Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut
Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut (RERA ID UPRERAPRJ718777). Registered with a completion deadline of 14 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ718777 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 15 Jun 2024 |
| Project duration | 24 months |
| Address | Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2732
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 7 May 2024 |
| Original completion | 14 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 1 Sept 2026 |
| Registration fee | ₹11,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcated by RCC flag stone in located area |
| 2 | Boundary Wall NA |
| 3 | Road Work 102.84 Metre Long 9.00 M wide Road already constructed by WMM, BM and SDBC in located area |
| 4 | Footpaths Footpath constructed by I Shaped interlocking Cement Concrete Paver Blocks |
| 5 | Water Supply Including Drinking Water Facilities 102.84 Metre Lenth Water supply line 100mm dia, 150 mm dia, 200mm dia PVC Pipe already laid in whole area, water supply by OHT at Sector 5 |
| 6 | Sewer System 102.84 Metre Lenth Sewer Line 250 mm NP-3 RCC Hume Pipe, already laid and jointed to the trunk sewer line |
| 7 | Drain 205.68 Metre Lenth CK type drains already constructed Class M-150 bricks and cement mortar and Three Culvert also constructed in RCC 1, 1.5 ,3 complete in all respect |
| 8 | Parks 03 nos Parks already constructed in sec 5 and one of these three park also located in front of proposed houses |
| 9 | Tree Planting Trees are planted under the scheme every year characteristics determined by the Govt |
| 10 | Design For Electric Supply Including Street Lighting Electricity Supply line already in working condition in located area and street light also |
| 11 | Community Buildings Community Center Proposed in Layout and Developed in Future |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer Disposal by sewer treatment plant in parishad scheme STP |
| 13 | Solid Waste Management And Disposal System Disposal By UP Awas Vikas Parishad |
| 14 | Water Conservation System NA |
| 15 | Energy Management System Including Use of Renewable Energy Energy Management System including the use of Renewable Energy will be used by the installing solar power plants on the roof of Community Centres, power houses and other site offices to be constructed by UP Awas Vikas Parishad |
| 16 | Fire Protection And Fire Safety System For Fire Protection provision fire hydrants has been made in water supply line |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social Infrastructure and Other Public Amenities Including Public Health Services Provided in layout |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Aug 2024.
Sanctioned by U.P. Awas Evam Vikas Parishad · 1,192 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2732 | 30 Aug 2019 | 29 Aug 2024 | 15 Feb 2027 | 14 Jun 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Sector-5 Scheme No 11 Jagriti Vihar Extension | 1092 | Plot |
| Sector-5 Scheme No 11 jagtiri Vihar Extension | 1092 | Khasra |
| Allotment letter from the authority · 738 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 9 Apr 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 8 Jan 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 8 Jan 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 8 Jan 2024 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 9 Jan 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 2 Apr 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 2 Apr 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 2 Apr 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 2 Apr 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 20 Apr 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Jan 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Jan 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Jan 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 9 Apr 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 8 Jan 2024 ↗ |
Quarterly progress reports
9 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP 19N HOU SEC5 JV EXT YJ11 MRT CLNACBankHDFC BANKBranchGarh Road Meerut Code-1911Branch addressSuryansh Palaza 171/1 Turu Kunj Garh Road Merrut UP 250004Branch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911Branch emailshekhard.gupta@hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP 19N HOU SEC5 JV EXT YJ11 MRT SEPACBankHDFC BANKBranchGarh Road Meerut Code 1911Branch addressSuryansh Plaza 171/1 Taru Kunj Garh Road MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP 19N HOU SEC5 JV EXT YJ11 MRT TRNACBankHDFC BANKBranchGarh Road Meerut Code 1911Branch addressSuryansh Plaza 171/1 Taru Kunj Garh Road MeerutBranch districtMeerut, Uttar PradeshA/C no.IFSCHDFC0001911 |
What has changed on this record
15 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Actual completion | 2026-09-01 first recorded by Estanzo | 5 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut
Is Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut RERA registered?
Yes. Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is registered with UPRERA under registration number UPRERAPRJ718777, registered on 7 May 2024. Estanzo reproduces that filing; it does not verify the work behind it.
Has Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut been completed?
UPRERA still lists Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut as Registered, so it is not shown as completed here. A completion certificate dated 1 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut located?
Construction of 31/63 Type 19 Nos Semi Finished Houses in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut is registered in Sector-5 Jagriti Vihar Extension Scheme No 11, Meerut, Meerut, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗