Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Sec-8, Lucknow (RERA ID UPRERAPRJ867812). Registered with a completion deadline of 9 Dec 2029.
RERA status as reported: Registered.Construction progress
Construction stayed at 0% across 4 consecutive filed quarters (Jul–Sep 2025 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ867812 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 1 Feb 2025 |
| Project duration | 59 months |
| Address | Sector-8, Awadh Vihar Yojna, Lucknow, Sec-8, Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
UPHDB/APD/UN-4/A.V.Y./LKO/SEC-8/336/2024
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 19 Feb 2025 |
| Original completion | 9 Dec 2029 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,58,500 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Sanctioned Layout plan by using Stone T. |
| 2 | Boundary Wall Boundary wall of 1.9 mtr. would be constructed by using RCC frame Structure s per approved design/drawings. |
| 3 | Road Work 12 mtr wide bituminous road having crust thickness of 0.475 mtr and carriage way width of 4.50mtr. |
| 4 | Footpaths N/A |
| 5 | Water Supply Including Drinking Water Facilities Water supply lines of 100 to 150 mm dia, sluice valve air relief valve and fire hydrant valve would be provided as per approved design/drawing water connection would be provided is each plot for water supply. |
| 6 | Sewer System Sewer line of 250 mm dia of RCC hume pipe would be lalid as per approved design/drawing manholes/chamber would be built as per approved design drawing. Sewer connecting chamber would be provided in each plot for sewer disposal. |
| 7 | Drain Brick work type drain would be built on both side of road for disposal of rain/storm water as per approved design/drawing. |
| 8 | Parks N/A |
| 9 | Tree Planting Trees/shurbs plants would be planted as per norms. |
| 10 | Design For Electric Supply Including Street Lighting HT/LT Lines, street light on MS Pole would be provided as per UPAVP/UPPCL norms. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Disposal of sewer into Trunk Sewer line. |
| 13 | Solid Waste Management And Disposal System Door to Door Collection by UPAVP/Nagar Nigam |
| 14 | Water Conservation System N/A |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work As per Requirement |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Dec 2029.
Sanctioned by U.P. Awas Evam Vikas Parishad · 50,605 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| UPHDB/APD/UN-4/A.V.Y./LKO/SEC-8/336/2024 | 10 Dec 2024 | 9 Dec 2029 | 9 Dec 2032 | 9 Dec 2029 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 132,133,134,144,145,146,147,149,150,151,152,153, 287,288,289,290,320,321,322,323,324,325,325 | 50605 | Khasra |
| Allotment letter from the authority · 2686/8-2-2007-04HB/2005 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| General body resolution The resolution authorising an apartment owners’ association to act as the registering entity. | not reported | — |
| Affidavit on balance development work The promoter’s sworn statement about the development work still to be finished. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Feb 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 7 Jan 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 7 Jan 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 7 Jan 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 7 Jan 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 7 Jan 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 7 Jan 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 28 Jan 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 28 Jan 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Feb 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 7 Jan 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 7 Jan 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 18 Feb 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 7 Jan 2025 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | UPAVP-COLL A/C FOR 86 PLOTS SEC-8 AVADH VIHAR YOJNA LKOBankAXIS BANKBranchALIGANJBranch addressPragati Kendra, Kapoorthala Bagh, Aliganj, Lucknow-226020Branch districtLucknowA/C no.IFSCUTIB0001692Branch emailaliganj.branchhead@axisbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | UPAVP-SEP A/C FOR 86 PLOTS SEC-8 AVADH VIHAR YOJANA LKOBankAXIS BANKBranchALIGANJBranch addressPragati Kendra, Kapoorthala Bagh, Aliganj, Lucknow-226020Branch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0001692 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | UPAVP-TRAN A/C FOR 86 PLOTS SEC-08 AVADH VIHAR YOJANA LKOBankAXIS BANKBranchALIGANJBranch addressPragati kendra, kapoorthala Bagh, aliganj, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0001692 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow
Is Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow RERA registered?
Yes. Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow is registered with UPRERA under registration number UPRERAPRJ867812, registered on 19 Feb 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow?
The completion date filed with UPRERA is 9 Dec 2029. No completion certificate is on record yet.
Who is the builder of Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow located?
Residential Plots (86 Nos.) in Sector-8 of Awadh vihar Yojna, Lucknow is registered in Sec-8, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗