | Parks Will be Constructed by UPAVP, Lucknow. |
| 9 | Tree Planting Will be done by UPAVP, Lucknow. |
| 10 | Design For Electric Supply Including Street Lighting Internal Electric Supply and Street Lighting will be Provide by UPAVP and External Electric Supply and Street Lighting will be provide by UP JAL NIGAM, Lucknow as per GO No.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 11 | Community Buildings Community building like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 12 | Treatment and Disposal System of Sewage and Sullage water Will be done by UP Jal Nigarm, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 13 | Solid Waste Management And Disposal System Will be done by UP Jal Nigarm, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 14 | Water Conservation System Not Applicable |
| 15 | Energy Management System Including Use of Renewable Energy Will be done by UP Power Corporation, Lucknow as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 16 | Fire Protection And Fire Safety System As per NBC guidelines not required for G+3 building. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social Infrastructure like health center, Schools, Anganbaries etc. Will be done by concerning Department as per G.o.-1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
4 permits
An approval and the date it runs to - not proof the work matching it was done.
4 sanctioning permits are on record with UPRERA, the latest valid to 8 Oct 2027. 3 of them carry a revalidation, the latest valid to 10 Sept 2026.
Sanctioned by U.P. Awas Evam Vikas Parishad · 3,676 sqm of land · an approved plan of 1 block and 432 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018 | 11 Sept 2018 | 10 Sept 2023 | 10 Sept 2023 | 31 Mar 2022 | — | |
| UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018 | 11 Sept 2018 | 10 Sept 2023 | 9 Sept 2026 | 29 Mar 2024 | 11 Sept 2018 valid to 9 Sept 2026 | |
| UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018 | 11 Sept 2018 | 10 Sept 2023 | 10 Sept 2026 | 29 Mar 2024 | 11 Sept 2018 valid to 10 Sept 2026 | |
| UPHDB/APD/UN-4/PMAY/CD-11/KANKAHA/189/2018 | 9 Oct 2025 | 8 Oct 2027 | 8 Oct 2027 | 29 Nov 2025 | 9 Oct 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 4 completion extensions for this project, the latest running to 31 Dec 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Mar 2022 | 30 Sept 2022 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Sept 2022 | 29 Mar 2024 | — |
| 3 | 29 Mar 2024 | 29 Nov 2025 | — |
| 4 | 29 Nov 2025 | 31 Dec 2026 | — |
Land & documents
27 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 194 | 8980 | Khasra |
| 195 | 35790 | Khasra |
| Khatauni extract · 1421-1426 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Feb 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Jan 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Feb 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Feb 2019 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 7 Feb 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Feb 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Feb 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Feb 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Feb 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Feb 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 8 Feb 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 7 Feb 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 7 Feb 2019 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 97.7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 97.7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 98.82% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 97.96% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | E.E. CD-XIBankHDFC BANKBranchSARDAR PATEL DENTAL COLLEGE TELIBAGH RAIBAREILLY ROAD LUCKNOWA/C no.IFSCHDFC0004768 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow
Is Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow RERA registered?
Yes. Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow is registered with UPRERA under registration number UPRERAPRJ542529, registered on 20 Feb 2019. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow?
The completion date filed with UPRERA is 31 Dec 2026. No completion certificate is on record yet.
Who is the builder of Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow more time to complete?
UPRERA's record carries 4 completion extensions for Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow, the latest running to 31 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow located?
Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow is registered in Lucknow, as filed with UPRERA.
What configurations are available in Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow?
The approved unit plan describes 1 block and 432 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction of 432 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) At Kankaha, Mohanlalganj Lucknow?
About 476 units per acre: 432 planned units across 0.91 acres (3,676 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗