NEW SUNCITY EXT-P3 is a RERA-registered residential project by CITIZEN HOUSING AND DEVELOPING COOPERATIVE SOCIETY in JHUNSI, Prayagraj (RERA ID UPRERAPRJ907325). Registered with a completion deadline of 1 Jan 2029.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ907325 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Prayagraj(Allahabad) Development Authority |
| Proposed start | 10 Jan 2024 |
| Project duration | 60 months |
| Address | MAUJA ANDAWA & BADHAWA TAHIRPUR, JHUNSI, Phulpur, Prayagraj |
| Tehsil | Phulpur |
| Applicant type | Societies |
| Applicant address | SAHYOG BHAWAN, 1 MG MARG, CIVIL LINES, ALLAHABAD |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
02/O.C.(T.C.)/ZONE-5/INTEGRATED/DEV.AUTH/2023-24/DATED 10/01/2024
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 5 Sept 2024 |
| Original completion | 1 Jan 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 31 May 2025 |
| Registration fee | ₹30,000 |
| Sanctioning authority | Prayagraj(Allahabad) Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots AS PER APPROVED MAP A TOTAL OF 25 PLOTS ARE BEING DEVELOPED OUT VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH 5 FT (4 INCH) BRICK WORK |
| 2 | Boundary Wall THE EXTENSION-P3 IS CONJUNCTION WITH LARGER INTEGRATED TOWNSHIP WHICH IS DEVELOPED WITH SINGLE ENTRY AND EXIT. THE TOWNSHIP IS BOUNDED BY COMPOUND WALL ACROSS THE TOWNSHIP. THE SAID BOUNDARY WALL IS CONSTRUCTED WITH 9 INCH BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE WITH FLY-ASH/RED BRICK USING CEMENT MORTAR 1-6 RATIO. |
| 3 | Road Work AS PER DPR OF THE PROJECT ROAD NETWORK IS DEVELOPED ACROSS THE PROJECT IN HIERARCHY FROM 15 MTR., 12 MTR AND 9 MTR. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM, GSB, AND STONE DUST FOLLOWED WITH EXTENSIVE COMPACTION THEREAFTER GANGA SAND (2 INCH THICK BED) IS LAID AND THEREAFTER FINISHED WITH INTERLOCKING PAVERS. |
| 4 | Footpaths THE FOOTPATHS HAVE BEEN DESIGNED TO CARRY SEVER (6 INCH HUME PIPE). WATER LINE (2 INCH UPVC). STORM WATER (6 INCH PVC PIPE) DRAIN PIPE. ALL TEHSE SERVICES ARE UNDERGROUND. THE FOOTPATH IS CONSTRUCTED USING CHEQURED TILES (1FTX1FT) WITH KERB STONE (12 INCH WIDE). AVENUE TREES AND ELECTRICAL POLES (9M AND 11M) ARE INSTALLED ADJACENT TO THESE FOOTPATHS. |
| 5 | Water Supply Including Drinking Water Facilities ELEVATED WATER TANK OF 125000 LTR CAPACITY FED BY 6 HP BORE WELL PUMPS IN REDUNDANCY ARRANGEMENT IS ALSO MADE FOR CHLORINE DOZING TO DISTRIBUTE PORTABLE WATER TO HOUSEHOLDS A NETWORK OF 2 INCH UPVC PIPES ARE LAID UNDER GROUND FOR WATER SUPPLY WITHIN THE TOWNSHIP. |
| 6 | Sewer System A NETWORK OF UNDERGROUND 6 INCH HUME PIPE HAVE BEEN LAID TO CARRY SEVERAGE FROM HOUSE HOLD TO STP PLACED WITHIN THE TOWNSHIP THE TOWNSHIP IS PLANNED AS A ZERO DISCHARGE DEVELOPMENT. DECENTRALIZED PACKAGED STPs OF 40 KLD EACH AS PER SECTOR ARE AS DETAIL ED IN PROJECT DPR ARE BEING COMMISSIONED. THESE PACKAGED STPs ARE BASED ON ANAEROBIC PROCESS TO BREAK-DOWN SEWER AND SLUDGE WASTE. |
| 7 | Drain ROOF TOP RUN OFF AND KITCHEN WASTE WATER IS DRAINED FROM ROAD AREAS AND HOUSEHOLDS THROUGH 6 INCH PVC PIPES WHICH ARE LAID UNDERGROUND DEPENDING UPON THE CLASSIFICATION OF WASTE WATER IT IS EVENTUALLY DRAINED INTO RAIN WATER HARVESTING PITS (4 NOS), SCREENING FILTERS OR ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP. |
| 8 | Parks PARKS AND GREEN AREA HAVE BEEN DEVELOPED WITHIN THE TOWNSHIP AS PER APPROVED MAP. THE TOWNSHIP HAS A PARKS EARMARKED FOR SENIOR CITIZENS WITH SPACE FOR YOGA AND SEATING ARRANGEMENT AND FLOWERING PLANTS AND SHRUBS. SIMILARLY A CHILDREN PARK WITH PLAY STATION AND WALK THROUGH FOUNTAIN HAS BEEN DEVELOPED A SPORT CENTER AS PER THE DENSITY NORMS OF THE TOWNSHIP. IT HAS BEEN DEVELOPED WITH CRICKET GROUND, FOOTBALL FIELD, BASKET BALL, VOLLEYBALL, BADMINTON COURT AND SWIMMING POOL. THIS SPORT CENTER DEVELOPED OVER 2.5 ACRE LAND AND OPEN AIR GYM IS MADE OVER 250 SQ MTR. LAND. |
| 9 | Tree Planting MORE THAN 700 TREES HAVE BEEN PLANTED WITHIN THE TOWNSHIP. AVENUE TREE SUCH AS GULMOHAR CHITWAN AND AMALTAS ETC. AND BUSHES AND HEDGES HAVE BEEN PLANTED IN HIERARCHICAL ORDER FLOWERING PLANTS AND EVERGREEN PLANTS HAVE BEEN PLANTED IN OPEN AREAS, PARKS AND OTHER INSTALLATION. |
| 10 | Design For Electric Supply Including Street Lighting ELECTRIC POLES WITH LED STREET LIGHTS ARE PLACED AT 60 FT TO 80 FT INTERVAL. EACH STREET LIGHT INSTALLED WITH WATTAGE OF 100 WATT OR 200 WATT AS PER REQUIREMENT A TOTAL OF OVER 250 SUCH STREETS HAVE BEEN INSTALLED WITHIN THE TOWNSHIP. |
| 11 | Community Buildings CONSTRUCTION OF COMMUNITY HALL/FUNCTION HALL, MULTI PURPOSE HALL WITH KITCHEN HAS BEEN CONSTRUCTED OVER A PLOT SIZE OF 600 SQ MTR (INCLUDING PARKING). THE BUILDING ALSO HOUSES A MODERN GYM AND INDOOR GAMES ROOM. |
| 12 | Treatment and Disposal System of Sewage and Sullage water DECENTRALIZED PACKAGED STPs 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLDS THROUGH UNDERGROUND SERVICES PIPE TO THE SPTs THE TREATED WATER FROM THE STP USED TO IRRIGATION OR SENT TO THE ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP. |
| 13 | Solid Waste Management And Disposal System DECENTRALIZED PACKAGED STPs 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. THESE STPs WORK ON ANAEROBIC PROCESS TO BREAK-DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GRAY WATER. THE FILTERED WATER USED FOR IRRIGATION AND WASHING ROADS( POLLUTION CONTROL). |
| 14 | Water Conservation System RAIN WATER HARVESTING SYSTEM HAS BEEN DEVELOPED AT FOUR LOCATIONS WITHIN THE TOWNSHIP AND STIPULATED NOC FROM GROUND WATER DEPARTMENT HAS BEEN RECEIVED. RWH PITS OF 50 CuMT, 35 CuMT, 65 CuMT, 40CuMT, ALONG WITH FILTERS HAS BEEN DEVELOPED FOR THE TOWNSHIP. |
| 15 | Energy Management System Including Use of Renewable Energy THE TOWNSHIP HAS SANCTIONED LOAD OF 1558 KW FROM PuVVNL PRAYAGRAJ. INDIVIDUAL HOUSEHOLDS ARE SUPPLIED WITH ELECTRICAL CONNECTION FROM THE DEPARTMENT. FIVE SOCIETY CONNECTION RANGING FROM 5 KW TO 10 KW HAVE BEEN TAKEN FOR DIFFERENT PURPOSES WITHIN THE TOWNSHIP SUCH AS STREET LIGHT, PUMP ROOM, TEMPLE AND COMMON AREA ETC. |
| 16 | Fire Protection And Fire Safety System REQUISITE FIRE PROTECTION SYSTEM HAS BEEN DEVELOPED AS PER REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE REQUIREMENT OF FIRE PROTECTION IS LIMITED. HOWEVER 10 FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED AT VARIOUS ACCESSIBLE AREAS. EVACUATION AREA HAVE BEEN EARMARKED AT FIVE LOCATION WITHIN THE TOWNSHIP. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services STIPULATED IN THE INTEGRATED TOWNSHIP POLICY LAND HAS BEEN EARMARKED AND PROVISION HAS BEEN MADE FOR NURSING HOMES, SCHOOL ETC. WITHIN THE TOWNSHIP WHERE RESIDENT CAN AVAIL SERVICES ON PAYMENT BASIS. |
| 18 | Emergency Evacuation Services FIVE NUMBERS EMERGENCY EVACUATION AREAS HAVE BEEN EARMARKED IN OPEN SPACES SUCH AS PARKS AND TOT-LOTS. WITH A CAPACITY TO HOLD MINIMUM 100 PERSONS AT A TIME IN CASE OF REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE NEED FOR SUCH SERVICES ARE MINIMAL. |
| 19 | Other Miscellaneous Work UNDER THE INTEGRATED TOWNSHIP POLICY OF THE UP GOVERNMENT. DETAILED PROJECT REPORT (DPR)HAS BEEN APPROVED BY PRAYAGRAJ DEVELOPMENT AUTHORITY AND DEVELOPMENT AGREEMENT HAS BEEN SIGNED WITH PDA. ALL DEVELOPMENT NORMS, RULES AND COMMITMENTS MADE IN THE DEVELOPMENT AGREEMENT ARE BEING ADHERED TO. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Jan 2029.
Sanctioned by Prayagraj(Allahabad) Development Authority · 4,970 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 02/O.C.(T.C.)/ZONE-5/INTEGRATED/DEV.AUTH/2023-24/DATED 10/01/2024 | 10 Jan 2024 | 9 Jan 2029 | 9 Jan 2029 | 1 Jan 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
22 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1027 | 855 | Khasra |
| 1028 | 1030 | Khasra |
| 1032 | 230 | Khasra |
| 1033 | 285 | Khasra |
| 1042 | 740 | Khasra |
| 1043 | 610 | Khasra |
| 1044 | 700 | Khasra |
| 1085 | 520 | Khasra |
| Registry document · 1992 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2304 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2785 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5441 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2058 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7422 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8445 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6523 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11694 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11697 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 412 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9306 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9304 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10702 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10704 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10705 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11344 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11342 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 11343 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1307 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1308 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3540 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · BAHI4/JILD601/PAGE229-258/SR102 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Jul 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Jul 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 8 Aug 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Jul 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Jul 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Jul 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Jul 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 17 Jul 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 17 Jul 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Jul 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Jul 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Jul 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 8 Aug 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 17 Jul 2024 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2025-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | CITIZEN HOUSING AND DEVELOPING COOPERATIVE SOCIETY |
| Role | Promoter · current |
| RERA ID | UPRERAPRM9349 |
| PAN | AABAC2680A |
| CIN / TAN | ALDC01082E |
| Registered address | SAHYOG BHAWAN, 1 MG MARG, CIVIL LINES, ALLAHABAD |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ABHIYAAN BUILDCON PRIVATE LIMITED |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM7626 |
| Applicant type | Company |
| PAN | AAGCS9845J |
| CIN / TAN | U45202UP1989PTC010507 |
| Name of chairman | ANUBHAV VERMA |
| Registered address | 14 IBRAHIMPUR, MAZRA KATKA, JHUNSI, NEAR INDIAN OIL TRIVENIPURAM, ALLAHABAD |
| RERA contact | |
| Registered since | 2017 |
| Legal name | CITIZEN INFRAVENTURES PVT LTD |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM9344 |
| Applicant type | Company |
| PAN | AAFCC8707J |
| CIN / TAN | ALDCO1140G |
| Name of chairman | NISHITH VERMA |
| Registered address | A/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India |
| RERA contact | |
| Registered since | 2017 |
| Legal name | FAIR VALUE HOMES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | CHAK HARIHAR BAN JHUNSI ALLAHABAD UP 211019 |
| RERA contact |
Nearby projects
Prayagraj
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | CITIZEN HOUSING DEV COSO-COLLECTION AC FOR NEWSUNCITY EXT-P3BankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12 KP KAKKAR ROAD PRAYAGRAJ -211003Branch districtPrayagrajA/C no.IFSCIDIB000A580Branch emaila580@indianbank.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | CITIZEN HOUSING DEV COSO-SEPARATE AC FOR NEW SUNCITY EXT-P3BankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12 KP KAKKAR ROAD PRAYAGRAJ 211003Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | CITIZEN HOUSING DEV COSO TRANSACTION AC FOR NEWSUNCITY EXT-P3BankINDIAN BANKBranchHINDI SAHITYA SAMMELAN BRANCHBranch address12 KP KAKKAR ROAD PRAYAGRAJ 211003Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about NEW SUNCITY EXT-P3
Is NEW SUNCITY EXT-P3 RERA registered?
Yes. NEW SUNCITY EXT-P3 is registered with UPRERA under registration number UPRERAPRJ907325, registered on 5 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.
Has NEW SUNCITY EXT-P3 been completed?
UPRERA still lists NEW SUNCITY EXT-P3 as Registered, so it is not shown as completed here. A completion certificate dated 31 May 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of NEW SUNCITY EXT-P3?
CITIZEN HOUSING AND DEVELOPING COOPERATIVE SOCIETY is the promoter entity that filed NEW SUNCITY EXT-P3 with UPRERA (promoter RERA ID UPRERAPRM9349). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does NEW SUNCITY EXT-P3 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is NEW SUNCITY EXT-P3 located?
NEW SUNCITY EXT-P3 is registered in JHUNSI, Prayagraj, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗