CITIZEN EWS LIG HOUSING SCHEME

UPRERARegistered

CITIZEN EWS LIG HOUSING SCHEME is a RERA-registered residential project by ABHIYAAN BUILDCON PRIVATE LIMITED in Prayagraj (RERA ID UPRERAPRJ781821). Registered with a completion deadline of 19 Dec 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ781821
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start20 Sept 2021
Project duration39 months
AddressPhulpur, Prayagraj
TehsilPhulpur
Applicant typeCompany
Applicant address14 IBRAHIMPUR, MAZRA KATKA, JHUNSI, NEAR INDIAN OIL TRIVENIPURAM, ALLAHABAD
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    02/O.C.(T.C.)/ZONE-5/INTEGRATED/DEV AUTH/2020-21

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Oct 2021
Original completion19 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary5 Jun 2024
Registration fee₹17,500
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors112 · 6 · 4 (units from plan)
ConfigurationUnitsCarpet area
1 BHK11226-31
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EWS TOWER A · 1 BHK41626
EWS TOWER B · 1 BHK41626
EWS TOWER C · 1 BHK42426
LIG TOWER A · 1 BHK41631
LIG TOWER B · 1 BHK41631
LIG TOWER C · 1 BHK42431
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANIL KUMAR GUPTA
License CA/89/12467
AKRITI ARCHITECT AND ENGINEERS K-1 PRAYAGRAJ STRACHY ROAD CIVIL LINES PRAYAGRAJ
Engineer
ER OMKAR VERMA
SPAN STRUCTURES 8/14 INDIRA NAGAR LUCKNOW UP
Contractor
RAJAN KUMAR BIND
MAHESHPUR ANDAWA JHUNSI PRAYAGRAJ
Sr.Development work declared to RERA
1Demarcation of Plots
NOT APPLICABLE
2Boundary Wall
BOUNDARY WALL COMPLETED WITH COLUMN WITH PILING AND 9 INCH BRICK WORK WITH COMPOUND LED LIGHT AND WHITE WASH
3Road Work
3 METER WIDE SET BACK ROAD MADE WITH CEMENT CONCRETE. APPROACH ROAD UP TO THE PROJECT MADE WITH INTERLOCKING PAVERS OVER WBM.
4Footpaths
NOT APPLICABLE
5Water Supply Including Drinking Water Facilities
FROM OVERHEAD WATER TANK SUPPLIED BY BOREWELL AS PER WATER SUPPLY PLAN ATTACHED UNDER UPLOAD DOCUMENT SECTION
6Sewer System
SEWAGE TREATMENT PLANT (STP) WILL BE SETUP. SEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICED PLAN OF THE PROJECT
7Drain
PROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES BEING UPLOADED
8Parks
GREEN AREA AS PER APPROVED MAP
9Tree Planting
30 NOS (15 ASHOK TREE AND 15 CHITWAN TREE)
10Design For Electric Supply Including Street Lighting
INFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL. PROJECT ELECTRIC PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION.
11Community Buildings
NOT APPLICABLE AS PER EWS LIG POLICY
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE TREATMENT PLANT AND DRAINAGE SYSTEM WILL BE SETUP. DETAILS OF THE PLAN HAS BEEN PROVIDED IN UNDER THE SERVICES PLAN HAS BEEN ATTACHED UNDER UPLOAD DOCUMENT SECTION
13Solid Waste Management And Disposal System
WILL BE PROVIDED AS PER NAGAR NIGAM NORMS. DETAILS OF THE PLAN HAS BEEN PROVIDED IN THE SERVICES PLAN IT HAS BEEN ATTACHED IN THE UPLOAD SECTION
14Water Conservation System
RAIN WATER HARVESTING WILL BE PROVIDED AS APPROVED LOCATION AFTER THE COMPLETION OF PROJECT AND APPLICABLE NOC FROM THE BHU JAL GARBH VIBHAG WILL BE TAKEN
15Energy Management System Including Use of Renewable Energy
50 WATT SOLAR STREET LIGHT WILL BE PROVIDED WITHIN THE COMPOUND AT DESIRED LOCATION AS PER ARCHITECT INSTRUCTION
16Fire Protection And Fire Safety System
AS APPLICABLE UNDER FIRE SAFETY NORMS. FIRE EXTINGUISHER AND HOSE REEL WILL BE PROVIDED IN ALL FLOOR. FIRE HYDRANT WILL BE PROVIDED IN SUITABLE LOCATION FOR EASY ACCESS BY FIRE TENDER
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
AS PER APPLICABLE NORMS OF FIRE DEPARTMENT. ASSEMBLY POINT WILL BE PROVIDED IN DESIGNATED AREA
19Other Miscellaneous Work
AS APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2026.

Sanctioned by Allahabad Development Authority · 2,492 sqm of land · an approved plan of 6 blocks and 112 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
02/O.C.(T.C.)/ZONE-5/INTEGRATED/DEV AUTH/2020-2127 Feb 202126 Feb 202626 Feb 202619 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
10913740Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 2809
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi4/jild50/pg77to94/sno93
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · AffidavitUP96839305896228T
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Oct 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Oct 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Oct 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Oct 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New25 Oct 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Oct 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New25 Oct 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Oct 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Oct 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Oct 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New25 Oct 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New25 Oct 2021 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2024-Q2.

QuarterConstructionCertificates
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameABHIYAAN BUILDCON PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM7626
PANAAGCS9845J
CIN / TANU45202UP1989PTC010507
Name of chairmanANUBHAV VERMA
Registered address14 IBRAHIMPUR, MAZRA KATKA, JHUNSI, NEAR INDIAN OIL TRIVENIPURAM, ALLAHABAD
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ABHIYAAN BUILDCON PVT LTD RERA COLLECTION AC FOR CITIZEN EWS LIG HOUSING SCHEMEBankINDIAN BANKBranchCIVIL LINES PRAYAGRAJBranch address22 PD TONDON RAA/C no.IFSCIDIB000C629
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ABHIYAAN BUILDCON PVT LTD RERA SEPERATE AC FOR CITIZEN EWS LIG HOUSING SCHEMEBankBANK OF BARODABranchALLAHAPUR PRAYAGRAJBranch address23/47/14A MATIYARA ROAD BHARDWAJ PURAM ALLAHPUR PRAYAGRAJBranch districtAllahabaadA/C no.IFSCBARB0ALLALL
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ABHIYAAN BUILDCON PVT LTD RERA TRANSACTION AC FOR CITIZEN EWS LIG HOUSING SCHEMEBankBANK OF BARODABranchALLAHPUR PRAYAGRAJBranch address23/47/14A MATIYARA ROAD BHARDWAJ PURAM ALLAHPUR PRAYAGRAJA/C no.IFSCBARB0ALLALL
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CITIZEN EWS LIG HOUSING SCHEME

Is CITIZEN EWS LIG HOUSING SCHEME RERA registered?

Yes. CITIZEN EWS LIG HOUSING SCHEME is registered with UPRERA under registration number UPRERAPRJ781821, registered on 30 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has CITIZEN EWS LIG HOUSING SCHEME been completed?

UPRERA still lists CITIZEN EWS LIG HOUSING SCHEME as Registered, so it is not shown as completed here. A completion certificate dated 5 Jun 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of CITIZEN EWS LIG HOUSING SCHEME?

ABHIYAAN BUILDCON PRIVATE LIMITED is the promoter entity that filed CITIZEN EWS LIG HOUSING SCHEME with UPRERA (promoter RERA ID UPRERAPRM7626). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CITIZEN EWS LIG HOUSING SCHEME have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CITIZEN EWS LIG HOUSING SCHEME located?

CITIZEN EWS LIG HOUSING SCHEME is registered in Prayagraj, as filed with UPRERA.

What configurations are available in CITIZEN EWS LIG HOUSING SCHEME?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CITIZEN EWS LIG HOUSING SCHEME?

The approved unit plan filed with UPRERA runs from 26 to 31 m² of carpet area (about 277 to 335 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CITIZEN EWS LIG HOUSING SCHEME?

The approved unit plan describes 6 blocks and 112 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CITIZEN EWS LIG HOUSING SCHEME?

About 182 units per acre: 112 planned units across 0.62 acres (2,492 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗