BUILTUPS ZONE I is a RERA-registered residential project by M/s Uttam Steels & Associates { Consortium) throug in Gautam Budh Nagar (RERA ID UPRERAPRJ5771). Registered with a completion deadline of 8 Apr 2019. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ5771 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bulandsahar Development Authority |
| Proposed start | 1 Dec 2011 |
| Original start | 8 Apr 2011 |
| Project duration | 89 months |
| Address | Dadri, Gautam Budh Nagar |
| Tehsil | Dadri |
| Applicant type | Company |
| Applicant address | 115 Ansal Bhawan, 16 KG Marg, New Delhi-110001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
08/HT/11
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Aug 2017 |
| Original completion | 8 Apr 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹56,500 |
| Sanctioning authority | Bulandsahar Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots yes as per layout plan |
| 2 | Boundary Wall yes with brick walls/MS railings |
| 3 | Road Work yes with WMM /Blacktop surfacing |
| 4 | Footpaths yes with CC tiles/interlocking tiles/pavers |
| 5 | Water Supply Including Drinking Water Facilities yes with DI/GI Lines,Overhead tank/RO system |
| 6 | Sewer System yes with RC pipes/brick manholes |
| 7 | Drain yes with RC pipes/brick manholes |
| 8 | Parks yes as per layout plan |
| 9 | Tree Planting yes along kerbs/footpaths/green areas |
| 10 | Design For Electric Supply Including Street Lighting yes as per norms/byelaws |
| 11 | Community Buildings yes as per masterplan |
| 12 | Treatment and Disposal System of Sewage and Sullage water yes with sewage treatment plant |
| 13 | Solid Waste Management And Disposal System yes for horticulture works |
| 14 | Water Conservation System yes with rain water harvesting system |
| 15 | Energy Management System Including Use of Renewable Energy yes with solar system for areas of common usage |
| 16 | Fire Protection And Fire Safety System as per byelaws |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services yes as per masterplan |
| 18 | Emergency Evacuation Services as per byelaws |
| 19 | Other Miscellaneous Work finishing works as per specification |
Registered agents
3 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 2 | KAPUR ESTATES | UPRERAAGT11301 |
| 3 | UMANG ESTATES C/O VIRENDER SINGH | UPRERAAGT11784 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 8 Apr 2016.
Sanctioned by Bulandsahar Development Authority · 10,237 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 08/HT/11 | 8 Apr 2011 | 8 Apr 2016 | 8 Apr 2019 | 8 Apr 2019 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
Land & documents
50 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 39,87 | 16360 | — |
| 39 | 23004 | — |
| 100 | 455 | — |
| 100 | 1455 | — |
| 39 | 4176 | — |
| 33 | 9060 | — |
| 100 | 370 | — |
| 34,35 | 15855 | — |
| 35 | 5295 | — |
| 94,139 | 4940 | — |
| 94 | 890 | Khasra |
| 139 | 4050 | Khasra |
| 39 | 4176 | Khasra |
| 33 | 9060 | Khasra |
| 100 | 5570 | Khasra |
| 27 | 9106 | Khasra |
| 100 | 2245 | Khasra |
| 93 | 5185 | Khasra |
| 100 | 1520 | Khasra |
| 93 | 5185 | Khasra |
| 90 | 630 | Khasra |
| 27 | 8638.4 | Khasra |
| 100 | 6960 | Khasra |
| 27 | 16423.3 | Khasra |
| 35 | 7942.5 | Khasra |
| 34 | 10560 | Khasra |
| 35 | 2647 | Khasra |
| 27 | 6854 | Khasra |
| 87 | 6260 | Khasra |
| 39 | 10100 | Khasra |
| 27 | 3793 | Khasra |
| 39 | 23004 | Khasra |
| 27 | 3837 | Khasra |
| 100 | 285 | Khasra |
| 27 | 3920 | Khasra |
18 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 30 Dec 2006.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 10868 | 23 Sept 2009 | self | — |
| 11647 | 12 Oct 2009 | self | — |
| 10487 | 3 Sept 2009 | self | — |
| 13831 | 17 Dec 2009 | self | — |
| 13833 | 17 Dec 2009 | self | — |
| 92 | 2 Jan 2007 | self | — |
| 18229 | 30 Dec 2006 | self | — |
| 9800 | 26 Jun 2007 | self | — |
| 10323 | 4 Jul 2007 | self | — |
| 10759 | 13 Jul 2007 | self | — |
| 18228 | 30 Dec 2006 | self | — |
| 12218 | 1 Nov 2010 | self | — |
| 12398 | 9 Nov 2010 | self | — |
| 11906 | 21 Oct 2010 | self | — |
| 18229 | 30 Dec 2006 | self | — |
| 17724 | 5 Oct 2012 | self | — |
| 17725 | 5 Oct 2012 | self | — |
| 12218 | 1 Nov 2010 | self | — |
| Registry document · 17724 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 17725 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 143/9800 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 158/10323 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 173/10759 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 18/18229 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 20/18228 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 208/1394 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 21/92 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 218/1442 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 232/1609 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 235/1672 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 236/1671 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 237/1724 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 250/2726 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 258/3820 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 264/4580 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 291/6684 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 297/7087 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 33/1320 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 343/15040 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 358/9918 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 36/1489 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 369/14332 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 390/7999 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 49/4079 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 77/6368 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 90/7799 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-103/11906 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-106/12218 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-107/12228 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-109/12398 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-113/12782 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-144/278 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-258/21129 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-29/8665 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-33/10487 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-39/10868 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-42/11647 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-45/12683 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-53/13831 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-54/13833 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-59/376 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-65/5702 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-83/7992 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · S-88/8336 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 30 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Health service | YES |
| Renewable energy | YES |
| Other facilities | NO |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Uttam Steels & Associates { Consortium) throug |
| Role | Promoter · current |
| RERA ID | UPRERAPRM9184 |
| PAN | AAGCA0160Q |
| CIN / TAN | U45200DL2006PLC155229 |
| Name of chairman | ARVIND KUMAR MISHRA |
| Registered address | 115 Ansal Bhawan, 16 KG Marg, New Delhi-110001 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ANSAL HI-TECH TOWNSHIPS LTD |
| Role | Co-promoter |
| Applicant type | Company |
| Address | 115-ANSAL BHAWAN KASTURBA GANDHI MARG NEW DELHI-110001 |
| RERA contact |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | AHTL BUILTUPS ZONE IBankPUNJAB NATIONAL BANKBranchMID CORPORATE BRANCHA/C no.IFSCPUNB0419600 |
What has changed on this record
7 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 526 (Under Registration - 1 ) → 527 (Under Registration - 2 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 526 (Under Registration - 2 ) → 526 (Under Registration - 1 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 526 (Under Registration - 3 ) → 526 (Under Registration - 2 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 525 (Under Registration - 2 ) → 526 (Under Registration - 3 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 524 (Under Registration - 1 ) → 525 (Under Registration - 2 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 524 (Under Registration - 2 ) → 524 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 525 (Under Registration - 2 ) → 524 (Under Registration - 2 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 9 Oct 2026 · 7 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about BUILTUPS ZONE I
Is BUILTUPS ZONE I RERA registered?
Yes. BUILTUPS ZONE I is registered with UPRERA under registration number UPRERAPRJ5771, registered on 10 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for BUILTUPS ZONE I?
The completion date filed with UPRERA is 8 Apr 2019. No completion certificate is on record yet.
Who is the builder of BUILTUPS ZONE I?
M/s Uttam Steels & Associates { Consortium) throug is the promoter entity that filed BUILTUPS ZONE I with UPRERA (promoter RERA ID UPRERAPRM9184). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does BUILTUPS ZONE I show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Does BUILTUPS ZONE I have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is BUILTUPS ZONE I located?
BUILTUPS ZONE I is registered in Gautam Budh Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗