GAUR ALARIS (PHASE 1) is a RERA-registered residential project by Gaursons India Private Limited in SECTOR-22D, Gautam Budh Nagar (RERA ID UPRERAPRJ950965). Registered with a completion deadline of 9 Jun 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ950965 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Yamuna Expressway Authority |
| Proposed start | 11 Jun 2026 |
| Project duration | 60 months |
| Address | PLOT NO. GH-13, SECTOR-22D, YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY, GAUTAM BUDDHA NAGAR (U.P), PIN 203209, SECTOR-22D, Jewar, Gautam Budh Nagar |
| Tehsil | Jewar |
| Applicant type | Company |
| Applicant address | Office No-F-101, First Floor, Plot no 2/3 Ashish Commercial Complex,LSC,New Rajdha, ni Enclave, East Delhi, Delhi, Delhi, India, 110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
YEIDA/202606100122/2026/04/02/S/3173
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Jul 2026 |
| Original completion | 9 Jun 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,01,000 |
| Sanctioning authority | Yamuna Expressway Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 1,088 | 77-96 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| AUREA · 3 BHK | 34 | 136 | 77-96 |
| AZURA · 3 BHK | 34 | 136 | 77 |
| ELANCE · 3 BHK | 34 | 136 | 77 |
| ELARA · 3 BHK | 34 | 136 | 77 |
| ELEGANZA · 3 BHK | 34 | 136 | 77-96 |
| EVANIA · 3 BHK | 34 | 136 | 77 |
| GAUDIUM · 3 BHK | 34 | 136 | 77 |
| ORLENA · 3 BHK | 34 | 136 | 77 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots The demarcated complex is situated at Plot No. GH-13, Sector-22D, YEIDA, Greater Noida, District Gautam Budh Nagar (U.P.), having a total plot area of 47,755.00 sq. mt., out of which 39145.00 sq. mt. has been designated as the development plan area for Phase 1. The project is proposed to be developed in two phases. Phase 1 (Gaur Alaris) comprises 8 residential towers—Eleganza, Evania, Gaudium, Elance, Azura, Orlena, Elara, and Aurea—along with Club Regalia, while the remaining development shall be undertaken in Phase 2. Presently, development work is being carried out for Phase 1 only, covering an area of 39145.00 sq. mt., as specified in the development scope. The plans for this phase have been duly approved by the Yamuna Expressway Industrial Development Authority (YEIDA). |
| 2 | Boundary Wall Well-defined plot boundaries proposed to ensure the security and privacy of the project. Development of the boundary wall (230 mm thickness of Concrete wall with minimum height of as per building Bye-Laws or design). |
| 3 | Road Work Efficient road network for smooth connectivity between the various Housing Blocks within the project premises has been proposed as given in the sanctioned site plan. Development of either Black-top roads (265 mm thick GSB - 100 mm WMM under 100 MM, WBM- 40 MM and BC-25 mm thick bitumen material) or RCC Roads (Reinforced concrete having a minimum 100 MM thickness as designed) or Paver-roads. |
| 4 | Footpaths Development of pathways for smooth pedestrian movement. Use of 60 mm to 80 mm thick Brick-type concrete/pavers and Grass pavers as per the design. Numbers of Crossing 18 Nos. (Annexure with development work plan, step 10.11). |
| 5 | Water Supply Including Drinking Water Facilities Installation of water supply systems to ensure a steady and safe domestic water supply, including provisions for landscape water requirements. Use of DI/GI/PPR/UPVC SCH-80 in Mainline, also UPVC and CPVC/GI/PPR pipe 15 MM to 80 MM as per the design requirements. Numbers of water connection 1 No, Tank capacity 250 KLD- 4 nos. Source of water by Municiple connection. (Annexure with water supply plan, step 10.9). |
| 6 | Sewer System Development of a Sewerage System to collect wastewater generated within the project premises including treatment and disposal of wastewater/sewage. Use of pipe having dia. of 150 mm and above with adequate numbers of inspection Chambers and Man-Holes based upon the design and site requirements. Also using DWC SN pipes of various grades as per the design. network design as per drawing. (Annexure with Sewarage layout plan, step 11.16). |
| 7 | Drain Development of drainage systems within the site to manage surface water and stormwater flow. In the Drainage System of the project, use of pipe having dia. of 200 mm and above and open Drains with adequate numbers of inspection Chambers and Man-Holes based upon the design and site requirements. Also using DWC SN pipes of various grades as per the design. (Annexure with Drainage layout plan). |
| 8 | Parks Development of landscape areas including green/open spaces/recreational areas/Tot-lots. Plantation of Shrubs besides planting Natural Grass and various water bodies, landscape features etc. as per the design. Use of Electrical poles having height of 4M in landscape areas. |
| 9 | Tree Planting Planting 396 Trees of various types based upon the prevailing building regulations; predominantly along the boundary wall of the project as shown in the site plan. (Annexure with area chart). |
| 10 | Design For Electric Supply Including Street Lighting Installation of Transformer capacity of 2500 KVA, including street lighting, basement lighting etc. to ensure adequate illumination and safety at all the project common areas. Use of 6 M to 9 M height electrical poles, as per design and site requirements with LED Lights. Number of Electricals Poles 30 Nos. and Transformer units 6 Nos. (Annexure with Electricity supply plan, Step 10.10). |
| 11 | Community Buildings The Community Building of the project having total Built-up area of 8254.07 Sq.m. Project at Four levels i.e. Basement Floor / Ground Floor/ Podium-01 /Stilt-01, Podium-02 / Stilt-02 and Stilt-03 having various activities Halls, Meeting Rooms, Gym, Music and Art Room, Waterbody, several Games Court, Kids Play area, Yoga Area etc. details of the same are given in the approved building plans. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Provision has been made for the installation of 1600 KLD STP to treat the sewage generated from the project and dispose of the surplus wastewater into the Municipal sewer line. (Annexure with sewarage layout plan, step 11.16). |
| 13 | Solid Waste Management And Disposal System Provision of 700 Kg Capacity OWC Machine for Solid Waste Management System to ensure proper collection, segregation, treatment and disposal of the solid waste as per the prevailing MSW Regulations. |
| 14 | Water Conservation System It is Green Building Group Housing Project which includes various measures for optimise use/conservation of water resources including Rainwater harvesting and dual banding system. The Flow rates of the proposed various Water Mixers including Faucets/Taps, Sink, Showerhead/Handheld Spray, Water Closets, Health Faucet etc. has been kept below normal flow rates for the project R.W.H 12 Nos. (Annexure with R.W.H. layout plan). |
| 15 | Energy Management System Including Use of Renewable Energy Proposed-Solar PV over the roof top of 100 kW with use of high efficiency low energy consuming LED Lights. NBC 2016 of the relevant by laws of the concerned Local Authority, Basement ventilation with ventilation fans. |
| 16 | Fire Protection And Fire Safety System As per fire drawings approved by the Fire department Installation of fire protection system and safety measures to prevent and mitigate fire hazards as specified in the NBC-2016. Horizontal Riser of 150 mm or as per the design calculation, Vertical riser of 150 mm or as per the Design Calculation and Branches of 25, 32, 40, 50, 65, 80 and 100 mm or as per the design calculation. M.S. C class pipe for 150 mm and below, M.S. pipe I.S. Code for 200 mm and Numbers of Hydrant 22 Nos. Fire exits 18 Nos. and number of Sprinklers 29500 Nos all above with fire alarm and other safety measure as per requirement as per building Bye-Laws or design. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services An emergency Evacuation Plan has been detailed out in the Environment Management Plan (EMP) in the EIA of the project which would be implemented with signage before completion of the project. |
| 18 | Emergency Evacuation Services An emergency Evacuation Plan has been detailed out in the Environment Management Plan (EMP) of the project which would be implemented with signage before completion of the project. |
| 19 | Other Miscellaneous Work As per the prevailing design/requirements including provisions for Earthquake Design Structures, Handicape Friendly and CCTV units 10 Nos. in Building Design as per building Bye-Laws of YEIDA. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Jun 2031.
Sanctioned by Yamuna Expressway Authority · 39,145 sqm of land · an approved plan of 8 blocks and 1088 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| YEIDA/202606100122/2026/04/02/S/3173 | 10 Jun 2026 | 9 Jun 2031 | 9 Jun 2034 | 9 Jun 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-13, SECTOR- 22D | 39145.00 | Plot |
| Registry document · 10861 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · YEAGH112025/01 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Lease deed · 10861 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Jun 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Jun 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 7 Jul 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 20 Jun 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 20 Jun 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 20 Jun 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 Jun 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Jun 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 15 Jun 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 7 Jul 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Jun 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Jun 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 15 Jun 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Jul 2026 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Gaursons India Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2019 |
| PAN | AACCG3895Q |
| CIN / TAN | U74899DL1995PTC064555 |
| Name of chairman | M.L Gaur |
| Registered address | Office No-F-101, First Floor, Plot no 2/3 Ashish Commercial Complex,LSC,New Rajdha, ni Enclave, East Delhi, Delhi, Delhi, India, 110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | GAURSONS INDIA PVT LTD COLLECTION A/C GAUR ALARIS (PHASE 1)BankHDFC BANKBranchSECTOR 62, NOIDABranch addressHDFC BANK LIMITED, NO. C/25, STELLAR IT PARK, SECTOR 62, NOIDA, UTTAR PRADESH, 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649Branch emailsimpy.kumari@hdfc.bank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | GAURSONS INDIA PVT LTD SEPARATE A/C GAUR ALARIS (PHASE 1)BankHDFC BANKBranchSECTOR 62, NOIDABranch addressHDFC BANK LIMITED, NO. C/25, STELLAR IT PARK, SECTOR 62, NOIDA, UTTAR PRADESH, 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | GAURSONS INDIA PVT LTD TRANSACTION A/C GAUR ALARIS (PHASE 1)BankHDFC BANKBranchSECTOR 62, NOIDABranch addressHDFC BANK LIMITED, NO. C/25, STELLAR IT PARK SECTOR 62, NOIDA , UTTAR PRADESH, 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649 |
What has changed on this record
4 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 105 (Under Registration - 2 ) → 107 (Under Registration - 4 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 104 (Under Registration - 1 ) → 105 (Under Registration - 2 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 104 (Under Registration - 4 ) → 104 (Under Registration - 1 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 103 (Under Registration - 3 ) → 104 (Under Registration - 4 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 15 Oct 2026 · 4 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GAUR ALARIS (PHASE 1)
Is GAUR ALARIS (PHASE 1) RERA registered?
Yes. GAUR ALARIS (PHASE 1) is registered with UPRERA under registration number UPRERAPRJ950965, registered on 28 Jul 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GAUR ALARIS (PHASE 1)?
The completion date filed with UPRERA is 9 Jun 2031. No completion certificate is on record yet.
Who is the builder of GAUR ALARIS (PHASE 1)?
Gaursons India Private Limited is the promoter entity that filed GAUR ALARIS (PHASE 1) with UPRERA (promoter RERA ID UPRERAPRM2019). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GAUR ALARIS (PHASE 1) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GAUR ALARIS (PHASE 1) located?
GAUR ALARIS (PHASE 1) is registered in SECTOR-22D, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in GAUR ALARIS (PHASE 1)?
The unit plan filed with UPRERA lists 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GAUR ALARIS (PHASE 1)?
The approved unit plan filed with UPRERA runs from 77 to 96 m² of carpet area (about 834 to 1,037 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GAUR ALARIS (PHASE 1)?
The approved unit plan describes 8 blocks and 1,088 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GAUR ALARIS (PHASE 1)?
About 112 units per acre: 1,088 planned units across 9.67 acres (39,145 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗