CITIZEN TWIN TOWERS

UPRERARegistered

CITIZEN TWIN TOWERS is a RERA-registered residential project by CITIZEN INFRAVENTURES PVT LTD in Mauja- Maheshpur, Pargana-Jhunsi, Prayagraj (RERA ID UPRERAPRJ707993). Registered with a completion deadline of 27 Mar 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ707993
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryPrayagraj(Allahabad) Development Authority
Proposed start4 Apr 2026
Project duration60 months
AddressARAZI NO. 3,4,6,7,8,9,10,11,12,13Ka, 14 & 15, Mauja- Maheshpur, Pargana-Jhunsi, Phulpur, Prayagraj
TehsilPhulpur
Applicant typeCompany
Applicant addressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/05683/PDA/BP/25-26/1099/27032026

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 May 2026
Original completion27 Mar 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹53,000
Sanctioning authorityPrayagraj(Allahabad) Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors241 · 3 · 16 (units from plan)
Homes · commercial units231 · 10 (shops and offices filed in the same plan)
  • 3 BHK110 46%
  • 2 BHK96 40%
  • 4 BHK16 7%
  • SHOP10 4%
  • 5 BHK9 4%
ConfigurationUnitsCarpet area
3 BHK110120-121
2 BHK9691-94
4 BHK16174-175
5 BHK9235-242
SHOP1017
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK-A · 3 BHK, 2 BHK1612891-121
BLOCK-B · 4 BHK, 3 BHK, 5 BHK16103120-242
BLOCK-C · SHOP21017
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AKHILESHWAR SINGH
License CA/1994/16740
49/G-7, LOTUS APARTMENT, TASHKEND MARG, CIVIL LINES, PRAYAGRAJ-211001
Engineer
AKHILESH KUMAR SINGH
D-27, INDIRA NAGAR, LUCKNOW
Contractor
LAVKUSH MISHRA
207/8, BENIGANJ, PRAYAGRAJ, UTTAR PRADESH- 211016
Sr.Development work declared to RERA
1Demarcation of Plots
The project is proposed on clear, continuous and open plot measuring 9510 Sq. Mts, bounded by a 5 Ft. boundary wall (Constructed almost 20 years ago). The plot is abutting a 18 mtr. wide masterplan road with 145 ft. frontage.
2Boundary Wall
Boundary wall for the project will be constructed up to 2 mtr height with 230mm thick brick work supported by RCC work in columns and beams. Compound light will be placed on of columns and planters will be constructed to house decorative shrubs and flowering plants. Barbed wire will be installed on the top the boundary for added security.
3Road Work
The setback roads of the project are 11 mtr and 13.5 mtr wide. Commencing from the main gate internal setback roads of the entire project will be constructed with RCC using M25 concrete.
4Footpaths
Pedestrian footpath (1 Mtr Wide) or walking track will be constructed along the building setback for the ease of the residents. It will be raised by 100mm from the ground and finished with chequered/anti-skid cement tiles.
5Water Supply Including Drinking Water Facilities
Underground track (2 Nos. of the 25000 Liter each) will be used to supply water from two borewells to overhead water tank supplemented by Nagar Nigam supply as per service plan of the project. Each residential tower will have 4 OHTs. All tank will be coated with food grade coating in the inside and OTHs will have provision for heat insulation with air gap and additional brick work.
6Sewer System
Sewer system plan will be prepared as per service plan of the project and connected trunk Nagar Nigam sewer line. Down SWR pipe from residential unit will be of 110mm along with 2x2 Ft. manhole chamber will be provided. A 150 kld STP based on MBBR technology is proposed to be constructed for the project.
7Drain
Proper drainage network will be provided as per service plan being uploaded. Down PVC pipes from residential units and terrace (Rain Water) will be of150mm dia. Underground storm water drains will be provided for road run-off and from landscape areas. These 150mm pipe will be connected to the RWH pits (45 Cubic Meter capacity) to be constructed within the project.
8Parks
Over 980 Sq. Mtr. of green area is proposed to be developed within the project. Such green area will be developed with tree plantation and flowering plants and evergreen shrubs along with small waterbody and fountain to be developed. The green area will have park benches and sit out gazebo, outdoor lighting. Kids play area will be developed with play station.
9Tree Planting
Over 50 Nos trees will be planted within the project. Selection of trees will be flowering and fruiting type along with native shrubs, bushes and hedges. The trees will be planted along the boundary as well as green areas.
10Design For Electric Supply Including Street Lighting
Infrastructure will be developed as per PuVVNL with independent feeder. As per expected load of the project 4 Nos. transformer (400KVA, 400KVA, 250KVA, 250KVA) will be installed subject to the final sanctioned load for the project. Armoured cable 240mm will be used to supply from transformer to busbar subsequently 16mm and 10mm cable will be used connect electrical meter to flat main supply. Street light of 200 watt and LED compound light of 12 Watts will be provided throughout the campus along with solar street light at important points. Generator power backup infrastructure will be provided for common areas.
11Community Buildings
A multipurpose hall is proposed in separate Block- C for the benefit of the residents which can used for banquets and gathering. The area of this hall is 2500 sq. ft. The block will also have a basement to be used for store. The top floor of Block-C will have a well equiped Gym and Indoor games area along with a Swimming pool of 110 Sq. Mts.
12Treatment and Disposal System of Sewage and Sullage water
Sewage and Drainage system will be setup as per norm defined by PDA and Nagar Nigam. A 150kld STP base on MBBR Technology has been proposed for the project. Sullage and sewage waste will be taken to the STP with 110mm SWR pipes and 200/250mm PVC main lines connected with 2X2 ft manholes. Detailed drawing of such infrastructure will be presented along with completion drawing.
13Solid Waste Management And Disposal System
Garbage collection bins with easy access is being proposed at the project. within the project as per norms 3 nos dustbin enclosures shall be provided (15 Sq. Mt. each). Each such enclosure will be colour coded marked to collect Type A. Bio-degradable watstes (Green), Type-B, E-wastes (Black), Type C. Plastic and metal waste (Blue). The colour coded dustbins are marked on the approved map of the project.
14Water Conservation System
Rain water harvesting will be provided as per the approved drawing of the project. Upon completion of the project as per norms and NOC will be taken from BHU Jal Garbh Vibhag. Rain water harvesting pit will be develope)d at two locations within the premises with total capacity = 45 cubic mtr. which will be suffice for the roof top run-off of the proposed towers.
15Energy Management System Including Use of Renewable Energy
Conventional energy management and efficient use along with use of renewable energy will be engaged at suitable location within the project. The project is envisioned with optimum use of solar power. (Solar panel of 10 KW with solar inverter will be provided for common area usage). Common area lighting in corridor will be LED based. Rain water harvesting, EV Charging along with day time lighting using maximum sunlight among other initiatives.
16Fire Protection And Fire Safety System
The project has been granted prvisional NOC by the fire department, All condition laid down in the attached NOC will be adhere to. As applicable under fire safety norms fire extinguisher and hose reel along with fire alarm will be provided. MS pipe of 150mm B-Class along with 100mm,32mm and 25mm diameter along with butterfly valve 150mm and 100mm will be used. Pressure gauge air valve 25mm will be provided. Hose reel set 30mtr and hydrant valve 63mm SS, RRL Hose 15 mtr. SS along with the hose box cabinet will be provided. 2nos fire pump 360mm terrace pump along with starter panel will be provided in each tower. Fire alarm system with PA. Fire Extinguisher ABC type 6 KG= 100 Nos and CO2 type 4.5 KG= 50 Nos will be provided. Automated water sprinkler pendent type will be used in basement and all residential units. Fire tower with fire rated doors and fire rated lift will be provided as shown in approved map of the project. Emergency lights will be installed on residential floors.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Project is located in the Nagar Nigam area and in close proximity to public and private hospitals, schools, police station and other social and public amenities and emergency services.
18Emergency Evacuation Services
As per norms of the fire department and provisional NOC provided by the fire department designated 2 Nos. assembly point (2000 sq. ft. each) will be developed within the project to enable evacuation in case of emergency. Both towers have fire escape stairs and fire tower with fire rated doors/emergency exit.
19Other Miscellaneous Work
64 Nos. CCTV Camera in the campus- common areas, boom barrier at the entry gate will be installed. EPBAX will be installed in the residential flats, a mandir will be constructed for the welfare of the society. Other miscellaneous works will be carried out as per instruction from project architect, MEP consultant, other consultant and development authority.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 27 Mar 2031.

Sanctioned by Prayagraj(Allahabad) Development Authority · 9,510 sqm of land · an approved plan of 3 blocks and 241 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/05683/PDA/BP/25-26/1099/2703202628 Mar 202627 Mar 203127 Mar 203427 Mar 2031
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Arazi No. 3460Khasra
Arazi No.41720Khasra
Arazi No.6580Khasra
Arazi No.7570Khasra
Arazi No.8690Khasra
Arazi No.9570Khasra
Arazi No.102800Khasra
Arazi No11560Khasra
Arazi No.12460Khasra
Arazi No.13Ka200Khasra
Arazi No.14420Khasra
Arazi No.15480Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Bahi No. 01 Vol No. 2527 Page No. 387 to 410 Document No. 452 Dated 08/02/2008
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi No.01 Vol No. 1050 Page No. 71 to 100 Document No. 4677
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi No.01 Vol No. 1068 Page No. 75 to 104 Document No. 5223
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi No.01 Vol No. 1055 Page No. 183 to 212 Document No. 4846
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017, to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · Bahi No. 01 Vol No. 11740 Page No. 1 to 88 Document No. 3602
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430 (01July,2017 to 30June,2023)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · Bahi No 1 Vol No. 11819 Page No 369 to 382 Document No.5261
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New8 Apr 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Apr 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New8 Apr 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New8 Apr 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Apr 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Apr 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Apr 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Apr 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New8 Apr 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New8 Apr 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New8 Apr 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Apr 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New13 May 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New8 Apr 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q10.23%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCITIZEN INFRAVENTURES PVT LTD
RolePromoter · current
RERA IDUPRERAPRM9344
PANAAFCC8707J
CIN / TANALDCO1140G
Name of chairmanNISHITH VERMA
Registered addressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameSHEO PRATAP SINGH
RoleCo-promoter
Applicant typeIndividual
Address82D, C.Y. Chintamani Road, George Town, Dahiawan, District Prayagraj
RERA contact
Legal nameRAHUL SINGH
RoleCo-promoter
Applicant typeIndividual
Address82D, C.Y. Chintamani Road, George Town, District Prayagraj
RERA contact
Legal nameROHIT SINGH
RoleCo-promoter
Applicant typeIndividual
Address82D, C.Y. Chintamani Road, George Town, District Prayagraj
RERA contact

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURES COLLECTION A/C FOR CITIZEN TWIN TOWERSBankIndian BankBranchHindi Sahitya Sammelan BranchBranch address12, K P Kakkar Road, Prayagraj 211003Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580Branch emaila580@indianbank.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURES SEPARATE A/C FOR CITIZEN TWIN TOWERSBankIndian BankBranchHindi Sahitya Sammelan BranchBranch address12 K P, KAKKAR ROAD, PRYAGRAJ-211003Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
CITIZEN INFRAVENTURES RERA TXN A/C FOR CITIZEN TWIN TOWERSBankIndian BankBranchHindi Sahitya Sammelan branchBranch address12 K P KAKKAR ROAD, PRAYAGRAJ-211003Branch districtPrayagraj, Uttar PradeshA/C no.IFSCIDIB000A580
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CITIZEN TWIN TOWERS

Is CITIZEN TWIN TOWERS RERA registered?

Yes. CITIZEN TWIN TOWERS is registered with UPRERA under registration number UPRERAPRJ707993, registered on 26 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CITIZEN TWIN TOWERS?

The completion date filed with UPRERA is 27 Mar 2031. No completion certificate is on record yet.

Who is the builder of CITIZEN TWIN TOWERS?

CITIZEN INFRAVENTURES PVT LTD is the promoter entity that filed CITIZEN TWIN TOWERS with UPRERA (promoter RERA ID UPRERAPRM9344). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CITIZEN TWIN TOWERS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CITIZEN TWIN TOWERS located?

CITIZEN TWIN TOWERS is registered in Mauja- Maheshpur, Pargana-Jhunsi, Prayagraj, as filed with UPRERA.

What configurations are available in CITIZEN TWIN TOWERS?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 4 BHK, 5 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CITIZEN TWIN TOWERS?

The approved unit plan filed with UPRERA runs from 17 to 242 m² of carpet area (about 185 to 2,607 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CITIZEN TWIN TOWERS?

The approved unit plan describes 3 blocks and 241 units of which 231 are homes and 10 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CITIZEN TWIN TOWERS?

About 103 units per acre: 241 planned units across 2.35 acres (9,510 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗