UTC Softech is a RERA-registered commercial project by UTC Softech Private Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ6886). Registered with a completion deadline of 30 Jul 2019.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6886 |
| Project category | Commercial |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 30 Jul 2013 |
| Original start | 30 Jul 2013 |
| Project duration | 73 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | Plot No-B-35 , Sector-132, Noida, GB Nagar, Uttar Pradesh |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
V-509/216
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Aug 2017 |
| Original completion | 30 Jul 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 31 Jul 2020 |
| Registration fee | ₹2,12,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | — | 72-1,005 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · OTHER, SHOP | 17 | — | 72-498 |
| B · SHOP | 14 | — | 73-362 |
| C · OTHER, SHOP | 15 | — | 73-369 |
| D · OTHER, SHOP | 19 | — | 106-414 |
| I.S · OTHER, SHOP | 6 | — | 892-896 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved plan |
| 2 | Boundary Wall as per location plan |
| 3 | Road Work as per approved plan |
| 4 | Footpaths as per approved plan |
| 5 | Water Supply Including Drinking Water Facilities As per location and development plan |
| 6 | Sewer System As per development plan |
| 7 | Drain as per development plan |
| 8 | Parks as per development plan |
| 9 | Tree Planting as per authority plan |
| 10 | Design For Electric Supply Including Street Lighting as per authority plan |
| 11 | Community Buildings As per approved map |
| 12 | Treatment and Disposal System of Sewage and Sullage water as per development plan |
| 13 | Solid Waste Management And Disposal System as per development plan |
| 14 | Water Conservation System as per development plan |
| 15 | Energy Management System Including Use of Renewable Energy as per environment approval |
| 16 | Fire Protection And Fire Safety System as per fire department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services as per development plan |
| 18 | Emergency Evacuation Services as per fire department |
| 19 | Other Miscellaneous Work as per sactioned plan |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 31 Jul 2019.
Sanctioned by Noida Authority · 20,116 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Revised end | Documents filed |
|---|---|---|---|---|
| V-509/216 | 30 Jul 2013 | 31 Jul 2019 | 30 Jul 2019 |
| Document | File |
|---|---|
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
3 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
Document checklist| Document | Status | Uploaded |
|---|---|---|
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 11 Mar 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 22 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 22 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | As per Plan |
| Fire safety (as filed with RERA) | As per plan |
| Health service | as per plan |
| Renewable energy | As per layout plan |
| Other facilities | as per layout plan |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | UTC Softech Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5286 |
| PAN | AALCS3608J |
| CIN / TAN | U70200DL2007PTC170285 |
| Name of chairman | BABLU KUMAR |
| Registered address | Plot No-B-35 , Sector-132, Noida, GB Nagar, Uttar Pradesh |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | UTC SOFTECH PRIVATE LIMITEDBankAxis Bank LimitedBranchSECTOR 7, FARIDABADA/C no.IFSCUTIB000039 |
What has changed on this record
6 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 164 (Under Registration - 1 ) → 164 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 164 (Under Registration - 2 ) → 164 (Under Registration - 1 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 164 (Under Registration - 3 ) → 164 (Under Registration - 2 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 163 (Under Registration - 2 ) → 164 (Under Registration - 3 ) changed in Estanzo’s record | 15 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 163 (Under Registration - 3 ) → 163 (Under Registration - 2 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 162 (Under Registration - 2 ) → 163 (Under Registration - 3 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 6 movements on record |
What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No registry, lease deed or land-title document is published for this project.Ask to see the registered deed for the plot and how the promoter holds the land - freehold, leased from the development authority, or under an agreement with a landowner.
- No khasra or plot detail is published for this project.Ask which khasra numbers the project stands on, so the plot can be matched against the deed and the revenue record.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about UTC Softech
Is UTC Softech RERA registered?
Yes. UTC Softech is registered with UPRERA under registration number UPRERAPRJ6886, registered on 10 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has UTC Softech been completed?
UPRERA still lists UTC Softech as Registered, so it is not shown as completed here. A completion certificate dated 31 Jul 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of UTC Softech?
UTC Softech Private Limited is the promoter entity that filed UTC Softech with UPRERA (promoter RERA ID UPRERAPRM5286). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does UTC Softech have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is UTC Softech located?
UTC Softech is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in UTC Softech?
The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in UTC Softech?
The approved unit plan filed with UPRERA runs from 72 to 1,005 m² of carpet area (about 779 to 10,816 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗