Omaxe Metro City Phase 4

UPRERARegistered

Omaxe Metro City Phase 4 is a RERA-registered residential project by Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) in Lucknow (RERA ID UPRERAPRJ872560). Registered with a completion deadline of 15 Feb 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
33.81%Q3'24
33.81%Q4'24
33.81%Q1'25
33.81%Q2'25
33.81%Q3'25
33.81%Q4'25
33.81%Q1'26
33.81%Q2'26

Construction stayed at 33.81% across 13 consecutive filed quarters (Apr–Jun 2023 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ872560
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Apr 2023
Project duration59 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    43026

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Apr 2023
Original completion15 Feb 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹41,000
Sanctioning authorityLucknow Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Apurba bohra
License CA/2013/61818
10, LSC, KALKAJI, NEW DELHI
Engineer
SANJEEV JAIN CHORDIA ENGINEERING CONSULTANCY SERVICES
LOWER GROUND FLOOR , CR PARK. NEW DELHI 110019
Contractor
In House
In House
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of project, completed at site
2Boundary Wall
Boundary wall will be constructed for Villa only , No boundary wall will be constructed for floors or as per requirement and designed by promoter
3Road Work
9/12 mtr wide Bitumen road will be constructed as per approved layout, as per requirement and designed by promoter
4Footpaths
Both side of road , foothpath will be developed, width 2.0 or 3.0 mtr as per requirement and designed by promoter
5Water Supply Including Drinking Water Facilities
Water Supply including Drinking water facilities will be provided by promoter through common Over Head Tank as constructed at project Hi-Tech Township
6Sewer System
Common S.T.P will be constructed by promoter , for high tech township at site for sewer disposal
7Drain
Drainage system will be developed and connected with RWH and overflow will be connected with Existing Drains.
8Parks
Common Parks/ Green area available in Hitech- Township and will be developed as per approved plan and requirements.
9Tree Planting
Required tree will planted on Road Berms and parks as per requirement and norms.
10Design For Electric Supply Including Street Lighting
Common ESS will be developed for Hi- Tech Township . Electric supply will be provided from ESS . Street Lights will be fixed at road berms as per requirements and design
11Community Buildings
Common Community Buildings will be provided for Hi-Tech Township
12Treatment and Disposal System of Sewage and Sullage water
S.T.P. will be constructed at site, and treated water will be used in Irrigation of green areas
13Solid Waste Management And Disposal System
Solid Waste management and disposal system will be provided as per requirement and Govt Norms
14Water Conservation System
Water Conservation System will be provided as per Govt Norms
15Energy Management System Including Use of Renewable Energy
Energy Management System Including Use if Renewable Energy will be provided as per Govt. Norms
16Fire Protection And Fire Safety System
Required Fire NOC received and Fire Protection and Fire Safety System will be provided as per Design and Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common social infrastructure and public amenities including public health services will be provided in Hitech Township
18Emergency Evacuation Services
N/A
19Other Miscellaneous Work
As per specification and approved Map all works will be developed
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

107 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ABHINAV KHAREUPRERAAGT14915
2ABHINEET GAURUPRERAAGT14935
3ABHISHEK KUMAR SINGHUPRERAAGT15288
4Adish JainUPRERAAGT21672
5Ajit RaiUPRERAAGT11295
6Akansha BansalUPRERAAGT20837
7AKASH DEEP SRIVASTAVAUPRERAAGT15712
8Amarnath PandeyUPRERAAGT22741
9AMIT AGARWALUPRERAAGT11945
10Amit KhareUPRERAAGT19477
11AMIT KUMAR NISHADUPRERAAGT14016
12Amit madanUPRERAAGT19393
13Amit MisraUPRERAAGT18676
14Anamika MishraUPRERAAGT16351
15ANAND KUMAR SHUKLAUPRERAAGT10831
16ANURAG GUPTAUPRERAAGT14504
17ANYA PROPERTIESUPRERAAGT15969
18ARJUN SINGH YADAVUPRERAAGT11879
19ASA FINCAP ADVISORS LLPUPRERAAGT10926
20Ashish TripathiUPRERAAGT18925
21Balbir SinghUPRERAAGT20260
22BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITEDUPRERAAGT14759
23BIPIN CHANDRA PANTUPRERAAGT13687
24BRIXWELL REALTY & CONSTRUCTION LLPUPRERAAGT15068
25Chandan GuptaUPRERAAGT13125
26CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
27DAIWIK REALTORSUPRERAAGT12075
28Dev Real Estate and FinanceUPRERAAGT16776
29EXPLORE REALTIESUPRERAAGT20447
30GOLDEN ESTATEUPRERAAGT10397
31HIRA LAL SRIVASTAVAUPRERAAGT23401
32Hitesh KesarwaniUPRERAAGT11538
33HITESH KHANNAUPRERAAGT13833
34INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
35KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
36KHUSHBOO KUSHWAHAUPRERAAGT19671
37KUMAR KESHAVUPRERAAGT18972
38LINK PROPERTIESUPRERAAGT10081
39LIPIKA CHATTERJEEUPRERAAGT14888
40M.S. Property Consultants L.L.P.UPRERAAGT10074
41ManishUPRERAAGT17425
42manju tripathiUPRERAAGT14947
43MARKANDEY SINGHUPRERAAGT18928
44MOHD AFZALUPRERAAGT13830
45Mohd Atif AliUPRERAAGT17360
46MONISHA BUDHRAJAUPRERAAGT16694
47Mr. Janardan AgarwalUPRERAAGT10555
48MUKESH KUMAR KESWANIUPRERAAGT21532
49Mukesh kumar SharmaUPRERAAGT11494
50Narendra SinghUPRERAAGT14206
51O.C. INFRAVENTURES AND CONSTRUCTION PVT LTDUPRERAAGT15084
52Om PrakashUPRERAAGT17435
53Pankaj MittalUPRERAAGT13523
54Pappu Kumar ThakurUPRERAAGT21543
55PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
56Prashant GuptaUPRERAAGT19667
57Prem Prakash KhareUPRERAAGT13677
58Priya MishraUPRERAAGT18717
59R K PROPERTIESUPRERAAGT11201
60RADHE SHAYMUPRERAAGT19129
61RADHESH CHANDRAUPRERAAGT10484
62RAJEEV CHHOKERUPRERAAGT19007
63RAJEEV KUMAR SHUKLAUPRERAAGT13288
64Rajesh kumarUPRERAAGT20162
65RAJNI NIGAMUPRERAAGT10897
66RANJEET KUMAR MISHRAUPRERAAGT21505
67REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
68Resicom Forever Private LimitedUPRERAAGT21912
69Rishabh SaxenaUPRERAAGT13851
70S.R.Broker LLPUPRERAAGT10051
71Sakshi GuptaUPRERAAGT16025
72Sandeep TripathiUPRERAAGT12229
73SANJEEV KUMAR BANKAUPRERAAGT10894
74Santosh Kumar Mishra C/O UNITEDWORLD PROPERTIES (P) LTD.UPRERAAGT22197
75SATYAM SINGHUPRERAAGT18865
76SAURAV KUMARUPRERAAGT16244
77SDR INFRA BUILD PVT LTDUPRERAAGT11062
78SHALINI TIWARYUPRERAAGT22832
79Shalini VermaUPRERAAGT15031
80SHALINI WADHWAUPRERAAGT15032
81SHREE SHRADDHA PROPERTIESUPRERAAGT10301
82SHRI RUDRA REAL ESTATESUPRERAAGT14251
83shrikant upadhyayUPRERAAGT15563
84SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
85SOURABH NIGAMUPRERAAGT10900
86STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
87TARUN PREET SINGH SAHNIUPRERAAGT12537
88TULSI REAL ESTATEUPRERAAGT13187
89Tushar ChandaniUPRERAAGT12001
90Udai AssociatesUPRERAAGT14663
91Unnisis Infrratech Private LimitedUPRERAAGT15300
92URMILAUPRERAAGT22764
93Vajrakaya Buildwell Private LimitedUPRERAAGT12913
94VANDANA SRIVASTAVAUPRERAAGT18502
95Varun Properties Inc.UPRERAAGT11985
96VELOCITY DEVELOPERSUPRERAAGT10813
97Vikram singhUPRERAAGT10860
98VINAY KUMAR SINGHUPRERAAGT11226
99VINEET THAPARUPRERAAGT20835
100VINITA MISHRAUPRERAAGT16506
101Vinod DawraUPRERAAGT19609
102VIRENDRA KUMAR DEWANUPRERAAGT13205
103VISHAL BAJPAIUPRERAAGT11344
104VISHAL KUMARUPRERAAGT14798
105vishal srivastavaUPRERAAGT11982
106VIVEK SHARMAUPRERAAGT22609
107WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 Feb 2028.

Sanctioned by Lucknow Development Authority · 7,143 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
4302622 Feb 202321 Feb 20289 Oct 203015 Feb 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

24 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3080Mi820Khasra
3080ja3790Khasra
3080ka4170Khasra
3459Sa7127Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 906
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 33700
The registered deed by which the promoter bought the land.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 7013
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9975
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10950
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Mar 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Mar 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New18 Mar 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Mar 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Mar 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Mar 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New18 Mar 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New24 Mar 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 Mar 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New29 Mar 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New24 Mar 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 Mar 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New29 Mar 2023 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2026-Q1.

QuarterConstructionCertificates
2023-Q133.81%CA ↗ · Arch ↗ · Eng ↗
2023-Q233.81%CA ↗ · Arch ↗ · Eng ↗
2023-Q333.81%CA ↗ · Arch ↗ · Eng ↗
2023-Q433.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q133.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q233.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q333.81%CA ↗ · Arch ↗ · Eng ↗
2024-Q433.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q133.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q233.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q333.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q433.81%CA ↗ · Arch ↗ · Eng ↗
2026-Q133.81%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOmaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)
RolePromoter · current
RERA IDUPRERAPRM5708
PANAADCG1919Q
CIN / TANDELG12028C
Name of chairmanMr. Manoj Tiwari
Registered address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameOmaxe Limited
RoleCo-promoter · current
RERA IDUPRERAPRM2386
Applicant typeCompany
PANAAACO0171H
CIN / TANDELO01861G
Name of chairmanMr. Rohtash Goel
Registered addressSHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
RERA contact
Registered since2017

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Omaxe Garv Buildtech Collection Account Metro City Phase-4BankIDBI BANK LUCKNOWBranchIDBI BANK , INDRA NAGAR, LUCKNOWBranch addressIDBI BANK, INDRA NAGAR, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCIBKL0000277
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
OMAXE GARV BUILDTECH SEPARATE BANK ACCOUNT METRO CITY PHASE-4BankIDBI BANK LUCKNOWBranchIDBI BANK, INDRA NAGAR, LUCKNOWBranch addressIDBI BANK, INDRA NAGAR, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCIBKL0000277
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
OMAXE GRAV BUILDTECH TRANSACTION ACCOUNT METROCITY PHASE 4BankIDBI BANKBranchIDBI BANK, INDRA NAGAR, LUCKNOWBranch addressIDBI BANK, INDRA NAGAR, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCIBKL0000277
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)40 (Under Registration - 2 ) → 41 (Under Registration - 3 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)40 (Under Registration - 3 ) → 40 (Under Registration - 2 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)39 (Under Registration - 4 ) → 40 (Under Registration - 3 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 17 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Omaxe Metro City Phase 4

Is Omaxe Metro City Phase 4 RERA registered?

Yes. Omaxe Metro City Phase 4 is registered with UPRERA under registration number UPRERAPRJ872560, registered on 19 Apr 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Omaxe Metro City Phase 4?

The completion date filed with UPRERA is 15 Feb 2028. No completion certificate is on record yet.

Who is the builder of Omaxe Metro City Phase 4?

Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) is the promoter entity that filed Omaxe Metro City Phase 4 with UPRERA (promoter RERA ID UPRERAPRM5708). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Omaxe Metro City Phase 4 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Omaxe Metro City Phase 4 located?

Omaxe Metro City Phase 4 is registered in Lucknow, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗