BUILTUPS ZONE II

UPRERAAbeyanceRERA data as of 17 Aug 2026

BUILTUPS ZONE II is a RERA-registered residential project by M/s Uttam Steels & Associates { Consortium) throug in Gautam Budh Nagar (RERA ID UPRERAPRJ5838). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: Abeyance.
Project cost
178
Land area
45,431 11.23 acres
Units
not reported
Density (derived)
not reported
Towers
not reported
Config
not reported
Carpet
not reported
Registered
10 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5838
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryBulandsahar Development Authority
Proposed start1 Apr 2013
Original start8 Apr 2011
Project duration123
AddressDadri, Gautam Budh Nagar
TehsilDadri
Coordinates28.501213888888888, 77.56953055555556
Applicant typeCompany
Applicant address115 Ansal Bhawan, 16 KG Marg, New Delhi-110001
Applicant contact9818550761 · megapolis@ansalapi.com

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered10 Aug 2017
Promised completion31 Dec 2022
Revised completion30 Jun 2023
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,32,500
Sanctioning authorityBulandsahar Development Authority

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
VINOD KUMAR AGARWAL
License CA/75/02108
A-6, SECTOR 58, NOIDA
Engineer
CHORDIA TECHNO CONSUL
I-1738, CHITRANJAN PARK,LGF, NEW DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
yes as per layout plan
2Boundary Wall
yes with brick wall/MS railing
3Road Work
yes with WMM/black top surfacing
4Footpaths
yes with CC tiles/interlocking tiles/pavers
5Water Supply Including Drinking Water Facilities
yes with DI/GI lines Over head tanks/RO syytem
6Sewer System
yes with RC pipes/brick manholes
7Drain
yes with RC pipes/brick manholes
8Parks
yes as per norms/byelaws/masterplan
9Tree Planting
yes along kerbs/footpaths/green areas
10Design For Electric Supply Including Street Lighting
yes as per norms/byelaws
11Community Buildings
yes as per norms/byelaws/masterplan
12Treatment and Disposal System of Sewage and Sullage water
yes with sewage treatment plant
13Solid Waste Management And Disposal System
yes for horticulture works
14Water Conservation System
yes with rain water harvesting system
15Energy Management System Including Use of Renewable Energy
yes as per norms/byelaws
16Fire Protection And Fire Safety System
yes as per norms/byelaws
17Social Infrastructure And Other Public Amenities Including Public Health Services
yes as per norms/byelaws/masterplan
18Emergency Evacuation Services
yes as per norms/byelaws/masterplan
19Other Miscellaneous Work
finishing/development works as per specification
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

0 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

Sanctioned by Bulandsahar Development Authority · 45,431 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2023.

#Granted fromExtended uptoNote
131 Dec 202230 Jun 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

212 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
87353.5
184379
4651265
4709168
1422497
1424995
4652975
473628
832732
4651210
473628
4648780
43727
6211552
422530
142833
4651265
2723373
424850
473628
1871729
5663193
5711265
339060
43185
832005
1951280
5703373
142833
4675920
6821120
2322611
2321265
2322108
3410560
422647.5
422647
601850
61780
891270
94890
185210
192770
194130
228M1710
430350
43860
2963720
302/681440
610M11110
602M7940
32960
54950
105200
1411520
1841687
621762
421476
3033564
355295
4665210
1841648
2321770
832108
1871685
5712530
4652530
3031686
5711686
832005
862530
602M7940Khasra
601850Khasra
32960Khasra
31961Khasra
473628Khasra
4651265Khasra
3013680Khasra
339060Khasra
431140Khasra
272150Khasra
31470Khasra
3021700Khasra
34047Khasra
276956Khasra
14395Khasra
4652530Khasra
34053Khasra
935185Khasra
3033564Khasra
935185Khasra
2723373Khasra
274468Khasra
473628Khasra
274170Khasra
32700Khasra
422530Khasra
142833Khasra
6211552Khasra
278095Khasra
35570Khasra
424850Khasra
1431897Khasra
27717Khasra
832005Khasra
3695Khasra
33238Khasra
832005Khasra
3031686Khasra
274175Khasra
5711686Khasra
5711686Khasra
272087Khasra
4675920Khasra
1871729Khasra
5663193Khasra
5711265Khasra
1841648Khasra
271349Khasra
1871685Khasra
355295Khasra
4665210Khasra
4665210Khasra
422648Khasra
422648Khasra
3410560Khasra
422647Khasra
27654Khasra
5712530Khasra
862530Khasra
273800Khasra
142833Khasra
1951280Khasra
5703373Khasra
1841687Khasra
621762Khasra
421476Khasra
87354Khasra
4709168Khasra
32530Khasra
4651265Khasra
184379Khasra
195607Khasra
271010Khasra
832108Khasra
6821120Khasra
2322611Khasra
2321265Khasra
2322108Khasra
271390Khasra
1422497Khasra
1424995Khasra
4652975Khasra
273793Khasra
473628Khasra
4651210Khasra
31390Khasra
272150Khasra
271687Khasra
4648780Khasra
143285Khasra
832732Khasra
273920Khasra
2321770Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

57 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 30 Dec 2006.

Registry no.DateTypeArea
753825 Apr 2012self
1871920 Oct 2012self
1729426 Sept 2012self
1315519 Jul 2012self
996826 Aug 2009self
104933 Sept 2009self
105817 Sept 2009self
956221 Jun 2007self
82518 Jul 2010self
140721 Dec 2009self
1279116 Nov 2009self
594017 May 2010self
922 Jan 2007self
1822930 Dec 2006self
643828 May 2010self
401931 Mar 2010self
643728 May 2010self
964122 Jun 2007self
1182819 Sept 2008self
113361 Oct 2010self
79721 Jul 2009self
1530131 Jul 2014self
1439931 Jul 2014self
168769 Aug 2012self
1075913 Jul 2007self
1822830 Dec 2006self
463922 Mar 2007self
173728 Jan 2011self
19591 Feb 2011self
112419 Jan 2011self
825128 May 2007self
45361 Mar 2013self
45391 Mar 2013self
45682 Mar 2013self
47074 Mar 2013self
122281 Nov 2010self
122181 Nov 2010self
123989 Nov 2010self
177245 Oct 2012self
177235 Oct 2012self
177255 Oct 2012self
1990624 Dec 2011self
37722 Mar 2012self
583229 Mar 2012self
551219 May 2008self
1190621 Oct 2010self
1193422 Oct 2010self
1899925 Oct 2012self
179184 Sept 2014self
215245 Dec 2012self
769811 May 2011self
1373210 Dec 2010self
37543 Apr 2008self
632623 Apr 2007self
67141 May 2007self
632723 Apr 2007self
1635523 Dec 2008self
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 11/17748
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 148/9998
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 20/18228
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 173/10759
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 21/92
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 218/1442
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 219/1441
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 228/1561
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 23/148
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 232/1609
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 235/1672
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 235/1672
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 237/1724
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 250/2726
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 250/2726
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 26/827
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 264/4580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 279/5512
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 297/7087
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 343/15040
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 358/9918
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 367/14177
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 395/8573
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 395/8573
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 49/4079
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 61/5057
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 67/5607
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 77/6368
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · 90/7799
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · D-34/11719
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · D-7/7698
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-103/11906
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-104/11934
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-107/12228
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-109/12398
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-113/12782
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-144/278
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-243/15817
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-256/19481
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-258/21129
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-273/4536
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-29/8665
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-58/347
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-59/376
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-65/5702
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-83/7992
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-87/8251
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · S-88/8336
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Registry document · Y-9/17918
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceYES
Renewable energyYES
Other facilitiesNO

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameM/s Uttam Steels & Associates { Consortium) throug
Roleprimary · current
RERA IDUPRERAPRM9184
PANAAGCA0160Q
CIN / TANU45200DL2006PLC155229
Name of chairmanARVIND KUMAR MISHRA
Registered address115 Ansal Bhawan, 16 KG Marg, New Delhi-110001
RERA contactmegapolis@ansalapi.com · 9818550761
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AHTL BUILTUPS ZONE IIBankPUNJAB NATIONAL BANKBranchMID CORPORATE BRANCHA/C no.4196002900001431IFSCPUNB0419600
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)525 (Under Registration - 2 )524 (Under Registration - 2 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about BUILTUPS ZONE II

Is BUILTUPS ZONE II RERA registered?

Yes. BUILTUPS ZONE II is registered with UPRERA under registration number UPRERAPRJ5838, registered on 10 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for BUILTUPS ZONE II?

The completion date filed with UPRERA is 30 Jun 2023. No completion certificate is on record yet.

Who is the builder of BUILTUPS ZONE II?

M/s Uttam Steels & Associates { Consortium) throug is the promoter entity that filed BUILTUPS ZONE II with UPRERA (promoter RERA ID UPRERAPRM9184). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted BUILTUPS ZONE II more time to complete?

UPRERA's record carries 1 completion extension for BUILTUPS ZONE II, the latest running to 30 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does BUILTUPS ZONE II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is BUILTUPS ZONE II located?

BUILTUPS ZONE II is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗