Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow

UPRERARegistered

Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ15287). Registered with a completion deadline of 12 May 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ15287
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start15 May 2018
Project duration48 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    UPHDB/APD/Unit-5/Avadh Vihar/PMAY/Sect-7A/259/2017

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Feb 2018
Original completion14 Nov 2020
Revised completion12 May 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 Jun 2022
Registration fee₹1,29,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors992 · 1 · 4 (units from plan)
ConfigurationUnitsCarpet area
OTHER99223
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Sector-7A · OTHER499223
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sanjeev Kashyap
License UPAVP
Neelgiri Complex, Indira Nagar, Lucknow
Engineer
Anoop Gupta
VAM Consulting Architect (P) Ltd. Swaroop Nagar, Kanpur
Contractor
(1) M/s Apex Construction Company (2) M/s Neel Construction (3) M/s Shagun Associates (4) M/S Shail Builders Contractor
(1) D-2/554 Sector-F, Jankipuram, Lucknow (2) B-4/68K Vineet Khand, Gomti Nagar, Lucknow (3) Argunganj, Sultanpur Road, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Avadh Vihar Yojna Sector-7A, Lucknow
2Boundary Wall
No Provision
3Road Work
6M Wide Road
4Footpaths
No Provision
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Yes
7Drain
Yes
8Parks
Yes
9Tree Planting
Yes
10Design For Electric Supply Including Street Lighting
Yes
11Community Buildings
Provision in Future
12Treatment and Disposal System of Sewage and Sullage water
Through Sewer Line
13Solid Waste Management And Disposal System
As per Norms
14Water Conservation System
As per Norms
15Energy Management System Including Use of Renewable Energy
Through UPPCL
16Fire Protection And Fire Safety System
Yes
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Norms
18Emergency Evacuation Services
As per Norms
19Other Miscellaneous Work
As per Norms
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Nov 2022.

Sanctioned by U.P. Awas Evam Vikas Parishad · 24,828 sqm of land · an approved plan of 1 block and 992 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
UPHDB/APD/Unit-5/Avadh Vihar/PMAY/Sect-7A/259/20171 Dec 201730 Nov 202230 Nov 202514 Nov 2020
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 12 May 2022.

#Granted fromExtended uptoNote
114 Nov 202013 May 2021Six months extension in view of force majeure caused by covid-19 pandemic
213 May 202112 May 2022—

Land & documents

60 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
980.344—
990.102—
1030.100—
1040.10—
2010.019—
2020.112—
2030.187—
2040.038—
2050.038—
2060.057—
2070.057—
2080.038—
2090.025—
2100.092—
2160.158—
2180.132—
2190.037—
2200.160—
2210.051—
2220.051—
2230.089—
2310.172—
2350.324—
983440Khasra
991020Khasra
1031000Khasra
104100Khasra
201190Khasra
2021120Khasra
2031870Khasra
204380Khasra
205380Khasra
206570Khasra
207570Khasra
208380Khasra
209250Khasra
210920Khasra
2161580Khasra
2181320Khasra
219370Khasra
2201600Khasra
221510Khasra
222510Khasra
223890Khasra
2311720Khasra
2353240Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 7 Oct 2008.

Registry no.DateTypeArea
UPAVP Land7 Oct 2008self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · UPAVP Land
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Sept 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Sept 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Feb 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Health serviceYes
Renewable energyYes

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PRADHAN MANTRI AWAS YOJANA (SAHARI) SEC-7A AVADH VIHAR YOJANA LUCKNOWBankVijaya BankBranchVRINDAVAN YOJANAA/C no.IFSCVIJB0006559
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow

Is Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow RERA registered?

Yes. Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow is registered with UPRERA under registration number UPRERAPRJ15287, registered on 24 Feb 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow been completed?

UPRERA still lists Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow as Registered, so it is not shown as completed here. A completion certificate dated 22 Jun 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow more time to complete?

UPRERA's record carries 2 completion extensions for Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow, the latest running to 12 May 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow located?

Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow is registered in Lucknow, as filed with UPRERA.

What configurations are available in Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow?

The approved unit plan describes 1 block and 992 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of Pradhan Mantri (Sahari) Avas Yojna in Sector-7A, Avadh Vihar Yojna, Lucknow?

About 162 units per acre: 992 planned units across 6.14 acres (24,828 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗