ATLAS is a RERA-registered residential project by INFRAEGIS CONSTRUCTIONS PRIVATE LIMITED in VILL-NOOR NAGAR, RAJ NAGAR, EXTENSION, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ900831). Registered with a completion deadline of 22 Aug 2032.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ900831 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Jul 2025 |
| Project duration | 86 months |
| Address | KHASRA NO 1048 & 1061 ( KHATA NO-01004), VILL-NOOR NAGAR, RAJ NAGAR, EXTENSION, GHAZIABAD, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | THE CORENTHUM TOWER, TOWER-B 6TH FLOOR, OFFICE NO. 46, SECTOR 62, Gautam Buddha Nagar, Noida, Uttar Pradesh, India, 201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
GROUP HOUSING/019018/GDA/BP-23-24/1564/17052025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Permit revalidated (2)
2 building permits sanctioned
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Aug 2025 |
| Original completion | 22 Aug 2032 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹68,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK344 92%
- 4 BHK22 6%
- SHOP9 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 344 | 86-134 |
| SHOP | 9 | 14-15 |
| 4 BHK | 22 | 142-142 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| ATLAS · 3 BHK, SHOP, 4 BHK, OTHER | 20 | 375 | 14-142 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots GROUP HOUSING AT KHASRA NO -1048, 1061( KHATA NO -01004), VILL-NOOR, RAJ NAGAR EXTTENSION, GHAZIABAD. DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTION MAP WITHPROPER SET BACKS |
| 2 | Boundary Wall 230MM WIDE AND 2.1 METRE HIGH EARTHQUAKE RESISTANT BOUNDARYWALL OF RCC/ MILD STEEL/BRICK FILLED. BOUNDARY WALL AT SITE WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER ATHAT TWO COAT OF PAINTS WILL BE COATED. |
| 3 | Road Work ALL ROADS IN THE COMPLEX WILL BE IN COMBINATION OF CONCRETE PAVERSOF DIFFRENT COLOURS, SHAPE , THICKNESS. ROADS WILL BE MADE AT THE SITE .THE BASE OF THE ROADWILL BE FILLED BY RED MURUM, AFTER THAT 2 LAYER OF AGGREGATE WILL BE LAID TO MAKE SURE THAT THE ROAD IS UPTO THE MARK. AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACK WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE. |
| 4 | Footpaths FOOTHPATH IN THE COMPLEX WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFRENTCOLOURS, SHAPE , THICKNESS OF 65MM AND 80MM LAID OVER 150MM WATER BOUND MACADAM SURFACE. |
| 5 | Water Supply Including Drinking Water Facilities PORTABLE WATER SUPPLY FROM MUNICIPAL WATER SUPPLY SHALL BE COLLECTED IN UNDERGROUND COLLECTION TANK AND PUMPED TO OVERHEAD WATER TANK. THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROM THE SAID OVERHAD WATERTANKS. |
| 6 | Sewer System THE SEWAGE WILL BE COLLECTED THROUGH A SOIL PIPELINE ARRANGEMENT BENDS AND INSPECTION CHAMBERS LEADINGTO THE SEWAGE WATER TREATMENT PLANT (STP) OF THE PROJECT AND TREATEDWATER WILL BE USED FOR IRRIGATION AND FLUSHING PURPOSE. |
| 7 | Drain DRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDED FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUNOFF). |
| 8 | Parks INTERNAL PARK WILL BE PROVIDED AND MAINTAINED. THEPARKS WILL HAVE JOGGING TRACKS, CHILDREN PLAY AREA AND SITTING AREAS. |
| 9 | Tree Planting THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECT AND ALONG THE BOUNDARY WALLS. THE TREESELECTION , FLORA AND VEGETAION. |
| 10 | Design For Electric Supply Including Street Lighting ELECTRIC SUPPLY PROVIDED THROUGH 11/0.433KV TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUPS. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water SEWAGE SHALL BE TREATED IN SEWAGE TREATEMENTPLANT (STP) AND THEREAFTER TREATED WATER TO BE USEDFOR FLUSHINGAND IRRIGATION. |
| 13 | Solid Waste Management And Disposal System SOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STOREDIN GARBAGE ROOM. RECYCLABLE SHALL BE PROCESSED IN THE COMPOSET MACHINE TO MAKE. |
| 14 | Water Conservation System RAIN WATER HARVESTING PITS SHALL BE PROVIDEDFOR GROUND WASTE RECHARGINGAND OVERFLOW TO BE DISCHARGE IN THE MUNICIPAL DRAINS. TREATED SEWAGE. |
| 15 | Energy Management System Including Use of Renewable Energy SINGLE POINT METERING WILL BE THERE FOR ENERGY PURCHASED FROM THEGRID/POWER SUPPLY COMPANY. |
| 16 | Fire Protection And Fire Safety System SPRINKLER, FIRE DOORS, YARD HYDRANTS, SMOKE DETECTOR AND FIREALARM SYSTEM WILL BEPROVIDED AS APPLICABLE. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services COMMON SOCIAL INFRASTRUCTURE SHALL BE PROVIDED FOR ALL THE TOWER COMBINED. |
| 18 | Emergency Evacuation Services FIRE STAIRCASES SHALL BE PROVIDEDAS PER THE APPROVED FIR DRAWING FOR EVACULATION TO OPEN AREAS. |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 8 Oct 2030. 2 of them carry a revalidation, the latest valid to 23 Aug 2032.
Sanctioned by Ghaziabad Development Authority · 12,674 sqm of land · an approved plan of 1 block and 375 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| GROUP HOUSING/019018/GDA/BP-23-24/1564/17052025 | 25 Jun 2025 | 19 Jun 2030 | 22 Aug 2033 | 22 Aug 2032 | — | |
| GROUPHOUSING/019018/GDA/BP-23-24/1564/17052025 | 24 Oct 2025 | 8 Oct 2030 | 17 Sept 2032 | 22 Aug 2032 | 24 Oct 2025 valid to 23 Aug 2032 | |
| GROUPHOUSING/019018/GDA/BP-23-24/1564/17052025 | 24 Oct 2025 | 8 Oct 2030 | 17 Sept 2032 | 22 Aug 2032 | 24 Oct 2025 valid to 23 Aug 2032 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1048 AND 1061 | 12674 | Khasra |
| Sale deed · KHASRA 1048 (AREA- 4142.66 SQM) The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · KHARA 1048 (AREA-4142.66 SQM) The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · KHASRA 1048 (AREA-4142.66 SQM) The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · KHASRA 1061 (AREA- 246.25) The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · KHATAUNI KHASRA 1048 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · KHATAUNI KHASRA 1061 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 22 Jul 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 3 Jul 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 Jul 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 3 Jul 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 3 Jul 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 3 Jul 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 3 Jul 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Jul 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Jul 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 3 Jul 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Jul 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 24 Jul 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 8 Aug 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 3 Jul 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 0.31% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 2.9% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 4.33% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 6.27% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | INFRAEGIS CONSTRUCTIONS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM374568 |
| PAN | AAGCI3390E |
| CIN / TAN | MRTI03228B |
| Name of chairman | ANKUSH TYAGI |
| Registered address | THE CORENTHUM TOWER, TOWER-B 6TH FLOOR, OFFICE NO. 46, SECTOR 62, Gautam Buddha Nagar, Noida, Uttar Pradesh, India, 201301 |
| RERA contact | |
| Registered since | 2025 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | INFRAEGIS CONSTRUCTIONS PVT LTD COLLECTION ACCOUNT FOR ATLASBankICICI BANKBranchCHANDER NAGAR , GHAZIABADBranch addressHALL NO-3, PLOT .1 & 2 CHANDER NAGAR, SURYA NAGAR, GHAZIABAD-UPBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007217Branch emailaditya.kumar9@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | INFRAEGIS CONSTRUCTIONS PVT LTD SEPARATE ACCOUNT FOR ATLASBankICICI BANKBranchCHANDER NAGAR GHAZIABADBranch addressHALL NO-3, PLOT 1 AND 2 , CHANDER NAGAR, SURYA NAGAR , GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0007217 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | INFRAEGIS CONSTRUCTIONS PVT LTD RERA TRANSACTION ACCOUNT FOR ATLASBankICICI BANKBranchCHANDER NAGAR, GHAZIABADBranch addressHALL NO-3, PLOT 1 AND 2, CHANDER NAGAR, SURYA NAGAR, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCC0007217 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 18 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ATLAS
Is ATLAS RERA registered?
Yes. ATLAS is registered with UPRERA under registration number UPRERAPRJ900831, registered on 8 Aug 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ATLAS?
The completion date filed with UPRERA is 22 Aug 2032. No completion certificate is on record yet.
Who is the builder of ATLAS?
INFRAEGIS CONSTRUCTIONS PRIVATE LIMITED is the promoter entity that filed ATLAS with UPRERA (promoter RERA ID UPRERAPRM374568). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ATLAS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ATLAS located?
ATLAS is registered in VILL-NOOR NAGAR, RAJ NAGAR, EXTENSION, GHAZIABAD, Ghaziabad, as filed with UPRERA.
What configurations are available in ATLAS?
The unit plan filed with UPRERA lists 3 BHK, SHOP, 4 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in ATLAS?
The approved unit plan filed with UPRERA runs from 14 to 142 m² of carpet area (about 155 to 1,530 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in ATLAS?
The approved unit plan describes 1 block and 375 units of which 366 are homes and 9 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is ATLAS?
About 120 units per acre: 375 planned units across 3.13 acres (12,674 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗