CITIZEN PAVITRA is a RERA-registered residential project by ABHIYAAN BUILDCON PRIVATE LIMITED in ANDAWA, Prayagraj (RERA ID UPRERAPRJ569226). Registered with a completion deadline of 20 Apr 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ569226 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Prayagraj(Allahabad) Development Authority |
| Proposed start | 21 Apr 2025 |
| Project duration | 60 months |
| Address | PART OF ARAZI NO 878, MAUJA- ANDAWA, PARGANA-JHUNSI, ANDAWA, Phulpur, Prayagraj |
| Tehsil | Phulpur |
| Applicant type | Company |
| Applicant address | 14 IBRAHIMPUR, MAZRA KATKA, JHUNSI, NEAR INDIAN OIL TRIVENIPURAM, ALLAHABAD |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi development/Plotted Housing/04710/PDA/LD/24-25/1129/24022025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 Jun 2025 |
| Original completion | 20 Apr 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 3 Oct 2026 |
| Registration fee | ₹46,000 |
| Sanctioning authority | Prayagraj(Allahabad) Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved map a total of 53 plots are being developed of various sizes. Demarcation of plot will be done with RCC pillars on four corner of 5 ft height. |
| 2 | Boundary Wall Project bounded by compound wall. The said boundary wall is constructed with 9 inch thick brick work and 6 ft in height. the construction is done by fly-ash/red brick work using cement mortar in 1-6 ratio |
| 3 | Road Work The internal road will be developed within the project with 9 meter width. Road construction is carried out with basic earth work followed by WBM. GSB, stone dust and ganga sand followed with extensive compaction and thereafter finished with CC work 5 inch thick concrete. |
| 4 | Footpaths The footpath (3ft wide) have been designed to carry sewer (6 inch hume pipe) water line (2 inch UPVC) storm water ( 6 Inch PVC pipe) Drain pipe. All these services are underground. The footpath is constructed using paver blocks with kerb stone (12 inch wide) |
| 5 | Water Supply Including Drinking Water Facilities Water is being supplied through borewell with 6 inch boring and 5HP pump. Supply to units will be done by underground UPVC pipes of 2 inch thickness. |
| 6 | Sewer System A network underground 6 inch hume/PVC pipe will be laid to carry sewerage from household to STP placed within the project. The project is planned with packaged STP of 40 KLD. |
| 7 | Drain Roof top run off and kitchen waste water is from households through 6 inch PVC pipes which is laid underground or road (9inch wide ) side drain depending upon the classification of waste water. The waste water will be used for irrigation and road cleaning. |
| 8 | Parks Total park area to be developed is 1220 Sq. mtr. The park will be developed as per the horticulture plan, hierarchical trees and shrubs will be planted as per forest policy. The park will be bounded with MS grill and ample lighting arrangement will be made. Park benches will be installed at regular interval. |
| 9 | Tree Planting More than 50 trees have been planted within the project. Avenue trees such as kadam and bushes and hedges will be planted hierarchical order. Flowering plants and evergreen plant have been planted in open areas and other installation. |
| 10 | Design For Electric Supply Including Street Lighting Underground cables will be used to supply LT power with 3.5x70mm armoured cable and electrical distribution from DB to individual units by 10mm wires. Modern street light will be installed alternatively at every 40 to 60 ft interval. |
| 11 | Community Buildings Considering the small size of project no such community building is planned. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Package STP of 40 KLD installed as per MBBR technology. The sewage and sullage water will be carried from households through underground services pipes to STP. Treated water from STP will be used for irrigation and road cleaning. The detailed project report for the treatment of Sewage through STP has been submitted before PDA. |
| 13 | Solid Waste Management And Disposal System STP planned for the project works to break-down solid waste and filtered water is received from the incoming gray water. This filtered water is used to for irrigation and washing of roads. |
| 14 | Water Conservation System Rain water harvesting is planned at the north end of the project land and the stipulated NOC from ground water department will be taken. RWH pits of 40 cumt. along with filters have been planned. |
| 15 | Energy Management System Including Use of Renewable Energy The electrical plan of the project has been developed as per norms of UP electricity board and PuVVNL. Solar flood light at strategic location will be provided to supplement the street light on utility power. |
| 16 | Fire Protection And Fire Safety System Being a plotted development project the requirement for fire protection is limited, however 4 number fire hydrant and sand bucket have been placed at various easily accessible areas. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not applicable in this project. |
| 18 | Emergency Evacuation Services Emergency evacuation areas has been earmarked in open space such as park and tot-lots with a capacity to hold minimum 100 persons at a time in case of requirement. Being plotted development project the need for such services is minimal . |
| 19 | Other Miscellaneous Work Development norms rules and commitment made before PDA in the development plan will be adhere to. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 20 Apr 2030.
Sanctioned by Prayagraj(Allahabad) Development Authority · 8,123 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi development/Plotted Housing/04710/PDA/LD/24-25/1129/24022025 | 21 Apr 2025 | 20 Apr 2030 | 20 Apr 2033 | 20 Apr 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 878 | 8550 | Plot |
| 161624205036 | 8550 | Khasra |
| Registry document · 1/10855/27-48/15295 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Fasli Year 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 1 May 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Apr 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 Apr 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Apr 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 23 Apr 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Apr 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Apr 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Apr 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Apr 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 1 May 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 23 Apr 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 23 Apr 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 23 Apr 2025 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 31.47% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 49.1% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 67.8% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 95% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ABHIYAAN BUILDCON PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM7626 |
| PAN | AAGCS9845J |
| CIN / TAN | U45202UP1989PTC010507 |
| Name of chairman | ANUBHAV VERMA |
| Registered address | 14 IBRAHIMPUR, MAZRA KATKA, JHUNSI, NEAR INDIAN OIL TRIVENIPURAM, ALLAHABAD |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Prayagraj
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | ABHIYAAN BUILDCON-COLLECTION ACCOUNT FOR CITIZEN PAVITRABankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12, KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagrajA/C no.IFSCIDIB000A580Branch emaila580@indianbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | ABHIYAAN BUILDCON-SEPARATE BANK ACCOUNT FOR CITIZEN PAVITRABankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12, KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | ABHIYAAN BUILDCON RERA TRANSACTION ACCOUNT FOR CITIZEN PAVITRABankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12, KP KAKKAR ROAD, PRAYAGRAJBranch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Latest completion certificate filed on | 2026-10-03 first recorded by Estanzo | 11 Oct 2026 |
| Completion date recorded | 2026-10-03 first recorded by Estanzo | 11 Oct 2026 |
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 7 Oct 2026 |
| Latest completion certificate filed on | first recorded by Estanzo · 11 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CITIZEN PAVITRA
Is CITIZEN PAVITRA RERA registered?
Yes. CITIZEN PAVITRA is registered with UPRERA under registration number UPRERAPRJ569226, registered on 3 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.
Has CITIZEN PAVITRA been completed?
UPRERA still lists CITIZEN PAVITRA as Registered, so it is not shown as completed here. A completion certificate dated 3 Oct 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of CITIZEN PAVITRA?
ABHIYAAN BUILDCON PRIVATE LIMITED is the promoter entity that filed CITIZEN PAVITRA with UPRERA (promoter RERA ID UPRERAPRM7626). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does CITIZEN PAVITRA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CITIZEN PAVITRA located?
CITIZEN PAVITRA is registered in ANDAWA, Prayagraj, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗