Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut

UPRERARegistered

Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut (RERA ID UPRERAPRJ718777). Registered with a completion deadline of 14 Jun 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
100%Q3'25
100%Q4'25
100%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ718777
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start15 Jun 2024
Project duration24 months
AddressSector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut, Meerut
TehsilMeerut
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2732

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered7 May 2024
Original completion14 Jun 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary1 Sept 2026
Registration fee₹11,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Dev Arya
License NA
office of The Architect and Planning Unit 5 UPAVP Nilgiri Copmlex Indra Nagar Lucknow
Engineer
Sandeep Kumar
Office of The Executive Engineer Construction Division Meerut 03 UPAVP Meerut
Contractor
NA
NA
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcated by RCC flag stone in located area
2Boundary Wall
NA
3Road Work
102.84 Metre Long 9.00 M wide Road already constructed by WMM, BM and SDBC in located area
4Footpaths
Footpath constructed by I Shaped interlocking Cement Concrete Paver Blocks
5Water Supply Including Drinking Water Facilities
102.84 Metre Lenth Water supply line 100mm dia, 150 mm dia, 200mm dia PVC Pipe already laid in whole area, water supply by OHT at Sector 5
6Sewer System
102.84 Metre Lenth Sewer Line 250 mm NP-3 RCC Hume Pipe, already laid and jointed to the trunk sewer line
7Drain
205.68 Metre Lenth CK type drains already constructed Class M-150 bricks and cement mortar and Three Culvert also constructed in RCC 1, 1.5 ,3 complete in all respect
8Parks
03 nos Parks already constructed in sec 5 and one of these three park also located in front of proposed houses
9Tree Planting
Trees are planted under the scheme every year characteristics determined by the Govt
10Design For Electric Supply Including Street Lighting
Electricity Supply line already in working condition in located area and street light also
11Community Buildings
Community Center Proposed in Layout and Developed in Future
12Treatment and Disposal System of Sewage and Sullage water
Sewer Disposal by sewer treatment plant in parishad scheme STP
13Solid Waste Management And Disposal System
Disposal By UP Awas Vikas Parishad
14Water Conservation System
NA
15Energy Management System Including Use of Renewable Energy
Energy Management System including the use of Renewable Energy will be used by the installing solar power plants on the roof of Community Centres, power houses and other site offices to be constructed by UP Awas Vikas Parishad
16Fire Protection And Fire Safety System
For Fire Protection provision fire hydrants has been made in water supply line
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social Infrastructure and Other Public Amenities Including Public Health Services Provided in layout
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Aug 2024.

Sanctioned by U.P. Awas Evam Vikas Parishad · 1,192 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
273230 Aug 201929 Aug 202415 Feb 202714 Jun 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Sector-5 Scheme No 11 Jagriti Vihar Extension1092Plot
Sector-5 Scheme No 11 jagtiri Vihar Extension1092Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 738
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Apr 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New8 Jan 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New8 Jan 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New8 Jan 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New9 Jan 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New2 Apr 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Apr 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New2 Apr 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New2 Apr 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Apr 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Jan 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Jan 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Jan 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New9 Apr 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New8 Jan 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q3100%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP 19N HOU SEC5 JV EXT YJ11 MRT CLNACBankHDFC BANKBranchGarh Road Meerut Code-1911Branch addressSuryansh Palaza 171/1 Turu Kunj Garh Road Merrut UP 250004Branch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911Branch emailshekhard.gupta@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP 19N HOU SEC5 JV EXT YJ11 MRT SEPACBankHDFC BANKBranchGarh Road Meerut Code 1911Branch addressSuryansh Plaza 171/1 Taru Kunj Garh Road MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP 19N HOU SEC5 JV EXT YJ11 MRT TRNACBankHDFC BANKBranchGarh Road Meerut Code 1911Branch addressSuryansh Plaza 171/1 Taru Kunj Garh Road MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

15 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Actual completion2026-09-01
first recorded by Estanzo
5 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut

Is Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut RERA registered?

Yes. Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is registered with UPRERA under registration number UPRERAPRJ718777, registered on 7 May 2024. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut been completed?

UPRERA still lists Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut as Registered, so it is not shown as completed here. A completion certificate dated 1 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut located?

Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is registered in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗