ATS Kingston Heath is a RERA-registered residential project by CELERITY INFRASTRUCTURE PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ180413). Registered with a completion deadline of 3 Aug 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ180413 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Apr 2021 |
| Project duration | 65 months |
| Address | Plot No. SC-01/C, C-A2, A4, A6, A11, & A12, Sector 150, Noida, Gautam Budh Nagar, UP, Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Company |
| Applicant address | ATS Tower, Plot-16, Sector-135, Noida-201305 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
NOIDA/MVN/2016/IV-1478/922
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 9 Apr 2021 |
| Original completion | 3 Aug 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,89,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK260 54%
- 4 BHK200 42%
- PENTHOUSE18 4%
- VILLA1 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 200 | 209-215 |
| PENTHOUSE | 18 | 261-360 |
| 3 BHK | 260 | 141-148 |
| VILLA | 1 | 440 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER-1 (TYPE-A) · OTHER, 4 BHK, PENTHOUSE | 29 | 52 | 209-360 |
| TOWER-2 (TYPE-A) · OTHER, 4 BHK, PENTHOUSE | 29 | 52 | 209-360 |
| TOWER-3 (TYPE-B) · OTHER, 3 BHK, PENTHOUSE | 30 | 54 | 141-261 |
| TOWER-4 (TYPE-B) · OTHER, 3 BHK, PENTHOUSE | 30 | 54 | 141-261 |
| TOWER-5 (TYPE-A) · OTHER, 4 BHK, PENTHOUSE | 29 | 52 | 209-360 |
| TOWER-6 (TYPE-A) · OTHER, 4 BHK, PENTHOUSE | 29 | 52 | 209-360 |
| TOWER-7 (TYPE-B) · OTHER, 3 BHK, PENTHOUSE | 30 | 54 | 141-261 |
| TOWER-8 (TYPE-B) · OTHER, 3 BHK, PENTHOUSE | 30 | 54 | 141-261 |
| TOWER-9 (TYPE-B) · OTHER, 3 BHK, PENTHOUSE | 30 | 54 | 141-261 |
| VILLA · OTHER, VILLA | 4 | 1 | 440 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Pls refer Approved Building Plan |
| 2 | Boundary Wall RCC/Brick Work in Boundary wall |
| 3 | Road Work WBM with Paver |
| 4 | Footpaths Anti- Skid tile/Paver |
| 5 | Water Supply Including Drinking Water Facilities Noida Authority will supply to entire society and that will further be supplied to dwelling units after filteration from centralized plan |
| 6 | Sewer System Sewage from all units will be treated thru STP |
| 7 | Drain Drainage thru network of pipe catch basins to dispersion trenches with overflow to authority drain |
| 8 | Parks There is an ample central garden area in which locally adapted species of trees and plants will be grown along with outdoor sports amenities and walking tracks. |
| 9 | Tree Planting Locally Adapted species will be grown. Also air purifying species will be planted |
| 10 | Design For Electric Supply Including Street Lighting Thru LT and Sub- distribution Panels |
| 11 | Community Buildings Club and other facility provided |
| 12 | Treatment and Disposal System of Sewage and Sullage water Treatment through STP overflow to authority sewer line |
| 13 | Solid Waste Management And Disposal System Solid waste will be segregated and handed over to authority vendors |
| 14 | Water Conservation System Water efficient plumbing fixtures and rain water harvesting proposed |
| 15 | Energy Management System Including Use of Renewable Energy LED Lights, timer control panel and solar power plant for energy management |
| 16 | Fire Protection And Fire Safety System Integrated fire alarm system as per NBC |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire Escape staircase as per NBC |
| 19 | Other Miscellaneous Work NA |
Registered agents
47 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | AADHAR PROPMART PRIVATE LIMITED | UPRERAAGT10142 |
| 3 | AKHILESH SHARMA | UPRERAAGT16700 |
| 4 | AKSHAY TYAGI | UPRERAAGT16508 |
| 5 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 6 | ANIL RAWAT | UPRERAAGT13580 |
| 7 | Anjul Panjabi | UPRERAAGT13477 |
| 8 | Balwant Rai Nagpal | UPRERAAGT16854 |
| 9 | Bharat Singh | UPRERAAGT10914 |
| 10 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 11 | CSS INFRACON PRIVATE LIMITED | UPRERAAGT15931 |
| 12 | EMPOWER REALTECH PRIVATE LIMITED | UPRERAAGT10623 |
| 13 | FINDING HOME | UPRERAAGT14297 |
| 14 | GATEWAY PROPMART PVT LTD | UPRERAAGT10384 |
| 15 | Gaurav Kaushik | UPRERAAGT15389 |
| 16 | Gen X Estate LLP | UPRERAAGT14766 |
| 17 | GOVIND KUMAR SHARMA | UPRERAAGT15429 |
| 18 | HAPPY HOMES REALTORS AND BUILDERS | UPRERAAGT15217 |
| 19 | Innovance Realty Private Limited | UPRERAAGT13354 |
| 20 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 21 | INVESTORS HOUSE INFRA INDIA | UPRERAAGT14576 |
| 22 | JAI AMBEY CONSULTANTS | UPRERAAGT11064 |
| 23 | Kuldeep Singh Arora | UPRERAAGT18530 |
| 24 | Mahender Kumar Sharma | UPRERAAGT15914 |
| 25 | MANOJ KUMAR | UPRERAAGT15442 |
| 26 | MOHIT GOYAL | UPRERAAGT15259 |
| 27 | MONISHA VOHRA | UPRERAAGT11491 |
| 28 | Mudit | UPRERAAGT12276 |
| 29 | Naturetech Realty Private Limited | UPRERAAGT10282 |
| 30 | Nitin Hubert | UPRERAAGT18667 |
| 31 | PROPFIN SOLUTIONS PVT LTD | UPRERAAGT14948 |
| 32 | Proprex Realty Private Limited | UPRERAAGT13343 |
| 33 | Rajni Dawra | UPRERAAGT13519 |
| 34 | Realpro Realty Solutions Private Limited | UPRERAAGT14664 |
| 35 | Rekha Tulsyan | UPRERAAGT19542 |
| 36 | SALIL POPLI | UPRERAAGT20456 |
| 37 | sandeep goyal | UPRERAAGT15525 |
| 38 | Satyendra Kumar Singh | UPRERAAGT15244 |
| 39 | SG CONSTRUCTIONS | UPRERAAGT13538 |
| 40 | shivendra singh | UPRERAAGT17759 |
| 41 | Shubham Kesharwani | UPRERAAGT20206 |
| 42 | SPN PROPSERVICES LLP | UPRERAAGT19492 |
| 43 | Tarun Gupta | UPRERAAGT15326 |
| 44 | TRUHOMES REALTY | UPRERAAGT10997 |
| 45 | vandana singh | UPRERAAGT20082 |
| 46 | Yashbeer singh | UPRERAAGT20587 |
| 47 | Yogesh Kumar Goel | UPRERAAGT20053 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 4 Aug 2021.
Sanctioned by Noida Authority · 36,705 sqm of land · an approved plan of 10 blocks and 479 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| NOIDA/MVN/2016/IV-1478/922 | 5 Aug 2016 | 4 Aug 2021 | 4 Aug 2026 | 3 Aug 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No-SC/01/C,A2,A4,A6,A11 and A12, Sector-150, Noida | 36705 | Plot |
| Lease deed · 6029 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 5410 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 2844 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · Nil The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 26 Mar 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Mar 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Mar 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Mar 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Mar 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 25 Mar 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Mar 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 16 Mar 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 26 Mar 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Mar 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Mar 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Mar 2021 ↗ |
Quarterly progress reports
22 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
22 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 32.72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 39.91% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 47.28% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 52.29% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | CELERITY INFRASTRUCTURE PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2967 |
| PAN | AAFCC5331C |
| CIN / TAN | U70102DL2014PTC262972 |
| Name of chairman | Mr Getamber Anand |
| Registered address | ATS Tower, Plot-16, Sector-135, Noida-201305 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Celerity Infrastructure Private Limited- Collection A/C for ATS Kingston HeathBankKotak Mahindra Bank Ltd.BranchSector-18, NoidaBranch addressPlot 31 and 32 Block-G, Dist. Gautam Budh NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181Branch emailakhil.sharma[at]kotak.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Celerity Infrastructure Private Limited -Separate Bank Account for ATS Kingston HeathBankKotak Mahindra Bank Ltd.BranchSector- 18, NoidaBranch addressPlot 31 and 32 Block-G, Dist. Gautam Budh NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Celerity Infrastructure Private Limited- RERA Transaction Account for ATS Kingston HeathBankKotak Mahindra Bank Ltd.BranchSector-18, NoidaBranch addressPlot 31 and 32 Block-G, Dist. Gautam Budh NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0000181Branch emailakhil.sharma[at]kotak.com |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 11 (Under Registration - 0 ) → 12 (Under Registration - 0 ) changed in Estanzo’s record | 21 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 11 (Under Registration - 1 ) → 11 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 21 Oct 2026 · 2 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about ATS Kingston Heath
Is ATS Kingston Heath RERA registered?
Yes. ATS Kingston Heath is registered with UPRERA under registration number UPRERAPRJ180413, registered on 9 Apr 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for ATS Kingston Heath?
The completion date filed with UPRERA is 3 Aug 2026. No completion certificate is on record yet.
Who is the builder of ATS Kingston Heath?
CELERITY INFRASTRUCTURE PRIVATE LIMITED is the promoter entity that filed ATS Kingston Heath with UPRERA (promoter RERA ID UPRERAPRM2967). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does ATS Kingston Heath have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is ATS Kingston Heath located?
ATS Kingston Heath is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in ATS Kingston Heath?
The unit plan filed with UPRERA lists OTHER, 4 BHK, PENTHOUSE, 3 BHK and VILLA. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in ATS Kingston Heath?
The approved unit plan filed with UPRERA runs from 141 to 440 m² of carpet area (about 1,519 to 4,740 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in ATS Kingston Heath?
The approved unit plan describes 10 blocks and 479 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is ATS Kingston Heath?
About 53 units per acre: 479 planned units across 9.07 acres (36,705 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗