Exotica 132 is a RERA-registered commercial project by EXOTICA INFRATECH LLP in Sector 132, Noida, Gautam Budh Nagar (RERA ID UPRERAPRJ731857). Registered with a completion deadline of 10 Jan 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ731857 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Mar 2025 |
| Project duration | 59 months |
| Address | Plot No. A-3A, Sector 132, Noida, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Limited Liability Partnership (LLP) |
| Applicant address | 228 BASEMENT JAGRITI ENCLAVE GATE NO 1 SHAHDARA , NEW DELHI-110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2024/12/27/11748
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Apr 2025 |
| Original completion | 10 Jan 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,32,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER294 74%
- SHOP106 27%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 106 | 20-61 |
| OTHER | 294 | 44-470 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Commercial · SHOP | 3 | 106 | 20-61 |
| Tower-2 · OTHER | 28 | 294 | 44-470 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per Lease plan |
| 2 | Boundary Wall Front Boundary wall 1.5m High and Side Boundary Wall 2.0m high boundary wall. Brick work and permanent furnishing on boundary wall. |
| 3 | Road Work 6.0 m wide internal road finished in a Cement concrete. |
| 4 | Footpaths Stone Paving as per landscape architect plan. |
| 5 | Water Supply Including Drinking Water Facilities Water supply to be taken from Concern Authority. |
| 6 | Sewer System Underground Sewer Line will be laid. STP will be installed. Sewer connection will be obtained from authority. |
| 7 | Drain Drain line will be laid and connection will be obtained from authority. |
| 8 | Parks Landscaping with plantation including trees, shrubs and ground covers and recreational areas with benches and walkways. |
| 9 | Tree Planting As per landscape consultant / as per IGBC green building norms. One tree per 100 sqmt. of open area is proposed. |
| 10 | Design For Electric Supply Including Street Lighting HT power connection will be hired from concern Authority. Electrical substation will be installed in the project with dedicated Transformers, HT/LT Panels and DG Sets. Street lights will be installed with Grid Power supply as well as backup power supply. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Dedicated Sewage Treatment Plant will be installed for Sewage Treatment. |
| 13 | Solid Waste Management And Disposal System Organic waste composter will be installed for solid waste management. Disposal of organic waste will be done through authorised agency. |
| 14 | Water Conservation System Rain water harvesting chambers will be installed. |
| 15 | Energy Management System Including Use of Renewable Energy Grid Supply - Concern Authority.
Backup Power - DG with CPCB guidelines
Emergency power - UPS
Renewable power - Solar as per MOEF guidelines
Equipment selection - with proper energy efficiency as per green building norms. |
| 16 | Fire Protection And Fire Safety System The project falls under IT/ITES Project Buildings. Fire Protection and Fire Safety System shall as per the NBC-2016 and other relavent code. Internal and external fire hydrant system shall be provided with landing valve, hose reel with shut off nozzle, short branch pipe with nozzle and fire mans axe. Automatic sprinkler system is provided. The system shall be suitably zoned for its optimum functional performance. Sprinklers shall be distributed throughout the building as per the National Building code. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Common Washroom at Ground Ivl. etc. |
| 18 | Emergency Evacuation Services Fire Staircase provided as per sanction plan. |
| 19 | Other Miscellaneous Work As Per Plan |
Registered agents
26 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 DEGREE VENTURES PRIVATE LIMITED | UPRERAAGT18728 |
| 2 | 360 REALTORS LLP | UPRERAAGT10868 |
| 3 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 4 | BLUE SAPPHIRE INFRASTRUCTURE LLP | UPRERAAGT23418 |
| 5 | BLUECRUMBS INFRA PRIVATE LIMITED | UPRERAAGT16897 |
| 6 | BOP REALTY PRIVATE LIMITED | UPRERAAGT10206 |
| 7 | BULLMEN REALTY INDIA PRIVATE LIMITED | UPRERAAGT10138 |
| 8 | BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED) | UPRERAAGT11569 |
| 9 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 10 | FIRSTDOOR REALTY LLP | UPRERAAGT23971 |
| 11 | KARTIK INFRATOWN PRIVATE LIMITED | UPRERAAGT10413 |
| 12 | M/s MONEYTREE REALTY SERVICES LIMITED formally known as (M/s Moneytree Reality Services Private Limited) | UPRERAAGT25048 |
| 13 | M/s Northbrick Consultancy Pvt Ltd.(formerly Known as Northbrick ventures Pvt Ltd) | UPRERAAGT16860 |
| 14 | muskan realtors | UPRERAAGT10510 |
| 15 | ORANGE DOOR INFRA PRIVATE LIMITED | UPRERAAGT15693 |
| 16 | Pankaj Gupta | UPRERAAGT26341 |
| 17 | Propertypistol Realty Pvt Ltd | UPRERAAGT12730 |
| 18 | RAVS INFRATECH PRIVATE LIMITED | UPRERAAGT20392 |
| 19 | Rudra prop solutions Bharat singh | UPRERAAGT16810 |
| 20 | Sachan Estate Pvt Ltd | UPRERAAGT10143 |
| 21 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 22 | star estate | UPRERAAGT10202 |
| 23 | TRUHOMES REALTY | UPRERAAGT10997 |
| 24 | Vishal | UPRERAAGT24345 |
| 25 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
| 26 | WEALTHCHOICE INFRATECH PRIVATE LIMITED | UPRERAAGT25654 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 10 Jan 2030.
Sanctioned by Noida Authority · 12,146 sqm of land · an approved plan of 2 blocks and 400 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2024/12/27/11748 | 11 Jan 2025 | 10 Jan 2030 | 10 Jan 2035 | 10 Jan 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| A3A, Sector 132, NOIDA | 20242.60 | Plot |
| Registry document · 7138, Bahi 1, Zild No. 1427, Page Nos. from 191 to 390 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Mar 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 19 Mar 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 19 Mar 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 19 Mar 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 10 Mar 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 10 Mar 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 10 Mar 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 10 Mar 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 10 Mar 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 10 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 10 Mar 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 10 Mar 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 19 Mar 2025 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 2.9% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 7.2% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 8.16% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 8.43% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | EXOTICA INFRATECH LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM343361 |
| PAN | AAKFE9860C |
| CIN / TAN | DELE18406D |
| Registered address | 228 BASEMENT JAGRITI ENCLAVE GATE NO 1 SHAHDARA , NEW DELHI-110092 |
| RERA contact | |
| Registered since | 2025 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Exotica Infratech LLP Collection Account for Exotica 132BankPunjab & Sind BankBranchAtta, NoidaBranch addressD2C Sector 18 Noida Gautam Buddha NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCPSIB0000426Branch emailA0426@PSB.CO.IN |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Exotica Infratech LLP Separate Bank Account for Exotica 132BankPunjab and Sind BankBranchAtta, NoidaBranch addressD2C Sector 18 Noida Gautam Buddha NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCPSIB0000426 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Exotica Infratech LLP RERA Transaction Account for Exotica 132BankPunjab and Sind BankBranchAtta, NoidaBranch addressD2C Sector 18 Noida Gautam Buddha NagarBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCPSIB0000426 |
What has changed on this record
20 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Filed document viewprojects · 17 | Proforma of Agreement for Sale newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 16 | ENGINEERS CERTIFICATE newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 15 | ARCHITECT CERTIFICATE newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 14 | CA CERTIFICATE newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 13 | Affidavit (Form-B) newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 12 | Development Work Plan newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 11 | Electricity Supply Plan newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 10 | Water Supply Plan newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 9 | Waste Disposal Plan newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 8 | Proforma of Conveyance Deed newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 7 | Proforma of Allotment Letter newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 6 | Proforma of Application Form newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 5 | Other Plan(If Any) newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 4 | Commencement Certificate newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 3 | Details of Encumbrances newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 2 | Other newly filed with RERA | 18 Oct 2026 |
| Filed document viewprojects · 1 | Proforma of Completion Certificate(Occupancy) newly filed with RERA | 18 Oct 2026 |
| Filed document summary · 18 | Details of Encumbrances no longer on the record | 18 Oct 2026 |
| Filed document summary · 17 | Commencement Certificate no longer on the record | 18 Oct 2026 |
| Filed document summary · 16 | Other Plan(If Any) no longer on the record | 18 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Exotica 132
Is Exotica 132 RERA registered?
Yes. Exotica 132 is registered with UPRERA under registration number UPRERAPRJ731857, registered on 15 Apr 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Exotica 132?
The completion date filed with UPRERA is 10 Jan 2030. No completion certificate is on record yet.
Who is the builder of Exotica 132?
EXOTICA INFRATECH LLP is the promoter entity that filed Exotica 132 with UPRERA (promoter RERA ID UPRERAPRM343361). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Exotica 132 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Exotica 132 located?
Exotica 132 is registered in Sector 132, Noida, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in Exotica 132?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Exotica 132?
The approved unit plan filed with UPRERA runs from 20 to 470 m² of carpet area (about 212 to 5,056 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Exotica 132?
The approved unit plan describes 2 blocks and 400 units of which 294 are homes and 106 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Exotica 132?
About 133 units per acre: 400 planned units across 3.00 acres (12,146 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗