GH-1 Grand Omaxe Phase-5 is a RERA-registered residential project by Omaxe Limited in Lucknow (RERA ID UPRERAPRJ892218). Registered with a completion deadline of 20 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ892218 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Feb 2019 |
| Project duration | 89 months |
| Address | Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
42975
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
42975
Building permit sanctioned
42975
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 5 Mar 2019 |
| Original completion | 21 Dec 2025 |
| Revised completion | 20 Jun 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹52,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK129 98%
- 2 BHK1 1%
- 3 BHK1 1%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 1 | 117 |
| 3 BHK | 1 | 113 |
| 4 BHK | 129 | 127-131 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Kingston · 2 BHK, 3 BHK, 4 BHK | 22 | 131 | 113-131 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Front side Integrated Township, Mini Hazaratganj, Hazaratganj Commercial, Left side/Right side And Back Side Village Area |
| 2 | Boundary Wall All around side Boundary demarcation Done with Brick wall boundary |
| 3 | Road Work Road work will be developed as per approved drawings. |
| 4 | Footpaths Both side Pathway develop along approach road |
| 5 | Water Supply Including Drinking Water Facilities Water supply including drinking water facilities work will be done as per approved drawings provided. |
| 6 | Sewer System STP will be constructed at site |
| 7 | Drain Drainage work Will be constructed as per requirement and as per approved drawing and will connected with main line of Integrated township. |
| 8 | Parks Green area, Trees Plants will be developed as per specification and drawings. |
| 9 | Tree Planting Tree planting will be developed as per Landscape plan and requirements. |
| 10 | Design For Electric Supply Including Street Lighting ESS constructed for Integrated township. and electric supply Will be developed as per requirements. |
| 11 | Community Buildings Community Building (Club) provided in the Tower. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP will be Constructed at site and Disposal of sewage and sullage water will be done within project. |
| 13 | Solid Waste Management And Disposal System It Will be Provided as per Requirement and Norms |
| 14 | Water Conservation System It Will be Provided as per Requirement and Norms |
| 15 | Energy Management System Including Use of Renewable Energy Solar Panel will be provided as per Govt. Norms. |
| 16 | Fire Protection And Fire Safety System Fire Noc has been taken. and will be developed as per NOC requirements |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Common Public amenities will be provide in Integrated township. |
| 18 | Emergency Evacuation Services Fire satire case provided in tower as per Norms. |
| 19 | Other Miscellaneous Work As per specification Will be Provided. |
Registered agents
66 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ALMIGHTY INFRAESTATE PVT LTD | UPRERAAGT10163 |
| 3 | ALOK UPADHYAY | UPRERAAGT12497 |
| 4 | AMIT AGARWAL | UPRERAAGT11945 |
| 5 | AMIT GULATI | UPRERAAGT12150 |
| 6 | ARADHYA REAL ESTATE | UPRERAAGT13179 |
| 7 | ARCHANA GUPTA | UPRERAAGT10881 |
| 8 | Arvind Kumar Verma | UPRERAAGT12382 |
| 9 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 10 | Bamdev Upadhyay | UPRERAAGT14295 |
| 11 | CHANDRA PRAKASH | UPRERAAGT13704 |
| 12 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 13 | DAIWIK REALTORS | UPRERAAGT12075 |
| 14 | DHARMENDRA KUMAR PANDEY | UPRERAAGT10923 |
| 15 | DILIP KUMAR SINGH | UPRERAAGT10948 |
| 16 | Earth Homes Pvt. Ltd | UPRERAAGT11244 |
| 17 | GAUTAM ASSOCIATES | UPRERAAGT11617 |
| 18 | GOLDEN ESTATE | UPRERAAGT10397 |
| 19 | GUNJAN PANDEY | UPRERAAGT13682 |
| 20 | Hitesh Kesarwani | UPRERAAGT11538 |
| 21 | HITESH KHANNA | UPRERAAGT13833 |
| 22 | INVESTORS CARE INFRATECH PVT LTD | UPRERAAGT13542 |
| 23 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 24 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 25 | KAUSHTUBH REALTY PRIVET LIMITED | UPRERAAGT13025 |
| 26 | LINK PROPERTIES | UPRERAAGT10081 |
| 27 | M.S. Consultants | UPRERAAGT10079 |
| 28 | M.S. Property Consultants L.L.P. | UPRERAAGT10074 |
| 29 | MAYANK OJHA | UPRERAAGT10570 |
| 30 | MOHD AFZAL | UPRERAAGT13830 |
| 31 | Mr. Janardan Agarwal | UPRERAAGT10555 |
| 32 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 33 | Pankaj Mittal | UPRERAAGT13523 |
| 34 | PIXEL GLOBAL INFRA PRIVATE LIMITED | UPRERAAGT13936 |
| 35 | PRIYANK SHEKHAR | UPRERAAGT13933 |
| 36 | PROPERTY JUNCTION PRIVATE LIMITED | UPRERAAGT12902 |
| 37 | Purvanchal Buildhome | UPRERAAGT10883 |
| 38 | R K PROPERTIES | UPRERAAGT11201 |
| 39 | RADHESH CHANDRA | UPRERAAGT10484 |
| 40 | Raj Kumar Upadhyay | UPRERAAGT10920 |
| 41 | RAJEEV KUMAR SHUKLA | UPRERAAGT13288 |
| 42 | Rajni Dawra | UPRERAAGT13519 |
| 43 | RAJNI NIGAM | UPRERAAGT10897 |
| 44 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 45 | REENA PANDEY | UPRERAAGT11611 |
| 46 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 47 | Sachan Estate Pvt Ltd | UPRERAAGT10143 |
| 48 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 49 | SDR INFRA BUILD PVT LTD | UPRERAAGT11062 |
| 50 | SHASHI KANT SHUKLA | UPRERAAGT12289 |
| 51 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 52 | SHRI RUDRA REAL ESTATES | UPRERAAGT14251 |
| 53 | SILVER EDGE REAL ESTATE SOLUTION | UPRERAAGT12168 |
| 54 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 55 | SOURABH NIGAM | UPRERAAGT10900 |
| 56 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 57 | SUNIL KUMAR PRAJAPATI | UPRERAAGT12499 |
| 58 | Tushar Chandani | UPRERAAGT12001 |
| 59 | Varun Properties Inc. | UPRERAAGT11985 |
| 60 | VELOCITY DEVELOPERS | UPRERAAGT10813 |
| 61 | VIKAS PANDEY | UPRERAAGT11324 |
| 62 | VIKAS SINGH | UPRERAAGT12163 |
| 63 | vikram Jeet Singh Chadha | UPRERAAGT10805 |
| 64 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
| 65 | VISHAL BAJPAI | UPRERAAGT11344 |
| 66 | vishal srivastava | UPRERAAGT11982 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 21 Dec 2022. 2 of them carry a revalidation, the latest valid to 7 Aug 2027.
Sanctioned by Lucknow Development Authority · 9,368 sqm of land · an approved plan of 1 block and 131 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 42975 | 22 Dec 2017 | 21 Dec 2022 | 21 Dec 2025 | 21 Dec 2025 | — | |
| 42975 | 22 Dec 2017 | 21 Dec 2022 | 21 Dec 2025 | 21 Dec 2025 | 22 Dec 2017 | |
| 42975 | 22 Dec 2019 | 21 Dec 2022 | 8 Oct 2029 | 20 Jun 2026 | 22 Dec 2019 valid to 7 Aug 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 20 Jun 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 21 Dec 2025 | 20 Jun 2026 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
28 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 400 | 3730 | Khasra |
| 401 | 3260 | Khasra |
| 404 | 2150 | Khasra |
| 405 | 4670 | Khasra |
| 408 | 7100 | Khasra |
| 409 | 1240 | Khasra |
| 410 | 340 | Khasra |
| 411 | 4820 | Khasra |
| 412 | 2580 | Khasra |
| 413 | 3270 | Khasra |
| 414 | 4170 | Khasra |
| 480 | 5260 | Khasra |
| 399 | 1460 | Khasra |
| 406 | 130 | Khasra |
| 446 | 3160 | Khasra |
| Sale deed · 11160 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3837 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 124 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 197 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1343 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5358 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6849 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8495 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9435 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11158 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11195 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 18822 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · agreement The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · agreement The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · agreement The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 10 Nov 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Feb 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Feb 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Feb 2019 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 8 Jul 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 1 Feb 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 1 Feb 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Feb 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 26 Feb 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 1 Mar 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Feb 2019 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | 11.45% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | 11.45% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 74.78% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 80.72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 80.72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 91.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 93.61% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 99.07% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omaxe Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2386 |
| PAN | AAACO0171H |
| CIN / TAN | DELO01861G |
| Name of chairman | Mr. Rohtash Goel |
| Registered address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Grand Omaxe – Phase V, Lucknow – Omaxe Limited – RERA AccountBankICICI BANKBranchNEW DELHI CANNAUGHT PLACEA/C no.IFSCICIC0000007 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 4 ) → 225 (Under Registration - 4 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 5 ) → 224 (Under Registration - 4 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 4 ) → 224 (Under Registration - 5 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 5 ) → 223 (Under Registration - 4 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 220 (Under Registration - 3 ) → 223 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GH-1 Grand Omaxe Phase-5
Is GH-1 Grand Omaxe Phase-5 RERA registered?
Yes. GH-1 Grand Omaxe Phase-5 is registered with UPRERA under registration number UPRERAPRJ892218, registered on 5 Mar 2019. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GH-1 Grand Omaxe Phase-5?
The completion date filed with UPRERA is 20 Jun 2026. No completion certificate is on record yet.
Who is the builder of GH-1 Grand Omaxe Phase-5?
Omaxe Limited is the promoter entity that filed GH-1 Grand Omaxe Phase-5 with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted GH-1 Grand Omaxe Phase-5 more time to complete?
UPRERA's record carries 1 completion extension for GH-1 Grand Omaxe Phase-5, the latest running to 20 Jun 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does GH-1 Grand Omaxe Phase-5 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GH-1 Grand Omaxe Phase-5 located?
GH-1 Grand Omaxe Phase-5 is registered in Lucknow, as filed with UPRERA.
What configurations are available in GH-1 Grand Omaxe Phase-5?
The unit plan filed with UPRERA lists 2 BHK, 3 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GH-1 Grand Omaxe Phase-5?
The approved unit plan filed with UPRERA runs from 113 to 131 m² of carpet area (about 1,217 to 1,408 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GH-1 Grand Omaxe Phase-5?
The approved unit plan describes 1 block and 131 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GH-1 Grand Omaxe Phase-5?
About 57 units per acre: 131 planned units across 2.31 acres (9,368 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗