Eldeco Samridhi is a RERA-registered residential project by ELDECO Housing and Industries Ltd. in Lucknow (RERA ID UPRERAPRJ6773). RERA status: Completed on 27 Sept 2019.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6773 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 May 2013 |
| Original start | 1 May 2013 |
| Project duration | 94 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
38712
Registered with RERA
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2017 |
| Original completion | 30 Aug 2020 |
| Revised completion | 27 Feb 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 27 Sept 2019 |
| Registration fee | ₹2,77,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Land Demarcated |
| 2 | Boundary Wall NA |
| 3 | Road Work Completed -As per Approval |
| 4 | Footpaths Completed -As per Approval |
| 5 | Water Supply Including Drinking Water Facilities Completed -As per approval |
| 6 | Sewer System Completed - As per approval and specifications |
| 7 | Drain Completed- As per Approval |
| 8 | Parks Completed- As per Approval |
| 9 | Tree Planting Completed |
| 10 | Design For Electric Supply Including Street Lighting Completed As per Approval and Specifications |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Connected to Main Disposal System |
| 13 | Solid Waste Management And Disposal System By Nagar Nigam |
| 14 | Water Conservation System Rain Water Harvesting |
| 15 | Energy Management System Including Use of Renewable Energy Solar Energy to be Harnessed |
| 16 | Fire Protection And Fire Safety System Completed as per approval |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services 18 Mtr road for exit |
| 19 | Other Miscellaneous Work NA |
Registered agents
38 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | AMIT AGARWAL | UPRERAAGT11945 |
| 3 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 4 | ARTI TIWARI | UPRERAAGT14234 |
| 5 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 6 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 7 | bhupendra kumar singh | UPRERAAGT11056 |
| 8 | BIPIN CHANDRA PANT | UPRERAAGT13687 |
| 9 | Brijendra Singh | UPRERAAGT10496 |
| 10 | DAIWIK REALTORS | UPRERAAGT12075 |
| 11 | DEVENDRA VERMA | UPRERAAGT14290 |
| 12 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 13 | INDIABULLS INVESTMENT ADVISORS LIMITED | UPRERAAGT10238 |
| 14 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 15 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 16 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 17 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 18 | OPAL PROPERTY SOLUTIONS PRIVATE LIMITED | UPRERAAGT13636 |
| 19 | Prem Prakash Khare | UPRERAAGT13677 |
| 20 | Rajni Dawra | UPRERAAGT13519 |
| 21 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 22 | REETA MAURYA C/O SHIVA ASSOCIATE | UPRERAAGT13650 |
| 23 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 24 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 25 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 26 | SHAH MOHSIN KAMAL | UPRERAAGT14208 |
| 27 | SHREE SAI ASSOCIATES | UPRERAAGT11846 |
| 28 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 29 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 30 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 31 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 32 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 33 | Vajrakaya Buildwell Private Limited | UPRERAAGT12913 |
| 34 | VANDANA AGARWAL | UPRERAAGT13353 |
| 35 | Varun Properties Inc. | UPRERAAGT11985 |
| 36 | VIMLESH PRATAP SINGH | UPRERAAGT11674 |
| 37 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
| 38 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Aug 2020.
Sanctioned by Lucknow Development Authority · 54,343 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 38712 | 31 Aug 2015 | 30 Aug 2020 | 29 Aug 2023 | 30 Aug 2020 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 27 Feb 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Aug 2020 | 27 Feb 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 0 | 54343 | Plot |
| Allotment letter from the authority · 558/CA/ST The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 27 Feb 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 22 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 22 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 22 Jun 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 3 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 22 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 22 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 22 Jun 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 5 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 22 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 31 Jul 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Deep Borewell / Supply by Local Authority |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ELDECO Housing and Industries Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM21 |
| PAN | AAACE4554G |
| CIN / TAN | L45202UP1985PLC099376 |
| Name of chairman | Mr Pankaj Bajaj |
| Registered address | Shop No S-16, Second Floor, Eldeco Station 1, Site No.1, Faridabad sector 12, Faridabad 121007, Haryana India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Eldeco Housing & Industries LimitedBankICICI BankBranchIndira NagarA/C no.IFSCICIC0000591 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 17 (Under Registration - 1 ) → 17 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Eldeco Samridhi
Is Eldeco Samridhi RERA registered?
Yes. Eldeco Samridhi is registered with UPRERA under registration number UPRERAPRJ6773, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Eldeco Samridhi been completed?
UPRERA lists Eldeco Samridhi as completed, with a completion certificate dated 27 Sept 2019, against a filed deadline of 27 Feb 2021.
Who is the builder of Eldeco Samridhi?
ELDECO Housing and Industries Ltd. is the promoter entity that filed Eldeco Samridhi with UPRERA (promoter RERA ID UPRERAPRM21). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Eldeco Samridhi more time to complete?
UPRERA's record carries 1 completion extension for Eldeco Samridhi, the latest running to 27 Feb 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Eldeco Samridhi have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Eldeco Samridhi located?
Eldeco Samridhi is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗