GH4 PHASE 4(THE RESORT) is a RERA-registered residential project by Omaxe Limited in Lucknow (RERA ID UPRERAPRJ326163). Registered with a completion deadline of 31 Dec 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ326163 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2023 |
| Project duration | 72 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
GROUP HOUSING/05996/LDA/BP/21-22/3048/29082022
2 building permits sanctioned
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Dec 2022 |
| Original completion | 31 Dec 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹66,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK68 47%
- 4 BHK68 47%
- PENTHOUSE8 6%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 68 | 170 |
| PENTHOUSE | 8 | 349-403 |
| 4 BHK | 68 | 214 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower A1 · 3 BHK, PENTHOUSE | 20 | 34 | 170-349 |
| Tower A2 · 3 BHK, PENTHOUSE | 20 | 38 | 170-349 |
| Tower B1 · 4 BHK, PENTHOUSE | 20 | 36 | 214-403 |
| Tower B2 · 4 BHK, PENTHOUSE | 20 | 36 | 214-403 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of Plots completed at the site |
| 2 | Boundary Wall Boundar wall(Height approx 1500 from Road Level or as per design/requirement) will be constructed by brick work/MS Railing as per design by Promoter |
| 3 | Road Work Internal Drive way 9 mtr and 6 mtr wide as per approved plan will be constructed by RCC or as per requirement and designed by promoter |
| 4 | Footpaths Footpath width 600/900 mm, as per designed by promoter, will be developed by using pavers/stone as per requirements. |
| 5 | Water Supply Including Drinking Water Facilities 24 hr water supply including drinking water facilities will be provided by the promoter through submersible/OHT on terrace. |
| 6 | Sewer System S.T.P will be constructed by promoter at site for Sewer Disposal |
| 7 | Drain Covered Drainage system will be developed and connected with RWH and overflow will be connected with existing govt. drainage. |
| 8 | Parks Common Parks/Green area available for all GH-4. And will be developed as per approved plan and requirements. |
| 9 | Tree Planting Total 333 Trees required as per approved plan in GH-4 and same will be planted in common area/open area of the project GH-4 |
| 10 | Design For Electric Supply Including Street Lighting Electricity supply will be provided from ESS already constructed at Integrated Township |
| 11 | Community Buildings Community Buildings will be provided for GH- 4 project |
| 12 | Treatment and Disposal System of Sewage and Sullage water S.T.P. will be constructed at site and treated water will be use in flushing and irrigation |
| 13 | Solid Waste Management And Disposal System Solid Waste Management and Disposal System will be provided as per govt norms |
| 14 | Water Conservation System Water conservation system will be provided as per govt norms |
| 15 | Energy Management System Including Use of Renewable Energy Energy Management system i/c use of renewable energy will be provided as per govt norms |
| 16 | Fire Protection And Fire Safety System Fire NOC received and fire protection and fire safety system will be provided as per design and norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Common Social infrastructure and public amenities i/c Public health services will be provided in Integrated Township |
| 18 | Emergency Evacuation Services Fire Stair case will be provided as per Approved drawings. |
| 19 | Other Miscellaneous Work As per specification and approved map all work will be developed |
Registered agents
90 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | ABHINAV KHARE | UPRERAAGT14915 |
| 2 | ABHINEET GAUR | UPRERAAGT14935 |
| 3 | ABHISHEK KUMAR SINGH | UPRERAAGT15288 |
| 4 | Ajit Rai | UPRERAAGT11295 |
| 5 | Akansha Bansal | UPRERAAGT20837 |
| 6 | AKASH DEEP SRIVASTAVA | UPRERAAGT15712 |
| 7 | AMIT AGARWAL | UPRERAAGT11945 |
| 8 | Amit Khare | UPRERAAGT19477 |
| 9 | AMIT KUMAR NISHAD | UPRERAAGT14016 |
| 10 | Amit madan | UPRERAAGT19393 |
| 11 | Amit Misra | UPRERAAGT18676 |
| 12 | Anamika Mishra | UPRERAAGT16351 |
| 13 | ANAND KUMAR SHUKLA | UPRERAAGT10831 |
| 14 | ANURAG GUPTA | UPRERAAGT14504 |
| 15 | ANYA PROPERTIES | UPRERAAGT15969 |
| 16 | ARJUN SINGH YADAV | UPRERAAGT11879 |
| 17 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 18 | Ashish Tripathi | UPRERAAGT18925 |
| 19 | Balbir Singh | UPRERAAGT20260 |
| 20 | BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITED | UPRERAAGT14759 |
| 21 | BIPIN CHANDRA PANT | UPRERAAGT13687 |
| 22 | BRIXWELL REALTY & CONSTRUCTION LLP | UPRERAAGT15068 |
| 23 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 24 | DAIWIK REALTORS | UPRERAAGT12075 |
| 25 | Dev Real Estate and Finance | UPRERAAGT16776 |
| 26 | GOLDEN ESTATE | UPRERAAGT10397 |
| 27 | Hitesh Kesarwani | UPRERAAGT11538 |
| 28 | HITESH KHANNA | UPRERAAGT13833 |
| 29 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 30 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 31 | KHUSHBOO KUSHWAHA | UPRERAAGT19671 |
| 32 | KUMAR KESHAV | UPRERAAGT18972 |
| 33 | LINK PROPERTIES | UPRERAAGT10081 |
| 34 | LIPIKA CHATTERJEE | UPRERAAGT14888 |
| 35 | M.S. Property Consultants L.L.P. | UPRERAAGT10074 |
| 36 | manju tripathi | UPRERAAGT14947 |
| 37 | MARKANDEY SINGH | UPRERAAGT18928 |
| 38 | MOHD AFZAL | UPRERAAGT13830 |
| 39 | Mohd Atif Ali | UPRERAAGT17360 |
| 40 | MONISHA BUDHRAJA | UPRERAAGT16694 |
| 41 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 42 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 43 | Narendra Singh | UPRERAAGT14206 |
| 44 | Pankaj Mittal | UPRERAAGT13523 |
| 45 | PIXEL GLOBAL INFRA PRIVATE LIMITED | UPRERAAGT13936 |
| 46 | Prashant Gupta | UPRERAAGT19667 |
| 47 | Prem Prakash Khare | UPRERAAGT13677 |
| 48 | Priya Mishra | UPRERAAGT18717 |
| 49 | R K PROPERTIES | UPRERAAGT11201 |
| 50 | RADHE SHAYM | UPRERAAGT19129 |
| 51 | RADHESH CHANDRA | UPRERAAGT10484 |
| 52 | RAJEEV CHHOKER | UPRERAAGT19007 |
| 53 | RAJEEV KUMAR SHUKLA | UPRERAAGT13288 |
| 54 | Rajesh kumar | UPRERAAGT20162 |
| 55 | RAJNI NIGAM | UPRERAAGT10897 |
| 56 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 57 | Rishabh Saxena | UPRERAAGT13851 |
| 58 | S.R.Broker LLP | UPRERAAGT10051 |
| 59 | Sakshi Gupta | UPRERAAGT16025 |
| 60 | Sandeep Tripathi | UPRERAAGT12229 |
| 61 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 62 | Santosh Kumar Mishra C/O UNITEDWORLD PROPERTIES (P) LTD. | UPRERAAGT22197 |
| 63 | SATYAM SINGH | UPRERAAGT18865 |
| 64 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 65 | Shalini Verma | UPRERAAGT15031 |
| 66 | SHALINI WADHWA | UPRERAAGT15032 |
| 67 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 68 | SHRI RUDRA REAL ESTATES | UPRERAAGT14251 |
| 69 | shrikant upadhyay | UPRERAAGT15563 |
| 70 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 71 | SOURABH NIGAM | UPRERAAGT10900 |
| 72 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 73 | TARUN PREET SINGH SAHNI | UPRERAAGT12537 |
| 74 | TULSI REAL ESTATE | UPRERAAGT13187 |
| 75 | Tushar Chandani | UPRERAAGT12001 |
| 76 | Udai Associates | UPRERAAGT14663 |
| 77 | Unnisis Infrratech Private Limited | UPRERAAGT15300 |
| 78 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 79 | VANDANA SRIVASTAVA | UPRERAAGT18502 |
| 80 | Varun Properties Inc. | UPRERAAGT11985 |
| 81 | VELOCITY DEVELOPERS | UPRERAAGT10813 |
| 82 | Vikram singh | UPRERAAGT10860 |
| 83 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 84 | VINEET THAPAR | UPRERAAGT20835 |
| 85 | VINITA MISHRA | UPRERAAGT16506 |
| 86 | Vinod Dawra | UPRERAAGT19609 |
| 87 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
| 88 | VISHAL BAJPAI | UPRERAAGT11344 |
| 89 | VISHAL KUMAR | UPRERAAGT14798 |
| 90 | vishal srivastava | UPRERAAGT11982 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 21 Nov 2027. 1 of them carries a revalidation.
Sanctioned by Lucknow Development Authority · 12,175 sqm of land · an approved plan of 4 blocks and 144 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| LDA/BP/21-23-3048 | 22 Nov 2022 | 21 Nov 2027 | 21 Nov 2030 | 21 Nov 2030 | — | |
| GROUP HOUSING/05996/LDA/BP/21-22/3048/29082022 | 22 Nov 2022 | 21 Nov 2027 | 21 Nov 2030 | 31 Dec 2028 | 22 Nov 2022 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
22 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 457 | 8100 | Khasra |
| 458 | 3240 | Khasra |
| 450 | 4851 | Khasra |
| Sale deed · 9385 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1524 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 20645 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 314 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Land chart The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 19141 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 19141 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Nov 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Nov 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Nov 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Nov 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 Nov 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Nov 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Nov 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Nov 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Nov 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 9 Dec 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 9 Dec 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 9 Dec 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 Nov 2022 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 26.94% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 30.7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 34.46% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 37.77% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omaxe Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2386 |
| PAN | AAACO0171H |
| CIN / TAN | DELO01861G |
| Name of chairman | Mr. Rohtash Goel |
| Registered address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ADVAY PROPERTIES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | GROUND FLOOR, 22 OMAXE VALUE MALL AJNARA ROAD AMRITSAR Amritsar PB 143001 IN |
| RERA contact |
| Legal name | AGASTHYA PROPERTIES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Ground Floor,22,Omaxe Value mall, , , Ajnara Road, Amritsar, Punjab, 143101 |
| RERA contact |
| Legal name | AMOD BUILDERS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Ground Floor 22,,omaxe Value mall , Ajnara Road , Amritsar , 26-Punjab , 91-India , 143001 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | OMAXE SEPERATE ACCOUNT FOR GH-4 PHASE 4BankIDBI BANKBranchINDRA NAGARA/C no.IFSCIBKL0000277 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 4 ) → 225 (Under Registration - 4 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 5 ) → 224 (Under Registration - 4 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 4 ) → 224 (Under Registration - 5 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 5 ) → 223 (Under Registration - 4 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 220 (Under Registration - 3 ) → 223 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GH4 PHASE 4(THE RESORT)
Is GH4 PHASE 4(THE RESORT) RERA registered?
Yes. GH4 PHASE 4(THE RESORT) is registered with UPRERA under registration number UPRERAPRJ326163, registered on 28 Dec 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GH4 PHASE 4(THE RESORT)?
The completion date filed with UPRERA is 31 Dec 2028. No completion certificate is on record yet.
Who is the builder of GH4 PHASE 4(THE RESORT)?
Omaxe Limited is the promoter entity that filed GH4 PHASE 4(THE RESORT) with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GH4 PHASE 4(THE RESORT) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GH4 PHASE 4(THE RESORT) located?
GH4 PHASE 4(THE RESORT) is registered in Lucknow, as filed with UPRERA.
What configurations are available in GH4 PHASE 4(THE RESORT)?
The unit plan filed with UPRERA lists 3 BHK, PENTHOUSE and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GH4 PHASE 4(THE RESORT)?
The approved unit plan filed with UPRERA runs from 170 to 403 m² of carpet area (about 1,832 to 4,336 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GH4 PHASE 4(THE RESORT)?
The approved unit plan describes 4 blocks and 144 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GH4 PHASE 4(THE RESORT)?
About 48 units per acre: 144 planned units across 3.01 acres (12,175 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗