Eldeco Saksham At Samridhi, Udyan 2

UPRERACompleted

Eldeco Saksham At Samridhi, Udyan 2 is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Lucknow (RERA ID UPRERAPRJ421679). RERA status: Completed on 3 Jun 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Completed.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ421679
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Mar 2021
Project duration65 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20190824115608423

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 Apr 2021
Original completion13 Jul 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary3 Jun 2024
Registration fee₹21,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors142 · 1 · 7 (units from plan)
  • 1 BHK136 96%
  • STUDIO6 4%
ConfigurationUnitsCarpet area
1 BHK13632
STUDIO617
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Eldeco Saksham · OTHER, 1 BHK, STUDIO714217-32
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sanjay Kumar Gupta
License CA/89/12382
108,Corporate Chamber-1,Vibhuti Khand,Gomti Nagar Lucknow-226010
Engineer
Akhilesh Kumar Singh
ATS Structural Consultants,D-27,Indra Nagar,Lucknow
Contractor
Mr.S.N Tewari CO Prabha Enterprises
182-C Eldeco Udyan I Bangla Bazar Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Site is very demarcated at its location with constructed approach roads.
2Boundary Wall
2.2 mt. boundary wall is proposed to be constructed with RCC columns and MS gate as per approval.
3Road Work
6 mt. wide black top road around the building block shall be constructed as per CPWD specifications.
4Footpaths
Footpath shall be in C.C. or 40 mn paver blocks along the complete length of road.
5Water Supply Including Drinking Water Facilities
Under Ground water shall be pumped to the Terrace tanks for domestic supply of water. Water to the units shall be through downcomer pipes as per detailed design.
6Sewer System
All well designed system of PVC pipes shall be laid around the building block. Final disposal shall be to the main sewer line.
7Drain
All the surface drainage shall be connected to the township drain through well designed covered U-Drain system in slope.
8Parks
Green shall be developed as per the approved area. Additional row of 4.5 mt high plants shall be provided along boundary wall.
9Tree Planting
4.5 to 6.0 mt. high trees along the boundary wall shall be planted at the rate 5.0 mt c/c.
10Design For Electric Supply Including Street Lighting
Supply to complex shall be through a separate transformer of designed capacity.
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
Sewer system shall be connected to the main sewer of township, which in turn connects to proper disposal system of LDA/Nagar Nigam.
13Solid Waste Management And Disposal System
A separate area to be marked within the complex for the collection of solid waste. Disposal shall be coordinated with Nagar Nigam Lucknow.
14Water Conservation System
All the roof top water shall be collected and connected to the under ground recharge system.
15Energy Management System Including Use of Renewable Energy
Roof top solar panels and solar powered street lights shall be provided.
16Fire Protection And Fire Safety System
Provision of downcommers with Hose reel, Fire extinguishers and terrace tanks with required storage capacity have been planned as per the NOC conditions of Fire department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
Building is well deisgned with three stairs and fire lift for emergency evacuation and rescue operations.
19Other Miscellaneous Work
N.A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

37 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2AMIT AGARWALUPRERAAGT11945
3ANIL KUMAR VERMAUPRERAAGT14346
4ARTI TIWARIUPRERAAGT14234
5ASA FINCAP ADVISORS LLPUPRERAAGT10926
6BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
7bhupendra kumar singhUPRERAAGT11056
8BIPIN CHANDRA PANTUPRERAAGT13687
9Brijendra SinghUPRERAAGT10496
10DAIWIK REALTORSUPRERAAGT12075
11DEVENDRA VERMAUPRERAAGT14290
12GOLDEN STAR REAL ESTATESUPRERAAGT10303
13INDIABULLS INVESTMENT ADVISORS LIMITEDUPRERAAGT10238
14INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
15KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
16Mr. Janardan AgarwalUPRERAAGT10555
17OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
18Prem Prakash KhareUPRERAAGT13677
19REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
20REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
21RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
22SANJEEV KUMAR BANKAUPRERAAGT10894
23SDR INFRA BUILD PVT LTDUPRERAAGT11062
24SHAH MOHSIN KAMALUPRERAAGT14208
25SHREE SAI ASSOCIATESUPRERAAGT11846
26SHREE SHRADDHA PROPERTIESUPRERAAGT10301
27SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
28Smart InfraReality Private LimitedUPRERAAGT10057
29SMC Real Estate Advisors Private LimitedUPRERAAGT10113
30SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
31Vajrakaya Buildwell Private LimitedUPRERAAGT12913
32VANDANA AGARWALUPRERAAGT13353
33Varun Properties Inc.UPRERAAGT11985
34Vikas SinghUPRERAAGT11446
35VIMLESH PRATAP SINGHUPRERAAGT11674
36VIRENDRA KUMAR DEWANUPRERAAGT13205
37VISHESH SRIVASTAVAUPRERAAGT11416
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 13 Jul 2025.

Sanctioned by Lucknow Development Authority · 3,124 sqm of land · an approved plan of 1 block and 142 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP2019082411560842314 Jul 202013 Jul 202512 Jul 202813 Jul 2026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
N.A3124Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · N.A.
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Feb 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Feb 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Feb 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Feb 2021 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New25 Feb 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Mar 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New17 Mar 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Mar 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New17 Mar 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Feb 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Feb 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Feb 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New23 Feb 2021 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2024-Q3.

QuarterConstructionCertificates
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameELDECO Housing and Industries Ltd.
RolePromoter · current
RERA IDUPRERAPRM21
PANAAACE4554G
CIN / TANL45202UP1985PLC099376
Name of chairmanMr Pankaj Bajaj
Registered addressShop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameLucknow Development Authority
RoleCo-promoter · current
RERA IDUPRERAPRM10102
Applicant typeCompetent authority
PANAAALL0016F
CIN / TANLKNL00280A
Registered addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
RERA contact
Registered since2017

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

2 of the 3 account headings UPRERA publishes are filed for this project: collection and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Eldeco Housing And Industries Limited-Eldeco Saksham Collection AccountBankHDFC BankBranchIndira Nagar LucknowBranch addressIndira Nagar Near Lekhraj Nagina Building,Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0009176
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Eldeco Housing And Industries LimitedBankHDFC BankBranchIndira Nagar LucknowBranch addressIndira Nagar Near Lekhraj Nagina Building,Lucknow-226016Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0009176
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)17 (Under Registration - 1 ) → 17 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco Saksham At Samridhi, Udyan 2

Is Eldeco Saksham At Samridhi, Udyan 2 RERA registered?

Yes. Eldeco Saksham At Samridhi, Udyan 2 is registered with UPRERA under registration number UPRERAPRJ421679, registered on 1 Apr 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has Eldeco Saksham At Samridhi, Udyan 2 been completed?

UPRERA lists Eldeco Saksham At Samridhi, Udyan 2 as completed, with a completion certificate dated 3 Jun 2024, against a filed deadline of 13 Jul 2026.

Who is the builder of Eldeco Saksham At Samridhi, Udyan 2?

ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Saksham At Samridhi, Udyan 2 with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Eldeco Saksham At Samridhi, Udyan 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eldeco Saksham At Samridhi, Udyan 2 located?

Eldeco Saksham At Samridhi, Udyan 2 is registered in Lucknow, as filed with UPRERA.

What configurations are available in Eldeco Saksham At Samridhi, Udyan 2?

The unit plan filed with UPRERA lists OTHER, 1 BHK and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eldeco Saksham At Samridhi, Udyan 2?

The approved unit plan filed with UPRERA runs from 17 to 32 m² of carpet area (about 186 to 342 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eldeco Saksham At Samridhi, Udyan 2?

The approved unit plan describes 1 block and 142 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eldeco Saksham At Samridhi, Udyan 2?

About 184 units per acre: 142 planned units across 0.77 acres (3,124 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗