DURVA GREENS

UPRERANCLT

DURVA GREENS is a RERA-registered residential project by KAMRUP HOUSING PROJECT PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ1440). RERA status: NCLT (since 13 Feb 2019).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ1440
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start12 Sept 2012
Original start12 Sept 2012
Project duration64 months
AddressSECTOR CHI V, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressL-1/7 HAUZ KHAS ENCLAVE NEW DELHI 110016
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    PLG(BP)-2435/GH/OPA 3565

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Dec 2017
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹55,000
Sanctioning authorityGreater Noida Authority
NCLT order date13 Feb 2019

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 2 · 12 (from plan)
ConfigurationUnitsCarpet area
3 BHK—140-141
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK12—140-141
B · 3 BHK12—140-141
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
THE DESIGNER
License CA/95/18089
41, Navodaya Enclave SP Staduim Road, Ahmedabad, Gujarat.
Engineer
Mitalee Anviksha Associates
403,Twinkle Complex, nr. Dhananjay Tower, Maa Anandmayi Marg, Satellite, Ahmedabad 380015
Sr.Development work declared to RERA
1Demarcation of Plots
Done by GNIDA
2Boundary Wall
Brick masonry
3Road Work
RCC internal roads
4Footpaths
Footpaths of paver blocks
5Water Supply Including Drinking Water Facilities
Total water requirement of the project will be 97 KLD 57 KLD will be fresh water Rest 40 KLD requirement will be fulfilled by treated water 29 KLD excess treated water discharge to sewer line
6Sewer System
Total quantity of wastewater generation will be 243 KLD The generated sewage will be treated in in-house Sewage Treatment Plant capacity 300 KLD The treated water shall be utilized to the extent possible & the rest excess treated water shall be discharge into sewer
7Drain
Suitable drainage and waste management measures will be adopted in both the construction and operational phase which will restrict stagnation of water or accumulation of water This will effectively restrict the reproduction and growth of disease vectors
8Parks
The Shelter belt for the proposed project has been planned to provide a clean, healthy and beautiful green environment for the people to live in within the proposed project site To minimize the impact the provision of plantation area of 3000 sq m area, with lawns ornamental shrubs and trees shall be provided
9Tree Planting
125 trees will be grown in 1500 sq mts as part of the green area
10Design For Electric Supply Including Street Lighting
Source of Electricity Noida Power Corporation Ltd Total Electrical load 1582 KW DG sets for power back up- 3 X 600 KVA Solar LED CFL for street lighting
11Community Buildings
Club house with related amenities
12Treatment and Disposal System of Sewage and Sullage water
STP of 85 KLD capacity will be installed for treatment the waste water & 40 KLD of treated water will be reused in flushing, DG Cooling Gardening and Misc purpose 29 KLD Excess treated water will be discharge into sewer line
13Solid Waste Management And Disposal System
Sludge generated from STP within complex during operation phase and this sludge will be passed through filter press where it will be dewatered/ dried to form a cake and then will be used as manure in green areas
14Water Conservation System
40 KLD water requirement will be fulfilled by treated water. 2 number of rain water harvesting pits are provided at site
15Energy Management System Including Use of Renewable Energy
energy efficient motors and pumps; Solar fed CFL/LED street lighting; automatically operated DG sets to optimize energy usage; transformer having efficiencies as per ECBC norms; guidelines to individual flat owners on energy efficient gadgets and energy saving programmes
16Fire Protection And Fire Safety System
no production of hazardous waste except generation of used oil from DG sets will be anticipated. Proper fire-fighting system will be installed at the site for operation phase
17Social Infrastructure And Other Public Amenities Including Public Health Services
Galgotia College of Engg. & Tech. Gautam Bhuddha University, Hospital within 3 Km radius
18Emergency Evacuation Services
The electrical systems with automatic circuit breakers activated by the rise of current as well as activated by over current Fire detection and alarm system at appropriate places Access for fireman Adequate fire-fighting requirement in designing the electrical distribution system The emergency lights operated on battery power at appropriate locations
19Other Miscellaneous Work
as per EC application and Presentation to SEAC
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 20 Apr 2016. 1 of them carries a revalidation.

Sanctioned by Greater Noida Authority · 10,000 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG(BP)-2435/GH/OPA 356521 Apr 201120 Apr 201620 Apr 201931 Dec 2017—
PLG(BP)-2435/GH/OPA 356521 Apr 201120 Apr 201620 Apr 202131 Dec 201721 Apr 2011
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

5 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PLOT NO. GH 08A10000—
GH-08A SECTOR CHI V10000.37Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 12 Jun 2009.

Registry no.DateTypeArea
Lease Registration no. 7317 dt 22/06/200912 Jun 2009Other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 7317
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old27 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking water65KLD CAPACITY
Fire safety (as filed with RERA)As per National Building Code 2005 and local bye l
Health servicePablic Health facility available within 3.5 kms
Renewable energyCommon areas powered by Solar Energy

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameKAMRUP HOUSING PROJECT PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM4709
PANAACCK4254H
CIN / TANU45201DL2004PTC124303
Name of chairmanMR. SHRIDEV SHARMA
Registered addressL-1/7 HAUZ KHAS ENCLAVE NEW DELHI 110016
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
KAMRUP HOUSING PROJECTS PVT. LTD.BankBank of BarodaBranchGAMMA 2, NOIDAA/C no.IFSCBARB0GAMNOI
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about DURVA GREENS

Is DURVA GREENS RERA registered?

Yes. DURVA GREENS is registered with UPRERA under registration number UPRERAPRJ1440, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for DURVA GREENS?

The completion date filed with UPRERA is 31 Dec 2017. No completion certificate is on record yet.

Who is the builder of DURVA GREENS?

KAMRUP HOUSING PROJECT PVT. LTD. is the promoter entity that filed DURVA GREENS with UPRERA (promoter RERA ID UPRERAPRM4709). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DURVA GREENS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DURVA GREENS located?

DURVA GREENS is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in DURVA GREENS?

The unit plan filed with UPRERA lists 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DURVA GREENS?

The approved unit plan filed with UPRERA runs from 140 to 141 m² of carpet area (about 1,506 to 1,516 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗