Coronation Amy Villa

UPRERARegistered

Coronation Amy Villa is a RERA-registered mixed project by CORONATION HOUSING AND DILIGENCE in Lucknow (RERA ID UPRERAPRJ730714). Registered with a completion deadline of 12 Feb 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
—Q2'25
38%Q3'25
42%Q4'25
46%Q1'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ730714
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start15 Feb 2022
Project duration48 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typePartnership Firm
Applicant addressLGF CORONATION LVY COURT, 11 J.C. BOSE MARG LALBAGH, LUCKNOW, Lucknow, Uttar Pradesh, 226018
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered6 Jun 2022
Original completion14 Feb 2025
Revised completion12 Feb 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary9 Jul 2026
Registration fee₹35,250
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors6 · 1 · 6 (units from plan)
Homes · commercial units4 · 2 (shops and offices filed in the same plan)
  • 3 BHK4 67%
  • SHOP2 33%
ConfigurationUnitsCarpet area
SHOP2889-962
3 BHK4619
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · SHOP, 3 BHK66619-962
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Point Architects Pvt Ltd
License CA No. 89/12464
Flat 1 GF, Royal Court Apartment Wazir Hasan Road Lucknow
Engineer
Rahul Tripathi
504 BLOK B, OMAXE TOWER, GOMTI NAGAR EXTN. LUCKNOW
Contractor
self
self
Sr.Development work declared to RERA
1Demarcation of Plots
N/A
2Boundary Wall
Boundary Wall shall be constructed on all the three sides in first class brick work with 1;6 cement sand mortar proportion. 230 mm x 230 mm R.C.C. Column shall be provided at regular intervals with expansion joints where required. On road side M.S. Railing shall be provided up to the height of 2.1 meters with 6 meter wide gate as per site plan
3Road Work
80mm Paver stones over 100mm PCC over 50mm Sand bed
4Footpaths
N/A
5Water Supply Including Drinking Water Facilities
Terrace Tank of 25000 litres capacity shall be provided for water supply. All the toilets and kitchens will be connected from terrace tank through different sizes of PVC pipes. Water shall be available round the clock in the building.
6Sewer System
Waste water of the building shall be discharged through pvc pipe of 150 mm diameter laid in trenches of 230mm wide covered with course aggregate. The trenches shall be excavated to a slight gradient (1 in 300 or so). Inspection chamber shall be provided at regular interval
7Drain
The rainwater from roof top shall be routed through down pipes passing through each floor shaft till ground floor then finally converging to under ground external RWH pipelines. These underground RWH pipelines shall finally transfer rain water harvesting pits (1 Nos.) provided at site. The surface rain water shall be collected through drain from roads and all other surfaces in open/under ground trenches. The trenches shall be covered with MS gratings through out on top of open trenches. PVC pipe of 150mm diameter shall be laid in trenches of 230mm wide covered with course aggregate.
8Parks
535.64 sq mtr area has been proposed
9Tree Planting
19 no of Trees are proposed to be planted
10Design For Electric Supply Including Street Lighting
The electrical supply shall be drawn from MVVNL electrical infrastructure of high voltage line. This high voltage supply shall be tapped from MVVNL source to our high voltage controlling unit consisting of VCB, step down transformer, LT power control systems and LT power shall be then distributed through power cables to energy supply meters of Individual consumers and shall be individually billed for recording power consumptions by MVVNL. The necessary features shall be like earthing and other protection shall follow as per standard applicable norms The street light designing shall be separately done as per land scaping and road design plans. All lighting system electricity supply shall be compatible with necessary earthing as per Bureau of Indian Standards, MVVNL Rules and regulations
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
A septic tank of 20000 liters capacity shall be provided
13Solid Waste Management And Disposal System
Different types of bins shall be kept in the building to collect waste of the building and disposed by the municipality vans of Lucknow Municipal Corporation
14Water Conservation System
Water Conservation System shall consist of RWH (Rain Water Harvesting) pits and associated under ground tank of adequate capacity
15Energy Management System Including Use of Renewable Energy
Solar Energy shall be tapped from terrace floor with required capacity. The total energy produced throughout the day time from solar panels will be directed to online grid systems of MVVNL for maximum benefit
16Fire Protection And Fire Safety System
All rules and regulations of NBC shall be followed The system will consist of fire fighting equipment, firehose reels, extinguishers, underground water tank, Terrace and Jockey pumps etc. Necessary fire water tank on terrace shall be provided, fire sprinklers as required on both commercial floors as per NBC guidelines. Basement shall be provided with sprinklers and fire fighting systems as per NBC guidelines
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A
18Emergency Evacuation Services
Fire Escape
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 31 Dec 2026. 2 of them carry a revalidation.

Sanctioned by Lucknow Development Authority · 3,666 sqm of land · an approved plan of 1 block and 6 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
ResiComm Building/03161/LDA/BP/21-22/1248/041020211 Jan 202231 Dec 202631 Dec 202914 Feb 2025—
ResiComm Building/03161/LDA/BP/21-22/1248/041020211 Jan 202231 Dec 202631 Dec 202614 Feb 20251 Jan 2022
ResiComm Building/03161/LDA/BP/21-22/1248/041020211 Jan 202231 Dec 202631 Dec 202614 Feb 20251 Jan 2022
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 12 Feb 2026.

#Granted fromExtended uptoNote
114 Feb 202512 Feb 2026—

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
183666Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 204-V-157
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 1/23642/301-362/4895 dated 10-06-2020
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Sale deed · 2576-Book1-Vol923-pg 155-161
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · Court Decree under order 23 Rule III CPC 1908
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · House Tax Receipt as requested
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Municipal record
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 Mar 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New16 Mar 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New16 Mar 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 Mar 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New16 Mar 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New16 Mar 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New16 Mar 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New16 Mar 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New16 Mar 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New16 Mar 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 Mar 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Mar 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Apr 2022 ↗

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2025-Q4.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q238%CA ↗ · Arch ↗ · Eng ↗
2025-Q342%CA ↗ · Arch ↗ · Eng ↗
2025-Q446%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCORONATION HOUSING AND DILIGENCE
RolePromoter · current
RERA IDUPRERAPRM168004
PANAAAFC6587E
CIN / TANLKNC05011G
Registered addressLGF CORONATION LVY COURT, 11 J.C. BOSE MARG LALBAGH, LUCKNOW, Lucknow, Uttar Pradesh, 226018
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameRAJESH KUMAR SETH
RoleCo-promoter
Applicant typeIndividual
Address702, Bijwa Coronation Estate, 28 park Road Lucknow
RERA contact
Legal nameAJEET KUMAR SETH
RoleCo-promoter
Applicant typeIndividual
Address4, CAPPER ROAD LALBAGH LUCKNOW
RERA contact
Legal nameSUNITA SETH
RoleCo-promoter
Applicant typeIndividual
Address130, ROUND HILL ROAD, SCARSDALE NEWYORK
RERA contact
Legal nameVIJAY KUMAR SETH
RoleCo-promoter
Applicant typeIndividual
Address4 CAPPER ROAD, LALBAGH LUCKNOW
RERA contact
Legal nameVEENA BAJPAI
RoleCo-promoter
Applicant typeIndividual
AddressA-1/5 VISHWASH KHAND GOMTI NAGAR LUCKNOW
RERA contact

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Coronation Housing Diligence Account - Collection Account for Coronation Amy VillaBankFederal BankBranchMain BranchBranch address37-A, Cantonment Road, Burlington Crossing, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCFDRL0001149
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Coronation Housing Diligence - Separate Account for Coronation Amy VillaBankFederal BankBranchMain BranchBranch address37-A, Cantonment Road, Burlington Crossing, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCFDRL0001149
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Coronation Housing Diligence - Rera Transaction Account For Coronation Amy VillaBankFederal BankBranchMain BranchBranch address37-A, Cantonment Road, Burlington Crossing, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCFDRL0001149
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Coronation Amy Villa

Is Coronation Amy Villa RERA registered?

Yes. Coronation Amy Villa is registered with UPRERA under registration number UPRERAPRJ730714, registered on 6 Jun 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has Coronation Amy Villa been completed?

UPRERA still lists Coronation Amy Villa as Registered, so it is not shown as completed here. A completion certificate dated 9 Jul 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Coronation Amy Villa?

CORONATION HOUSING AND DILIGENCE is the promoter entity that filed Coronation Amy Villa with UPRERA (promoter RERA ID UPRERAPRM168004). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Coronation Amy Villa more time to complete?

UPRERA's record carries 1 completion extension for Coronation Amy Villa, the latest running to 12 Feb 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Coronation Amy Villa have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Coronation Amy Villa located?

Coronation Amy Villa is registered in Lucknow, as filed with UPRERA.

What configurations are available in Coronation Amy Villa?

The unit plan filed with UPRERA lists SHOP and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Coronation Amy Villa?

The approved unit plan filed with UPRERA runs from 619 to 962 m² of carpet area (about 6,668 to 10,350 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Coronation Amy Villa?

The approved unit plan describes 1 block and 6 units of which 4 are homes and 2 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Coronation Amy Villa?

About 7 units per acre: 6 planned units across 0.91 acres (3,666 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗