Ganpati Smart City - Samriddhi Comfort Homes

UPRERARegistered

Ganpati Smart City - Samriddhi Comfort Homes is a RERA-registered residential project by GANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED in Bainpur Road, Sikandra, Agra.;, Agra (RERA ID UPRERAPRJ400642). Registered with a completion deadline of 24 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
44%Q3'24
44%Q4'24
44%Q1'25
44%Q2'25
44%Q3'25
44%Q4'25
44%Q1'26
46.29%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ400642
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAgra Development Authority
Proposed start13 May 2024
Project duration30 months
AddressBinpur Road, Sikandra, Agra., Bainpur Road, Sikandra, Agra.;, Agra, Agra
TehsilAgra
Applicant typeCompany
Applicant address31/472 C1,IST FLORE ,GANASH PLAZA SULTAN GANJ PULIYA PIPASS ROAD AGRA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    AFFORDABLEHOUSING/04819/ADA/23-24/0169/04092023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Sept 2024
Original completion24 Oct 2026
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹22,000
Sanctioning authorityAgra Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors412 · 3 · 10 (units from plan)
  • 2 BHK356 86%
  • 3 BHK56 14%
ConfigurationUnitsCarpet area
3 BHK5672
2 BHK35640-55
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Gomti Tower - 1 · 2 BHK1017640
Kaveri Tower - 1 · 2 BHK1018055
Narmada Tower -1 · 3 BHK75672
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Tapan Kumar
License CA/2022/30011
A-302, Aditya Celebrity Homes, Sec-76, Noida-201301
Engineer
SANTOSH KUMAR
7/121, (B), SWAROOP NAGAR, KANPUR, UTTAR PRADESH - 208002
Contractor
Maa Pitambara Infratech
Villageand Post Budhana Tajganj Agra 282006
Sr.Development work declared to RERA
1Demarcation of Plots
As per the approved sanctioned plan. This is a single plot having a total of 1no.of the entry gate and 1no. of the exit gate from the 60-foot wide road and 45 foot internal road.
2Boundary Wall
2-meter height and 180 mm thick boundary wall designed or with MS railing as created by the designer. Brock work of 9 inches and RCC work in column and beam may be used. The Entrance and exit gate are already constructed at the site of the MS steel structure.
3Road Work
The approach road to the project and the inner road connecting the towers and projects have already been completed with RCC and cement block with a 60-foot wide road.
4Footpaths
All footpaths are completed with well-designed and constructed RCC and cemented blocks with 20-foot footpaths.
5Water Supply Including Drinking Water Facilities
A bore well will supply drinking water, and the bore well will manage the water supply for the rest of the service.
6Sewer System
A centralized sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment, water shall be recycled and used in gardening flush tanks—vehicle washing. Whenever overflow from the STP is connected to the municipal sewerage system,
7Drain
A drain water system shall be provided. Strom water from the road and other landscape areas shall be connected to the stormwater drain channel and recharged in the rainwater harvesting pit. Groundwater and overflow shall be associated with the municipal drain line.
8Parks
All parks have been constructed with the best landscaping and greenery and look beautiful.
9Tree Planting
Tree plantation has been completed at the site as per designed by the landscaping architect.
10Design For Electric Supply Including Street Lighting
All street light poles are installed at the site. Street poles cover the whole site. The electricity supply at the site started, and the supply of electric poles began.
11Community Buildings
The clubhouse was developed at the site with all amenities i.e. swimming pool, gym, kids playroom games room, etc.
12Treatment and Disposal System of Sewage and Sullage water
STP was constructed at the site and running smoothly with 550 KLD
13Solid Waste Management And Disposal System
Dalab Ghar will be constructed at the site.
14Water Conservation System
A rainwater harvesting system will be installed at the site.
15Energy Management System Including Use of Renewable Energy
Not to be provided.
16Fire Protection And Fire Safety System
The fire plan is clearly marked and indicates the complete fire protection arrangement at the site and the means of access/escape for the proposed building with suitable legend along with standard signs and symbols on the drawing.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not to be provided.
18Emergency Evacuation Services
A fire staircase with fire-resistant doors is provided in each building. A dedicated assembly area is also defined on the campus. Also, adequate signage shall be provided.
19Other Miscellaneous Work
Temple, Fountain, etc.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1SPN PROPMART LLPUPRERAAGT10604
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 24 Oct 2026.

Sanctioned by Agra Development Authority · 22,493 sqm of land · an approved plan of 3 blocks and 412 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
AFFORDABLEHOUSING/04819/ADA/23-24/0169/0409202325 Oct 202324 Oct 202624 Oct 202624 Oct 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

33 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1/4, 1/5, 1/13, 20 to 25, 26/2, 42 to 53, 56, 8, 929948Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · High Court merger order of Archana Housing Pvt Ltd merged into Ganpati Infrastructure Development Co
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New23 Jul 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New8 Jun 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New8 Jun 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jul 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jul 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jul 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jul 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New23 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Jul 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New23 Jul 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New24 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New24 Jul 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q144%CA ↗ · Arch ↗ · Eng ↗
2024-Q244%CA ↗ · Arch ↗ · Eng ↗
2024-Q344%CA ↗ · Arch ↗ · Eng ↗
2024-Q444%CA ↗ · Arch ↗ · Eng ↗
2025-Q144%CA ↗ · Arch ↗ · Eng ↗
2025-Q244%CA ↗ · Arch ↗ · Eng ↗
2025-Q344%CA ↗ · Arch ↗ · Eng ↗
2025-Q444%CA ↗ · Arch ↗ · Eng ↗
2026-Q146.29%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
RolePromoter · current
RERA IDUPRERAPRM2735
PANAAECG6731F
CIN / TANU70102UP2012PLC049767
Name of chairmanANIL AGARWAL
Registered address31/472 C1,IST FLORE ,GANASH PLAZA SULTAN GANJ PULIYA PIPASS ROAD AGRA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Agra

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
GANPATI INFRASTRUCTURE DEVELOPMENT CO LTD - SMART CITY SAMRIDDHI COMFORT HOMES COLLECTION A/CBankSBIBranchAGRA BRANCHBranch addressSME IND. ESTATE NUNHAI BRANCHBranch districtAgraA/C no.IFSCSBIN0001126Branch emailsbi.01126@sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
GANPATI INFRASTRUCTURE DEVELOPMENT CO LTD - SMART CITY SAMRIDDHI COMFORT HOMES SEPARATE A/CBankSTATE BANK OF INDIABranchSME BRANCH AGRABranch addressSME BRANCH NUNHAI IND. ESTATE AGRABranch districtAgra, Uttar PradeshA/C no.IFSCSBIN0001126
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
GANPATI INFRASTRUCTURE DEVELOPMENT CO LTD - SMART CITY SAMRIDDHI COMFORT HOMESTRANSACTION A/CBankSTATE BANK OF INDIABranchSME BRANCH AGRABranch addressSME BRANCH NUNHAI IND. ESTATE AGRABranch districtAgra, Uttar PradeshA/C no.IFSCSBIN0001126
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)24 (Under Registration - 1 ) → 24 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Ganpati Smart City - Samriddhi Comfort Homes

Is Ganpati Smart City - Samriddhi Comfort Homes RERA registered?

Yes. Ganpati Smart City - Samriddhi Comfort Homes is registered with UPRERA under registration number UPRERAPRJ400642, registered on 30 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Ganpati Smart City - Samriddhi Comfort Homes?

The completion date filed with UPRERA is 24 Oct 2026. No completion certificate is on record yet.

Who is the builder of Ganpati Smart City - Samriddhi Comfort Homes?

GANPATI INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED is the promoter entity that filed Ganpati Smart City - Samriddhi Comfort Homes with UPRERA (promoter RERA ID UPRERAPRM2735). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Ganpati Smart City - Samriddhi Comfort Homes have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Ganpati Smart City - Samriddhi Comfort Homes located?

Ganpati Smart City - Samriddhi Comfort Homes is registered in Bainpur Road, Sikandra, Agra.;, Agra, as filed with UPRERA.

What configurations are available in Ganpati Smart City - Samriddhi Comfort Homes?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Ganpati Smart City - Samriddhi Comfort Homes?

The approved unit plan filed with UPRERA runs from 40 to 72 m² of carpet area (about 433 to 777 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Ganpati Smart City - Samriddhi Comfort Homes?

The approved unit plan describes 3 blocks and 412 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Ganpati Smart City - Samriddhi Comfort Homes?

About 74 units per acre: 412 planned units across 5.56 acres (22,493 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.