Eldeco Trinity

UPRERARegistered

Eldeco Trinity is a RERA-registered residential project by Eldeco Inception Buildtech Private Limited in Sarsawan, Lucknow (RERA ID UPRERAPRJ787868). Registered with a completion deadline of 20 Sept 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
0%Q3'25
29.37%Q4'25
34.35%Q1'26
35%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ787868
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Dec 2023
Project duration58 months
AddressPlot no GGN-GH-2 , Emmar MGF Gomti Greens integrated township, Lucknow, Sarsawan, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressEldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    GroupHousing/09285/LDA/BP/22-23/4139/31082023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Jan 2024
Original completion20 Sept 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹68,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors192 · 3 · 27 (units from plan)
Homes · commercial units184 · 8 (shops and offices filed in the same plan)
  • 3 BHK130 68%
  • 4 BHK44 23%
  • SHOP8 4%
  • PENTHOUSE8 4%
  • 2 BHK2 1%
ConfigurationUnitsCarpet area
SHOP88-19
4 BHK44182
3 BHK130120-150
2 BHK298
PENTHOUSE8119-181
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Faith · OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE27508-182
Harmony · OTHER, 3 BHK, 2 BHK, PENTHOUSE279298-125
Wisdom · OTHER, SHOP, 4 BHK, 3 BHK, PENTHOUSE27508-182
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Kulmeet Shangari - ACPL Design Limited
License CA/97/21741
E24, south Extension 1, New Delhi 110049
Engineer
Mr. Pankish Goel - TPC Pvt Ltd
B-74, Sec 57, Noida, U.P India
Contractor
Mr. S.N Tiwari - Prabha Enterprises
182C, Eldeco Udyan 1, Bangla Bazar, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Proposed Group Housing Colony scheme over an area measuring 3.111 acres at Gomti Nagar, Lucknow. Uttar Pradesh. Plot is well demarcated at the site.
2Boundary Wall
1.5 M High brick wall and 0.9 M .High railing on 3 side boundary wall. Road side boundary/railing shall be as per design.
3Road Work
C.C internal roads along with side pavings shall be constructed as per the landscape design.
4Footpaths
Paved footpaths proposed as per landscape design.
5Water Supply Including Drinking Water Facilities
We propose to connect the incoming water supply to fill the raw water tanks and after treatment through filter and chlorination, this water will be used to fill underground static fire water tanks. Overflow from the underground static fire water tank will be connected to the underground domestic water tank. Stored and disinfected water from the underground domestic storage tank will be pumped to terrace level overhead water tank each residential towers through on set of VFD based Pumps. Top most four levels of Residential towers will be fed through a variable frequency driven Hydro-Pneumatic system with adequate capacity and maintaining the pressure. All floors down below will be fed by gravity Treated water sourced from the Sewage Treatment Plant will be stored in separate tank, proposed along with the sewage treatment plant at the basement. This will be used for flushing irrigation. Stored and disinfected water from the STP flushing water storage tank will be pumped to overhead water tanks located at terrace level through one set of VFD based pumps. Flushing water Supply to residential tower shall be fed from the overhead flushing water tank by gravity.
6Sewer System
A well design sewerage system shall be laid to collect soil water/waste which in turn connect to the proposed sewer main line and will be connected to the centralized Sewage treatment plant of 110 KLD located at the basement level. Surplus treated effluent from the sewage treatment plant will be by passed to Municipal sewer line after treatment.
7Drain
A well designed system of covered and under ground drainage system shall be in place. Water collected through this storm water drain along with rain water from the roof will be diverted to 6 nos rainwater harvesting arrangement.
8Parks
All the green pockets will have grass cover with a minimum paved area and sitting/play arrangements. Low height plantation will be part of it.
9Tree Planting
4.5 to 6 mt high trees will be along green belt between boundary wall and open parking lot.
10Design For Electric Supply Including Street Lighting
Connection shall be obtained from state electricity board for 2500 kva load. transformer capacity 1000kva- 2 nos for residential load and 630 kva - 1 no for common and mandatory service load.
11Community Buildings
A well designed club house is part of the scheme.
12Treatment and Disposal System of Sewage and Sullage water
A well designed STP is in place to take care of sewage and sullage water.
13Solid Waste Management And Disposal System
Collection/disposal of solid waste shall be coordinated with Lucknow Nagar Nigam
14Water Conservation System
Low flow fixture shall be used and STP treated water shall be used for flushing, irrigation and DG cooling tower. Terrace storm water shall be harvested to recharge under ground water.
15Energy Management System Including Use of Renewable Energy
The power shall be supplied by state Electricity Board. DG sets (CPCB4COMPILED) Capacity 500 KVA - 1 No 250 KVA- 1 no are proposed to meet requirement of power back up during power failure. Solar powered Street lights will be provided for street Lighting, landscape area and common area lights shall be sensor based to save energy.
16Fire Protection And Fire Safety System
A well designed fire fighting/evacuation arrangement shall be in place with fire alarm system , pressurized fire escapes, wet risers, sprinklers and fire extinguishers.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Amenities like kids play area, senior citizen area, play courts are provided for the residence of the proposed housing colony. Convenient shopping provided as per statutory.
18Emergency Evacuation Services
All the exit points with adequate width (as per norms) available to facilitate evacuation in case of an emergency. PA system shall be provided.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

68 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ABHINAV KHAREUPRERAAGT14915
3Abhishek KumarUPRERAAGT17780
4Aman ChawlaUPRERAAGT11258
5AMIT AGARWALUPRERAAGT11945
6AMIT GULATIUPRERAAGT12150
7ANAROCK Property Consultants Private LimitedUPRERAAGT10265
8ANIL KUMAR VERMAUPRERAAGT14346
9ARJUN SINGH YADAVUPRERAAGT11879
10ARTI TIWARIUPRERAAGT14234
11ASHUTOSH GUPTAUPRERAAGT20401
12Asit Gupta C/O Dwelling HomesUPRERAAGT20902
13Bhan Pratap Singh C/o Pratap AssociatesUPRERAAGT16163
14BIPIN CHANDRA PANTUPRERAAGT13687
15BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
16Deewakar Pratap RoyUPRERAAGT17890
17DEVENDRA VERMAUPRERAAGT14290
18Gagan TondonUPRERAAGT14217
19GOLDEN ESTATEUPRERAAGT10397
20GOLDEN STAR REAL ESTATESUPRERAAGT10303
21HARPREET KAURUPRERAAGT10411
22Hitesh KesarwaniUPRERAAGT11538
23Housenotch Private LimitedUPRERAAGT22132
24INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
25Karshni Buildwell Pvt LtdUPRERAAGT11401
26KAUSHTUBH REALTY PRIVET LIMITEDUPRERAAGT13025
27KRISHNA MURARIUPRERAAGT15726
28Md Imran AhmadUPRERAAGT24845
29Mohd Atif AliUPRERAAGT17360
30Mr. Janardan AgarwalUPRERAAGT10555
31Mukesh kumar SharmaUPRERAAGT11494
32Navneet Kumar SrivastavaUPRERAAGT10019
33OPAL PROPERTY SOLUTIONS PRIVATE LIMITEDUPRERAAGT13636
34Pankaj MittalUPRERAAGT13523
35PIXEL GLOBAL INFRA PRIVATE LIMITEDUPRERAAGT13936
36Prem Prakash KhareUPRERAAGT13677
37Propertypistol Realty Pvt LtdUPRERAAGT12730
38Rajni DawraUPRERAAGT13519
39RAKESH DEWANUPRERAAGT15661
40RANVEER SINGH YADAVUPRERAAGT12623
41REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD)UPRERAAGT18286
42REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
43REETA MAURYA C/O SHIVA ASSOCIATEUPRERAAGT13650
44RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
45Resicom Forever Private LimitedUPRERAAGT21912
46Sakshi GuptaUPRERAAGT16025
47SANJEEV KUMAR BANKAUPRERAAGT10894
48SDR INFRA BUILD PVT LTDUPRERAAGT11062
49SHAH MOHSIN KAMALUPRERAAGT14208
50SILVER EDGE REAL ESTATE SOLUTIONUPRERAAGT12168
51Smart InfraReality Private LimitedUPRERAAGT10057
52SMC Real Estate Advisors Private LimitedUPRERAAGT10113
53STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
54SUNIL KUMAR PRAJAPATIUPRERAAGT12499
55TARUN PREET SINGH SAHNIUPRERAAGT12537
56Tushar ChandaniUPRERAAGT12001
57Unnisis Infrratech Private LimitedUPRERAAGT15300
58VAAP ESTATE PRIVATE LIMITEDUPRERAAGT23033
59Vajrakaya Buildwell Private LimitedUPRERAAGT12913
60VANDANA AGARWALUPRERAAGT13353
61Varun Properties Inc.UPRERAAGT11985
62Vikas SinghUPRERAAGT11446
63Vikram singhUPRERAAGT10860
64VIMLESH PRATAP SINGHUPRERAAGT11674
65VIRENDRA KUMAR DEWANUPRERAAGT13205
66vishal srivastavaUPRERAAGT11982
67VISHESH SRIVASTAVAUPRERAAGT11416
68VIVEK SHARMAUPRERAAGT22609
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 20 Sept 2028.

Sanctioned by Lucknow Development Authority · 12,541 sqm of land · an approved plan of 3 blocks and 192 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
GroupHousing/09285/LDA/BP/22-23/4139/3108202321 Sept 202320 Sept 202819 Sept 203120 Sept 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-2,GGN12541Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 23544
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Dec 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Nov 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New8 Nov 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New17 Nov 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New15 Nov 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New8 Nov 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New8 Nov 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New8 Dec 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New8 Nov 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New8 Dec 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Nov 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Nov 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Nov 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New8 Dec 2023 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New17 Nov 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2026-Q2.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q329.37%CA ↗ · Arch ↗ · Eng ↗
2025-Q434.35%CA ↗ · Arch ↗ · Eng ↗
2026-Q135%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameEldeco Inception Buildtech Private Limited
RolePromoter · current
RERA IDUPRERAPRM264184
PANAAGCI7606B
CIN / TANU70109UP2022PTC167482
Name of chairmanPankaj Jain
Registered addressEldeco Corporate Chamber- I, 2nd Floor, Vibhuti Khand (Opp. Mandi Parishad) Gomti Nagar Lucknow-226010
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ELDECO INCEPBTPL COLA/CFR ELD TRINITY-ESBankHDFC BankBranchLucknow,Pranay TowersBranch addressPranay Towers, 38 Darbari Lal Sharma Marg,Lucknow-226001Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594Branch emailpreeti.malviya@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ELDECO INCEPBTPL SEPA/CFR ELD TRINITY-ESBankHDFC BankBranchLucknow,Pranay TowersBranch addressPranay Towers, 38 Darbari Lal Sharma Marg,Lucknow-226001Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ELDECO INCEPBTPL TRAA/CFR ELD TRINITY-ESBankHDFC BankBranchLucknow,Pranay TowersBranch addressPranay Towers, 38 Darbari Lal Sharma Marg,Lucknow-226001Branch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0000594
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eldeco Trinity

Is Eldeco Trinity RERA registered?

Yes. Eldeco Trinity is registered with UPRERA under registration number UPRERAPRJ787868, registered on 10 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Eldeco Trinity?

The completion date filed with UPRERA is 20 Sept 2028. No completion certificate is on record yet.

Who is the builder of Eldeco Trinity?

Eldeco Inception Buildtech Private Limited is the promoter entity that filed Eldeco Trinity with UPRERA (promoter RERA ID UPRERAPRM264184). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Eldeco Trinity have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eldeco Trinity located?

Eldeco Trinity is registered in Sarsawan, Lucknow, as filed with UPRERA.

What configurations are available in Eldeco Trinity?

The unit plan filed with UPRERA lists OTHER, SHOP, 4 BHK, 3 BHK, 2 BHK and PENTHOUSE. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eldeco Trinity?

The approved unit plan filed with UPRERA runs from 8 to 182 m² of carpet area (about 86 to 1,954 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eldeco Trinity?

The approved unit plan describes 3 blocks and 192 units of which 184 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eldeco Trinity?

About 62 units per acre: 192 planned units across 3.10 acres (12,541 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗