Chandra Shekhar Azad & Khudiram Bose Enclave

UPRERARegistered

Chandra Shekhar Azad & Khudiram Bose Enclave is a RERA-registered residential project by Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) in Lucknow (RERA ID UPRERAPRJ796428). Registered with a completion deadline of 2 Aug 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
46.48%Q3'25
48.49%Q4'25
48.49%Q1'26
51.23%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ796428
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Feb 2020
Project duration79 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    43128

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. valid to

    Permit revalidated

    Group Housing/ 13571/LDA/BP/24-25/2268/14102024

  8. Building permit sanctioned

    Group Housing/ 13571/LDA/BP/24-25/2268/14102024

  9. to

    Extension granted

  10. to

    Extension granted

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Feb 2020
Original completion3 Oct 2024
Revised completion2 Aug 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹83,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors720 · 3 · 12 (units from plan)
  • 1 BHK384 53%
  • OTHER336 47%
ConfigurationUnitsCarpet area
1 BHK38433
OTHER33628-28
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EWS TOWER-3 · OTHER1233628-28
LIG Tower-1 · 1 BHK1219233
LIG Tower-2 · 1 BHK1219233
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SHYAM SUNDER P SONAR
License CA/2004/34303
Spectrum Design Group 4th Floor, B-Wing, HDIL Tower, Station Road, Bandra, Mumbai
Engineer
T.D. ANEJA
460, TOWER , HEWO-2, SECTOR-56, GURGAON
Contractor
INHOUSE
INHOUSE
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of Plot of EWS/LIG will be done as per Layout Plan by Promoter.
2Boundary Wall
Boundary wall will be constructed by Promoter with Brick work or MS Grill as per site plan
3Road Work
25 mm thick Bitumen Road will be constructed over 125/150 thick WBM, Road width will be asper approved Layout.
4Footpaths
Footpath will be developed on road side and green areas by interlocking tile/pavers/red stone.
5Water Supply Including Drinking Water Facilities
Water supply including drinking water facilities will be provide through OHT/Township Water Supply Network as per Norms.
6Sewer System
Under ground Sewerage Disposal System will be provided at site as per Norms.
7Drain
Under ground Drainage System will be provided at site as per Norms.
8Parks
Parks will be developed as per layout Plan/Landscape plan
9Tree Planting
Tree planting will be done as per Norms
10Design For Electric Supply Including Street Lighting
Electricity supply will be provided from as per UPPCL Norms and from Main Substation of Hi-Tech Township. Street lighting will be provide by promoter as to be Designed.
11Community Buildings
Common community building will be available for the Hi-Tech township.
12Treatment and Disposal System of Sewage and Sullage water
Common STP in Hitech Township will be provided by Promotor for Treatment of Sewage and sullage water as per Norms. After Treatment, Treated Sewage Water will be used in Irrigation and Surplus Treated Sewage Water will be disposed in Municipal Sewer Line.
13Solid Waste Management And Disposal System
Solid waste management and disposal system will be provided as per Norms
14Water Conservation System
Water conservation System will be provided as per Norms
15Energy Management System Including Use of Renewable Energy
Energy management system i/c use of renewable energy system will be provided as per Norms
16Fire Protection And Fire Safety System
Fire Protection and Fire Safety System will be provided as per Norms & Design
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common Social infrastructure and public amenities i/cPublic health Services will be available for the Hi-Tech township.
18Emergency Evacuation Services
Emergency Evacuation Services will be provided as per Norms & Design
19Other Miscellaneous Work
As per Specification/Norms will be provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1GOLDEN ESTATEUPRERAAGT10397
2SHREE SHRADDHA PROPERTIESUPRERAAGT10301
3TULSI REAL ESTATEUPRERAAGT13187
4Udai AssociatesUPRERAAGT14663
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 3 Oct 2027. 2 of them carry a revalidation, the latest valid to 3 Oct 2027.

Sanctioned by Lucknow Development Authority · 15,582 sqm of land · an approved plan of 3 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
431284 Oct 20193 Oct 20243 Oct 20273 Oct 2024—
431284 Oct 20193 Oct 20243 Oct 20282 Apr 20254 Oct 2019
valid to 3 Oct 2027
Group Housing/ 13571/LDA/BP/24-25/2268/141020244 Oct 20243 Oct 20273 Oct 20282 Apr 20254 Oct 2024
valid to 3 Oct 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 2 Aug 2026.

#Granted fromExtended uptoNote
13 Oct 20242 Apr 2025Six months extension in view of force majeure caused by covid-19 pandemic
22 Apr 20252 Apr 2026—
32 Apr 20262 Aug 2026—

Land & documents

29 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3174ka750Khasra
3174kha760Khasra
3175955Khasra
31762260Khasra
3177645Khasra
3178591Khasra
3181sa1140Khasra
31821159Khasra
3183630Khasra
31841420Khasra
31852590Khasra
31861010Khasra
31871670Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 2366
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6957
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6959
The registered deed by which the promoter bought the land.
PDF ↗
Lease deed · 8611
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Sale deed · 15315
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2949
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Jan 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Jan 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Jan 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Feb 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Jan 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Jan 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Jan 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Jan 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Feb 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Jan 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Jan 2020 ↗

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q246.48%CA ↗ · Arch ↗ · Eng ↗
2025-Q348.49%CA ↗ · Arch ↗ · Eng ↗
2025-Q448.49%CA ↗ · Arch ↗ · Eng ↗
2026-Q151.23%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOmaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)
RolePromoter · current
RERA IDUPRERAPRM5708
PANAADCG1919Q
CIN / TANDELG12028C
Name of chairmanMr. Manoj Tiwari
Registered address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GARV BUILDTECH PRIVATE LIMITED OMAXE METRO CITY P-3-A RERA A/CBankAxis BankBranchVIBHUTI KHAND LUCKNOW,A/C no.IFSCUTIB0002800
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2026-04-02 → 2026-08-02
changed in Estanzo’s record
7 Oct 2026
Completion extension
no. 3
extension 3 to 2026-08-02
newly filed with RERA
7 Oct 2026
Promoter’s complaints tally (all their projects)40 (Under Registration - 2 ) → 41 (Under Registration - 3 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)40 (Under Registration - 3 ) → 40 (Under Registration - 2 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)39 (Under Registration - 4 ) → 40 (Under Registration - 3 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Oct 2026
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 17 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Chandra Shekhar Azad & Khudiram Bose Enclave

Is Chandra Shekhar Azad & Khudiram Bose Enclave RERA registered?

Yes. Chandra Shekhar Azad & Khudiram Bose Enclave is registered with UPRERA under registration number UPRERAPRJ796428, registered on 19 Feb 2020. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Chandra Shekhar Azad & Khudiram Bose Enclave?

The completion date filed with UPRERA is 2 Aug 2026. No completion certificate is on record yet.

Who is the builder of Chandra Shekhar Azad & Khudiram Bose Enclave?

Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) is the promoter entity that filed Chandra Shekhar Azad & Khudiram Bose Enclave with UPRERA (promoter RERA ID UPRERAPRM5708). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Chandra Shekhar Azad & Khudiram Bose Enclave more time to complete?

UPRERA's record carries 3 completion extensions for Chandra Shekhar Azad & Khudiram Bose Enclave, the latest running to 2 Aug 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Chandra Shekhar Azad & Khudiram Bose Enclave have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Chandra Shekhar Azad & Khudiram Bose Enclave located?

Chandra Shekhar Azad & Khudiram Bose Enclave is registered in Lucknow, as filed with UPRERA.

What configurations are available in Chandra Shekhar Azad & Khudiram Bose Enclave?

The unit plan filed with UPRERA lists 1 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Chandra Shekhar Azad & Khudiram Bose Enclave?

The approved unit plan filed with UPRERA runs from 28 to 33 m² of carpet area (about 301 to 354 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Chandra Shekhar Azad & Khudiram Bose Enclave?

The approved unit plan describes 3 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Chandra Shekhar Azad & Khudiram Bose Enclave?

About 187 units per acre: 720 planned units across 3.85 acres (15,582 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗