Buland Residency is a RERA-registered residential project by Buland Housing Pvt. ltd in Agra (RERA ID UPRERAPRJ855434). RERA status: Completed on 16 Apr 2026.
RERA status as reported: Completed.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ855434 |
| Project category | Residential |
| Registration type | New |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 4 Jun 2021 |
| Project duration | 60 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Company |
| Applicant address | 1st Floor, Friends Wasan Plaza, Sanjay Place, Agra-02 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi Devlopment / Plotted Housing/00379/ADA/LD/20-21/0369/29102020
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Jan 2022 |
| Original completion | 3 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Apr 2026 |
| Registration fee | ₹63,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Entry Gate are 9m wide and 6m height. In the project, We have Residential Plots 6785.78Sq mt and Shopping Area 319.66 Sq mt |
| 2 | Boundary Wall Not Required |
| 3 | Road Work 1893.12sq m. The Following development Consists of 5m wide road and 2Meter Wide footpath |
| 4 | Footpaths 1262.08sq m, the following Development consists of 2 meter wide footpath |
| 5 | Water Supply Including Drinking Water Facilities The site consists of 15000l of overhead tank, raw water underground sump tank of 25000L, and treated water underground sump tank 25000l |
| 6 | Sewer System Under Ground / STP of capacity, 25kld consists in the development |
| 7 | Drain stormwater drains are 600mm wide and their outlet is towards Rainwater harvesting pits |
| 8 | Parks Site Plan consists of 1207.03 sq.m. park with plantation of homogeneous trees |
| 9 | Tree Planting homogeneous Trees In Park and footpath |
| 10 | Design For Electric Supply Including Street Lighting UnderGround With felon Piller. street lights are at 20 m interval |
| 11 | Community Buildings Not Required |
| 12 | Treatment and Disposal System of Sewage and Sullage water Development Consists of a 1200mm dia. chamber at an interval ranging from 24m to 35m with pipes of dia 150 mm. the STP os of 25KLD. |
| 13 | Solid Waste Management And Disposal System A designated garbage collection tank is placed in the plan. |
| 14 | Water Conservation System Rain Water harvesting pit has 160 mm 10Kg/sq.cm perforated pipe. the pit has a dia of 1500mm. there are 4 such pits. |
| 15 | Energy Management System Including Use of Renewable Energy Electric Supply Taken From U.P.S.E.B |
| 16 | Fire Protection And Fire Safety System Allotted plots consist of setbacks as per the fire norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Required |
| 18 | Emergency Evacuation Services Allotted Plots consist of setbacks as per the fire Norms. Emergency Evacuation Service not required |
| 19 | Other Miscellaneous Work Not Required |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 3 Jun 2026.
Sanctioned by Agra Development Authority · 11,656 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi Devlopment / Plotted Housing/00379/ADA/LD/20-21/0369/29102020 | 4 Jun 2021 | 3 Jun 2026 | 3 Jun 2026 | 3 Jun 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 942,943,944,945,946(Part) | 11656.38 | Khasra |
| Registry document · 2995 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 22 Nov 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 10 Nov 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 10 Nov 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 10 Nov 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Nov 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Nov 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 10 Nov 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Nov 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Nov 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Nov 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Nov 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Nov 2021 ↗ |
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | 20% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 30% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 35% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 40% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 46% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 50% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 55% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 60% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 75% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 80% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 82% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 85% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 92% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 97% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 98% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Buland Housing Pvt. ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM19800 |
| PAN | AADCB0149B |
| CIN / TAN | U45200DL2006PTC228181 |
| Name of chairman | Sh. Phundi Lal Sharma |
| Registered address | 1st Floor, Friends Wasan Plaza, Sanjay Place, Agra-02 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Buland Housing Pvt. Ltd. - Collection Account - Buland ResidencyBankAxis Bank limitedBranchSanjay Place, AgraBranch addressSanjay Place, AgraBranch districtAgraA/C no.IFSCUTIB0000086 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Buland Housing Pvt. Ltd. - Separate Account - Buland ResidencyBankAxis Bank LimitedBranchSanjay Place, AgraBranch addressSanjay Place, AgraBranch districtAgraA/C no.IFSCUTIB0000086 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Buland Housing Pvt. Ltd. - Transaction Account - Buland ResidencyBankAxis Bank LimitedBranchSanjay Place, AgraBranch addressSanjay Place, AgraBranch districtAgraA/C no.IFSCUTIB0000086 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| RERA status | registered → completed changed in Estanzo’s record | 18 Oct 2026 |
| RERA status | changed in Estanzo’s record · 18 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Buland Residency
Is Buland Residency RERA registered?
Yes. Buland Residency is registered with UPRERA under registration number UPRERAPRJ855434, registered on 4 Jan 2022. Estanzo reproduces that filing; it does not verify the work behind it.
Has Buland Residency been completed?
UPRERA lists Buland Residency as completed, with a completion certificate dated 16 Apr 2026, against a filed deadline of 3 Jun 2026.
Who is the builder of Buland Residency?
Buland Housing Pvt. ltd is the promoter entity that filed Buland Residency with UPRERA (promoter RERA ID UPRERAPRM19800). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Buland Residency have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Buland Residency located?
Buland Residency is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗