ASIA-PACIFIC RESIDENCY is a RERA-registered residential project by ASIA- PACIFIC CONSTRUCTION PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ9580). Registered with a completion deadline of 1 Feb 2021.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9580 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 6 Jan 2016 |
| Original start | 3 Aug 2015 |
| Project duration | 61 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | Registered Office Address - A-1, Pocket - A, Sarita Vihar New Delhi - 110076 Corporate Office Address - A-1, Pocket - A, Sarita Vihar New Delhi - 110076 Site Address - Near Arjunganj Vidyamandir Degree College, Arjunganj (Sultanpur Road) Lucknow - 226002 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
40218
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Aug 2017 |
| Original completion | 2 Aug 2020 |
| Revised completion | 1 Feb 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 8 Mar 2022 |
| Registration fee | ₹46,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Out of 48 villa project demarcation of 34 plots done |
| 2 | Boundary Wall Completed all around the project |
| 3 | Road Work 358.50 SQM road is remaining |
| 4 | Footpaths No Footpath is in the plan |
| 5 | Water Supply Including Drinking Water Facilities One boring is done for water supply. All water circuit line is completed |
| 6 | Sewer System All sewer line is made and connected with STP (60 KLD) capacity |
| 7 | Drain Drain line is completed and connected to sock-pit and discharge |
| 8 | Parks About 5000 SQM Park is remaining to develop |
| 9 | Tree Planting Remaining |
| 10 | Design For Electric Supply Including Street Lighting YES Done (Street lighting is pending) |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP (Sewage Plant) |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System Soak-pit |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services YES (Near Gathering Point) |
| 19 | Other Miscellaneous Work Fancing on Boundary Wall |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 2 Aug 2020.
Sanctioned by Lucknow Development Authority · 8,260 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 40218 | 12 Jul 2016 | 2 Aug 2020 | 2 Aug 2020 | 2 Aug 2020 |
| Document | File |
|---|---|
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 1 Feb 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 2 Aug 2020 | 1 Feb 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 576 | 4540 | — |
| 577 | 3720 | — |
| 576 | 4124.90 | Khasra |
| 577 | 3109.170 | Khasra |
| 576 | 415.100 | Khasra |
| 577 | 145.860 | Khasra |
| 577 | 173.250 | Khasra |
| 577 | 291.720 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 12 Dec 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 21172 | 12 Dec 2014 | self | — |
| Registry document · 21172 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14393 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14393 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14394 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14395 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 14398 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 16 Sept 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Sept 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 16 Sept 2020 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 11 Aug 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 11 Aug 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 11 Aug 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 11 Aug 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 11 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 11 Aug 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 11 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Health service | YES |
| Renewable energy | YES |
| Other facilities | PARK, STP PLANT |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2020-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ASIA- PACIFIC CONSTRUCTION PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM19272 |
| PAN | AALCA2734K |
| CIN / TAN | DELA33931C |
| Name of chairman | AMARENDRA KUMAR SRIVASTAVA |
| Registered address | Registered Office Address - A-1, Pocket - A, Sarita Vihar New Delhi - 110076 Corporate Office Address - A-1, Pocket - A, Sarita Vihar New Delhi - 110076 Site Address - Near Arjunganj Vidyamandir Degree College, Arjunganj (Sultanpur Road) Lucknow - 226002 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | IDIB000J033BankINDIAN BANKBranchINDIAN BANKA/C no.IFSCIDBI |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about ASIA-PACIFIC RESIDENCY
Is ASIA-PACIFIC RESIDENCY RERA registered?
Yes. ASIA-PACIFIC RESIDENCY is registered with UPRERA under registration number UPRERAPRJ9580, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has ASIA-PACIFIC RESIDENCY been completed?
UPRERA still lists ASIA-PACIFIC RESIDENCY as Registered, so it is not shown as completed here. A completion certificate dated 8 Mar 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of ASIA-PACIFIC RESIDENCY?
ASIA- PACIFIC CONSTRUCTION PRIVATE LIMITED is the promoter entity that filed ASIA-PACIFIC RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM19272). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted ASIA-PACIFIC RESIDENCY more time to complete?
UPRERA's record carries 1 completion extension for ASIA-PACIFIC RESIDENCY, the latest running to 1 Feb 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does ASIA-PACIFIC RESIDENCY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ASIA-PACIFIC RESIDENCY located?
ASIA-PACIFIC RESIDENCY is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗