Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad is a RERA-registered residential project by Ghaziabad Development Authority in Ghaziabad (RERA ID UPRERAPRJ941043). Registered with a completion deadline of 31 Dec 2024.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ941043 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 20 Dec 2019 |
| Project duration | 61 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Competent authority |
| Applicant address | Vikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
751/4/EEzone-4/2019-20
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 17 Oct 2022 |
| Original completion | 31 Dec 2024 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,68,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 720 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TOWER 1 · 1 BHK | 4 | 48 | 23 |
| TOWER 10 · 1 BHK | 4 | 48 | 23 |
| TOWER 11 · 1 BHK | 4 | 48 | 23 |
| TOWER 12 · 1 BHK | 4 | 48 | 23 |
| TOWER 13 · 1 BHK | 4 | 48 | 23 |
| TOWER 14 · 1 BHK | 4 | 48 | 23 |
| TOWER 15 · 1 BHK | 4 | 48 | 23 |
| TOWER 2 · 1 BHK | 4 | 48 | 23 |
| TOWER 3 · 1 BHK | 4 | 48 | 23 |
| TOWER 4 · 1 BHK | 4 | 48 | 23 |
| TOWER 5 · 1 BHK | 4 | 48 | 23 |
| TOWER 6 · 1 BHK | 4 | 48 | 23 |
| TOWER 7 · 1 BHK | 4 | 48 | 23 |
| TOWER 8 · 1 BHK | 4 | 48 | 23 |
| TOWER 9 · 1 BHK | 4 | 48 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Available |
| 2 | Boundary Wall to be constructed |
| 3 | Road Work to be constructed |
| 4 | Footpaths to be constructed |
| 5 | Water Supply Including Drinking Water Facilities to be laying of water line |
| 6 | Sewer System to be laying sewer line and conceted existing trunk sewer line |
| 7 | Drain to be constructed internal drain and meet with existing main drain |
| 8 | Parks to be constructed |
| 9 | Tree Planting to be plantation |
| 10 | Design For Electric Supply Including Street Lighting to be laying |
| 11 | Community Buildings Not applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Jal nigam sewer line already laid |
| 13 | Solid Waste Management And Disposal System Not applicable |
| 14 | Water Conservation System to be laid |
| 15 | Energy Management System Including Use of Renewable Energy Not applicable |
| 16 | Fire Protection And Fire Safety System Not applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not applicable |
| 18 | Emergency Evacuation Services Not applicable |
| 19 | Other Miscellaneous Work Not applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 31 Dec 2022.
Sanctioned by Ghaziabad Development Authority · 32,671 sqm of land · an approved plan of 15 blocks and 720 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 751/4/EEzone-4/2019-20 | 12 Dec 2019 | 31 Dec 2022 | 31 Dec 2024 | 31 Dec 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 315/1, 315/2, 315M/3 | 19602.00 | Khasra |
| Khatauni extract · 1429-1434 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 2 Mar 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 2 Mar 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Mar 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 2 Mar 2022 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 2 Mar 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Sept 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Sept 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Sept 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 19 Sept 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Sept 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 19 Sept 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 19 Sept 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 19 Sept 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 19 Sept 2022 ↗ |
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 70% | Arch ↗ · Eng ↗ |
| 2024-Q1 | 80% | Arch ↗ · Eng ↗ |
| 2024-Q2 | 85% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 85% | Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Ghaziabad Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM11404 |
| PAN | AAALG0072C |
| CIN / TAN | MRTG00108D |
| Registered address | Vikas Path, Near Purana Bus Adda, Hapur Road, Ghaziabad 201001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | VC GDA COLLECTION/ESCROW ACCOUNT PRATAP VIHAR YOJNABankBank of BarodaBranchGDA Extension, GDABranch addressGDA office, vikas path, ghaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCBARB0VJGHDA |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | VC GDA SEPARATE ACCOUNT PRATAP VIHAR YOJANA 720 EWSBankBank of BarodaBranchNavyug marketBranch addressGhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCBARB0VJGHAZ |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | VC GDA TRANSACTION ACCOUNT PRATAP VIHAR YOJANA 720 EWSBankBank of BarodaBranchnavyug marketBranch addressGhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCBARB0VJGHAZ |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad
Is Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad RERA registered?
Yes. Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad is registered with UPRERA under registration number UPRERAPRJ941043, registered on 17 Oct 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad?
The completion date filed with UPRERA is 31 Dec 2024. No completion certificate is on record yet.
Who is the builder of Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad?
Ghaziabad Development Authority is the promoter entity that filed Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad with UPRERA (promoter RERA ID UPRERAPRM11404). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad located?
Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad?
The approved unit plan describes 15 blocks and 720 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Construction 720 EWS (G+3) Houses under PMAY Scheme at Pratap Vihar Scheme, Sec-11 Ghaziabad?
About 89 units per acre: 720 planned units across 8.07 acres (32,671 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗