Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut.
Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Meerut (RERA ID UPRERAPRJ17335). Registered with a completion deadline of 29 Dec 2020.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ17335 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Jan 2019 |
| Project duration | 24 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
377/AP-1/dt 24-7-2018
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 18 Aug 2018 |
| Original completion | 30 Jun 2020 |
| Revised completion | 29 Dec 2020 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 13 Jan 2021 |
| Registration fee | ₹99,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Approved Layout Plan |
| 2 | Boundary Wall N/A |
| 3 | Road Work As per Approved Layout Plan |
| 4 | Footpaths N/A |
| 5 | Water Supply Including Drinking Water Facilities As per Approved Layout Plan |
| 6 | Sewer System As per Approved Layout Plan |
| 7 | Drain As per Approved Layout Plan |
| 8 | Parks As per Approved Layout Plan |
| 9 | Tree Planting N/A |
| 10 | Design For Electric Supply Including Street Lighting As per Approved Layout Plan |
| 11 | Community Buildings As per Approved Layout Plan |
| 12 | Treatment and Disposal System of Sewage and Sullage water Final Disposal to STP |
| 13 | Solid Waste Management And Disposal System N/A |
| 14 | Water Conservation System N/A |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per Approved Layout Plan |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work N/A |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 23 Jul 2023.
Sanctioned by U.P. Awas Evam Vikas Parishad · 18,900 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 377/AP-1/dt 24-7-2018 | 24 Jul 2018 | 23 Jul 2023 | 23 Jul 2026 | 30 Jun 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2020.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2020 | 29 Dec 2020 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 328,329,330,331,332,333,334,335,357,358,359,360 | 50786 | Khasra |
| Allotment letter from the authority · 1398 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 10 Aug 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 10 Aug 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 10 Aug 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Aug 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Aug 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Aug 2018 ↗ |
Quarterly progress reports
3 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
3 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2020-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | EXECUTIVE ENGINEER C.D-5 MEERUT 45/75 TYPEBankINDUSIND BANKBranchTYAGI MARKET, GARH ROAD MEERUTA/C no.IFSCINDB0000410 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut.
Is Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. RERA registered?
Yes. Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. is registered with UPRERA under registration number UPRERAPRJ17335, registered on 18 Aug 2018. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. been completed?
UPRERA still lists Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. as Registered, so it is not shown as completed here. A completion certificate dated 13 Jan 2021 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut.?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. more time to complete?
UPRERA's record carries 1 completion extension for Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut., the latest running to 29 Dec 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. located?
Construction of 252 Nos 45/75 type Semi Finished Houses in Sector-5 at Jagriti Vihar Extension Scheme No-11 Meerut. is registered in Meerut, as filed with UPRERA.