DURVA GREENS is a RERA-registered residential project by KAMRUP HOUSING PROJECT PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ1440). RERA status: NCLT (since 13 Feb 2019).
RERA status as reported: NCLT.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ1440 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | NCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 12 Sept 2012 |
| Original start | 12 Sept 2012 |
| Project duration | 64 months |
| Address | SECTOR CHI V, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | L-1/7 HAUZ KHAS ENCLAVE NEW DELHI 110016 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
PLG(BP)-2435/GH/OPA 3565
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
NCLT order
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Aug 2017 |
| Original completion | 31 Dec 2017 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹55,000 |
| Sanctioning authority | Greater Noida Authority |
| NCLT order date | 13 Feb 2019 |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | — | 140-141 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 3 BHK | 12 | — | 140-141 |
| B · 3 BHK | 12 | — | 140-141 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Done by GNIDA |
| 2 | Boundary Wall Brick masonry |
| 3 | Road Work RCC internal roads |
| 4 | Footpaths Footpaths of paver blocks |
| 5 | Water Supply Including Drinking Water Facilities Total water requirement of the project will be 97 KLD 57 KLD will be fresh water Rest 40 KLD requirement will be fulfilled by treated water 29 KLD excess treated water discharge to sewer line |
| 6 | Sewer System Total quantity of wastewater generation will be 243 KLD The generated sewage will be treated in in-house Sewage Treatment Plant capacity 300 KLD The treated water shall be utilized to the extent possible & the rest excess treated water shall be discharge into sewer |
| 7 | Drain Suitable drainage and waste management measures will be adopted in both the construction and operational phase which will restrict stagnation of water or accumulation of water This will effectively restrict the reproduction and growth of disease vectors |
| 8 | Parks The Shelter belt for the proposed project has been planned to provide a clean, healthy and beautiful green environment for the people to live in within the proposed project site To minimize the impact the provision of plantation area of 3000 sq m area, with lawns ornamental shrubs and trees shall be provided |
| 9 | Tree Planting 125 trees will be grown in 1500 sq mts as part of the green area |
| 10 | Design For Electric Supply Including Street Lighting Source of Electricity Noida Power Corporation Ltd Total Electrical load 1582 KW DG sets for power back up- 3 X 600 KVA Solar LED CFL for street lighting |
| 11 | Community Buildings Club house with related amenities |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of 85 KLD capacity will be installed for treatment the waste water & 40 KLD of treated water will be reused in flushing, DG Cooling Gardening and Misc purpose 29 KLD Excess treated water will be discharge into sewer line |
| 13 | Solid Waste Management And Disposal System Sludge generated from STP within complex during operation phase and this sludge will be passed through filter press where it will be dewatered/ dried to form a cake and then will be used as manure in green areas |
| 14 | Water Conservation System 40 KLD water requirement will be fulfilled by treated water. 2 number of rain water harvesting pits are provided at site |
| 15 | Energy Management System Including Use of Renewable Energy energy efficient motors and pumps; Solar fed CFL/LED street lighting; automatically operated DG sets to optimize energy usage; transformer having efficiencies as per ECBC norms; guidelines to individual flat owners on energy efficient gadgets and energy saving programmes |
| 16 | Fire Protection And Fire Safety System no production of hazardous waste except generation of used oil from DG sets will be anticipated. Proper fire-fighting system will be installed at the site for operation phase |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Galgotia College of Engg. & Tech. Gautam Bhuddha University, Hospital within 3 Km radius |
| 18 | Emergency Evacuation Services The electrical systems with automatic circuit breakers activated by the rise of current as well as activated by over current Fire detection and alarm system at appropriate places Access for fireman Adequate fire-fighting requirement in designing the electrical distribution system The emergency lights operated on battery power at appropriate locations |
| 19 | Other Miscellaneous Work as per EC application and Presentation to SEAC |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 20 Apr 2016. 1 of them carries a revalidation.
Sanctioned by Greater Noida Authority · 10,000 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG(BP)-2435/GH/OPA 3565 | 21 Apr 2011 | 20 Apr 2016 | 20 Apr 2019 | 31 Dec 2017 | — | |
| PLG(BP)-2435/GH/OPA 3565 | 21 Apr 2011 | 20 Apr 2016 | 20 Apr 2021 | 31 Dec 2017 | 21 Apr 2011 |
| Document | File |
|---|---|
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
Land & documents
5 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PLOT NO. GH 08A | 10000 | — |
| GH-08A SECTOR CHI V | 10000.37 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 12 Jun 2009.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| Lease Registration no. 7317 dt 22/06/2009 | 12 Jun 2009 | Other | — |
| Lease deed · 7317 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 27 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 27 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 27 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | 65KLD CAPACITY |
| Fire safety (as filed with RERA) | As per National Building Code 2005 and local bye l |
| Health service | Pablic Health facility available within 3.5 kms |
| Renewable energy | Common areas powered by Solar Energy |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | KAMRUP HOUSING PROJECT PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4709 |
| PAN | AACCK4254H |
| CIN / TAN | U45201DL2004PTC124303 |
| Name of chairman | MR. SHRIDEV SHARMA |
| Registered address | L-1/7 HAUZ KHAS ENCLAVE NEW DELHI 110016 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | KAMRUP HOUSING PROJECTS PVT. LTD.BankBank of BarodaBranchGAMMA 2, NOIDAA/C no.IFSCBARB0GAMNOI |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about DURVA GREENS
Is DURVA GREENS RERA registered?
Yes. DURVA GREENS is registered with UPRERA under registration number UPRERAPRJ1440, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for DURVA GREENS?
The completion date filed with UPRERA is 31 Dec 2017. No completion certificate is on record yet.
Who is the builder of DURVA GREENS?
KAMRUP HOUSING PROJECT PVT. LTD. is the promoter entity that filed DURVA GREENS with UPRERA (promoter RERA ID UPRERAPRM4709). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does DURVA GREENS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is DURVA GREENS located?
DURVA GREENS is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in DURVA GREENS?
The unit plan filed with UPRERA lists 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in DURVA GREENS?
The approved unit plan filed with UPRERA runs from 140 to 141 m² of carpet area (about 1,506 to 1,516 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗